Department of Energy Office of Legacy Management Exemption to Specific DOE Order 151.1D, Comprehensive Emergency Management System Requirements
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
of
DC 20585
December 16, 2020
MEMORANDUM FOR INGRID KOLB
DIRECTOR
OFFICE OF MANAGEMENT
THROUGH CARMELO MELENDEZ
DIRECTOR
OFFICE OF LEGACY MANAGEMENT, LM-1
FROM: BRIAN STEWART
SAFETY AND HEALTH PROGRAM MANAGER
OFFICE OF LEGACY MANAGEMENT, LM-20
SUBJECT: Department of Energy Office of Legacy Management
Exemption to Specific DOE Order 151.1D, Comprehensive
Emergency Management System Requirements
This memorandum forwards the approved U.S. Department of Energy Office of Legacy
Management Request for Exemption from DOE Order 151.1D Chg 1 Requirements that
relieves Category 1 and 2 sites (and future sites of the same categories) managed by the
U.S. Department of Energy (DOE) Office of Legacy Management (LM) locations from
DOE Order 151.1D Chg 1, Comprehensive Emergency Management System, for
appropriate posting by the Departmental Directives Program on the DOE Directives
website.
LM used the following process steps to make the exemption determination:
1. Reviewed DOE Order 251.1D, Departmental Directives Program.
2. Site Management
Guide (SMG) (Guide 3-20.0-1.0-20-4). The SMG defines Category 1, 2, and
3 sites.
3. Collaborated with Office of Primary Interest and their relevant General Council
office.
4. Completed an emergency management risk assessment for each of the
Category 2 sites.
5. Conducted All-Hazards Surveys for each of the Category 3 sites.
ZZZZZZZZZZZ
As Head of the Departmental Element, I granted this exemption only after confirming
that the exemption:
1. Is not contrary to law or regulations;
2. Ensures adequate protection of the public, workers, and the environment; and
3. Remains consistent with the primary goal, intent, and purpose of the directive.
Please contact me, or Brian Stewart at (720) 377-3814, if you have any questions.
Attachment
cc w/attachment via email:
Charles Hopkins III, DOE-EO
Jeff Austin, DOE-LM
Jay Glascock, DOE-LM
Jeanie Gueretta, DOE-LM
Brian Stewart, DOE-LM
David Shafer, DOE-LM
Kenneth Thomas, DOE-NNSA HQ
Stephen Browning, Navarro
Teresa Gildersleeve, Navarro
Matthew Hadacek, Navarro
DOE Read File
File: FED/20/38
Separation Page Only for
U.S. Department of Energy Office of Legacy Management Request
for Exemption from DOE Order 151.1D Chg 1 Requirements
1
U.S. Department of Energy Office of Legacy Management Request
for Exemption from DOE Order 151.1D Chg 1 Requirements
The U.S. Department of Energy (DOE) Office of Legacy Management (LM), established in
2003, manages DOE’s responsibilities associated with the closure of World War II and Cold
War-era sites that the federal government operated to research, produce, and test nuclear
weapons and conduct other scientific and engineering research.
The operations that were conducted in this vast network of industrial facilities left a legacy of
radioactive and chemical waste, environmental contamination, and hazardous facilities and
materials at more than 100 sites.
LM has long-term stewardship responsibility and an obligation to protect human health and the
environment at these sites, which do not have continuing missions. Each year, LM issues the LM
Site Management Guide (Guide-3-20.0-1.0-20.4) as a reference document for LM and its
contractors. It provides accurate and consistent information regarding the regulatory driver,
programmatic framework, and categorization of LM’s sites. The most recent edition was
published in March 2020. The primary elements of the Site Management Guide are as follows:
Section 2
Site name and location (state)
Pre-LM name
Transferring organization
Actual transfer date (fiscal year [FY])
Planned transfer date (FY)
Regulatory drivers and programmatic framework
Site category
The guide includes data for the 100 sites currently under LM jurisdiction and the schedule for
transfer of projected future sites. Of particular interest to this discussion, the guide categorizes
each site based on the actual or anticipated long-term surveillance and maintenance (LTS&M)
activities associated with that site. The site category indicates the level of LTS&M activities that
are expected for each site. The long-term management of each LM site is designated as one of
three categories.
Using the Site Management Guide categorization criteria, LM requests the following exemptions
from the requirements of DOE Order 151.1D Chg 1, Comprehensive Emergency Management
System, by category for current and future sites:
Category 1 Sites
The Site Management Guide defines category 1 as sites that “typically include records-related
activities and stakeholder support.” Forty-three sites are currently classified as category 1.
By definition, LM provides only the records-retention function. LM has no daily physical
presence or ongoing mission activity at these sites. In addition, LM is not responsible for any
2
physical location that the records reference or the facility at which they originated. For these
reasons, there is no increase in the risk to human health or the environment associated with
records-related activities or performance of stakeholder support functions.
Request: Based on the absence of risk associated with the category 1 sites, a “categorical
exemption” to the requirements of DOE Order 151.1D Chg 1 is requested.
Category 2 Sites
The Site Management Guide defines category 2 sites as those that “typically include routine
inspection (any site visit needed to verify the integrity of engineered or institutional barriers) and
monitoring/maintenance, records-related activities, and stakeholder support.” At sites
characterized as category 2, workers are not physically present every day. Forty-eight sites are
currently classified as category 2.
These category 2 sites do not have active missions, and hazardous materials do not exceed
threshold quantities or may be excluded from further analysis because of their physical form or
other factors. Routine inspections are provided at various intervals and are needed to verify the
integrity of engineered or institutional barriers.
For category 2 sites, the implementation of a fully compliant Emergency Management System
would place undue financial stress on LM and provide little or no benefit of additional protection
to workers and the environment.
Request: Based on the absence of additional risk posed by inspection and monitoring at category
2 sites, a “categorical exemption” to the requirements of DOE Order 151.1D Chg 1 is
requested, with the caveat that measures are in place to protect inspection workers in the event
of an emergency.
The following measures will be implemented:
1. Employee training on how to safely evacuate the site and notify LM and local emergency
response authorities, as needed, of emergency conditions.
2. A site emergency management risk assessment will be completed for any exempt
category 2 site to confirm they do not pose additional risk to the protection of human life
and the environment.
Section 3
3. If a remedial action system undergoes temporary operational or maintenance activity, the
activity will be evaluated to determine if the site will require additional emergency
management attention or recategorization during the activity.
3
Category 3 Sites
The Site Management Guide defines category 3 sites as those whose “activities typically include
operation and maintenance of active remedial action systems, routine inspection (any site visit
needed to verify the integrity of engineered or institutional barriers) and monitoring and
maintenance, records-related activities, and stakeholder support.” These sites add active
operational and maintenance activities to the functions associated with category 2 sites. Daily
physical presence of employees is expected, and the performance of these functions has the
potential to add some risk to the protection of human life and the environment.
Currently, nine LM sites are classified as category 3. However, seven of the category 3 sites are
populated by 10 or fewer employees. If this exemption is approved, the following sites would be
exempt from DOE Order 151.1D Chg 1 Section 14(2)(b) (annual exercise) requirements:
Grand Junction, Colorado, Disposal/Processing Sites
Monticello, Utah, Disposal and Processing Sites
Mound, Ohio, Disposal Site
Pinellas County, Florida, Site
Rocky Flats Site, Colorado
Shiprock, New Mexico, Disposal Site
Tuba City, Arizona, Disposal Site
An exemption from DOE Order 151.1D Chg 1 requirements is also requested for general office
buildings owned or leased by DOE to fulfill LM’s mission. These facilities will be managed in
accordance with federal, state, and local standards applicable to general use facilities. If this
exemption is approved, the following general office buildings owned or leased by DOE would be
exempt from DOE Order 151.1D Chg 1 requirements:
LM Business Center at Morgantown, West Virginia
LM Field Support Center at Grand Junction, Colorado (LM office at Grand Junction,
Colorado)
LM office in Pinellas County, Florida
LM Operations Center at Westminster, Colorado (LM office at Westminster, Colorado)
LM office at Window Rock, Arizona
An All Hazards Survey (AHS) is required for each category 3 site with documentation that
hazardous materials do not exceed threshold quantities or that they may be excluded from further
analysis because of their physical form or other factors. When this is not the case, a quantitative
4
Emergency Planning Hazards Assessment must be documented and further emergency
management-related requirements may apply as delineated in DOE Order 151.1D Chg 1
Attachment 4, “Emergency Management Hazardous Materials Program.”
Request: Each of the nine category 3 sites have been evaluated against the appropriateness of
each functional element in DOE Order 151.1D Chg 1 Attachment 3, “Emergency Management
Core Program.” Specific relief from the annual site-level exercise requirement in Section 14,
“Readiness Assurance,” (performing exercises) is requested.
This requirement seems to be impractical when the category 3 site has 10 or fewer assigned
workers. When a category 3 site has greater than 10 workers assigned, all functional elements in
Attachment 3 will be incorporated into LM’s Emergency Management Program.
Section 4
The selection of 10 or fewer employees as the quantifying number for this exemption request is
based on National Fire Protection Association Standard 1.01 Paragraph 7.2.1.1.3.1, which uses
greater than 10 people as the threshold to define an occupied building, and Title 29 Code of
Federal Regulations Section 1910.38(b) (29 CFR 1910.38[b]), which similarly allows
emergency action plans to be communicated orally (instead of in writing) if the workforce
consists of 10 or fewer employees. Conducting the annual site-level exercises at locations
populated with more than 10 workers would provide a more realistic venue for testing and
validating organizational emergency plans and procedures.
It is understood that all category 3 sites would conduct worker drills at the required frequency
specified in Attachment 3 Section 5(d)(1) and emergency response organization member drills
specified in Section 5(e)(1). The annual site-level exercise required in Attachment 3 Section
14(2)(b) would be rotated among hazards and risks identified in the AHS at sites having a
population exceeding 10 employees.
5
Approvals
This U.S. Department of Energy Office of Legacy Management Request for Exemption from
DOE Order 151.1D Chg 1 Requirements was prepared in accordance with DOE Order 151.1D
Chg 1.
Approved: Date:
Carmelo Melendez
Director
Office of Legacy Management
Reviewed: Date:
Peter O’Konski
Deputy Director
Office of Legacy Management
Reviewed: Date:
David S. Shafer, PhD
Deputy Director of Field Operations
Office of Legacy Management
Reviewed: Date:
Jay Glascock
Westminster Office Manager
Uranium Mine Task Assignment
Manager
Office of Legacy Management
Reviewed: Date:
Brian Stewart
Safety and Health Program Manager
Office of Legacy Management
Brian S. Stewart
Digitally signed by Brian S.
Stewart
Date: 2020.12.07 16:57:47 -07'00'
Jay D.
Glascock
Digitally signed by Jay D.
Glascock
Date: 2020.12.08 08:41:50
-07'00'
David S. Shafer Digitally signed by David S. Shafer
Date: 2020.12.08 10:29:03 -07'00'
Carmelo
Melendez
Digitally signed by
Carmelo Melendez
Date: 2020.12.16
16:43:05 -05'00'
Carmelo
Melendez
Digitally signed by
Carmelo Melendez
Date: 2020.12.23
08:33:10 -05'00'