Section 1
U.S. Department of Energy LIMITED CHANGE
Washington, DC
Approved: 9-27-2022
SUBJECT: CHANGE TO DOE G 413.3-12 CHG 1, FRONT-END PLANNING AND PROJECT
DEFINITION RATING INDEX FOR NUCLEAR AND NON-NUCLEAR CONSTRUCTION
PROJECTS.
1. EXPLANATION OF CHANGES. This update to the existing G 413.3-12 Chg 1 (Admin
Chg) U.S. DOE Project Definition Rating Index Guide for Traditional Nuclear and Non-
Nuclear Construction Projects, provides updated project management front-end planning
best practices and tools to aid development of a comprehensive scope and assessment of
the maturity of scope planning for applicable projects. The guide aids fulfillment of the
requirement in DOE Order (O) 413.3B, Program and Project Management for the
Acquisition of Capital Assets. DOE Office of Project Management (PM) observations
during External Independent Reviews have often noted inappropriate use of the PDRI
tools. Additionally, DOE’s past program specific PDRI tools were custom made and do
not benefit from the updated research by Construction Industry Institute (CII). This CII
research has improved the PDRI tools, added a second dimension which provides better
insight and updates the validation basis of PDRI tools to over $135 billion worth of
projects. There are now 6 variations of the CII PDRI tool to better align with differing
types of construction projects. This update of the guide better aligns PDRI usage with
latest best practices, fixes problems with the Excel workbooks, and reinforces the use of
these tools throughout front-end planning to ensure mature scope for DOE projects.
2. LOCATIONS OF CHANGES:
Page Paragraph Changed To
Whole
Document
- - Deleted all references to CBAT.
Whole
Document
- Emphasized collaborative partnership
with CII as PDRI models and tools
evolve.
-
Whole
Document
- Included additional guidance on CII
PDRI tool.
-
Whole
Document
- Changed the structure in accordance
with PM-SOP-14-2020, “Project
Management Guide Format, Style, and
Structure.
-
1-2 Section 2 Added “Basis” section. -
5 Section 2.2 Added Figure 1, “Employing PDRI and
Front-End Engineering Design Maturity
and Accuracy Total Rating System
(FEED MATRS), Application Points”
-
7 Section 2.2 Added Table 1, “PDRI Application
Points Corresponding to CD Stage for
Small and Large Projects Based on CII
Tools”
-
DOE G 413.3-12A
Page Paragraph Changed To
8-9 Section 3 Shortened and revised section on
“Background”
-
11-12 Section 5 Schedule of Deliverables section. Clarification of the Schedule of
Deliverables
23 Section 6.10 Added additional resource to explain the
impact of N/A in scoring.
A-1-4 Appendix A Deleted Appendix A, “Glossary.” Re-
organized appendices.
A-1 and
C-1
Appendix A and
C
- Deleted Appendix D and F. Added
Appendices with PDRI Industrial CII
tool V5 example in Appendix A and
B. Re-organized appendices.