Scaffolding
General purpose scaffolding. Scaffolding erected for a particular work operation should be charged to the appropriate account. This is an indirect cost, only if not associated with a particular work operation.
Source 1:
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE-STD-1050-93Guideline to Good Practices for Planning, Scheduling, and Coordination of Maintenance at DOE Nuclear Facilities
- DOE-STD-1069-94Guideline to Good Practices for Maintenance Tools and Equipment Control at DOE Nuclear Facilities
- DOE-STD-1072-94Guideline to Good Practices for Facility Condition Inspections at DOE Nuclear Facilities
- DOE G 433.1-1A Chg 1 (Admin Chg)Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B
- DOE G 433.1-1ANuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B
- DOE-STD-1180-2004Construction Management Functional Area Qualification Standard
- DOE G 433.1-1Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1
- DOE-HDBK-1141-2001 Module 8-12Radiological Assessor Training - Student's Guide Module 8-12
- DOE-STD-1160-2003Occupational Safety Functional Area Qualification Standard
- DOE-STD-1120-2005 Volume 2Integration of Environment, Safety, and Health Into Facility Disposition Activities, Volume 2 - Appendices
- DOE-STD-1041-93 Chg Notice 1Guide to Good Practices for Shift Routines and Operating Practices
- DOE-STD-1151-2002Facility Representative Functional Qualification Standard
- DOE-STD-1151-2010Facility Representative Functional Area Qualification Standard
- DOE G 580.1-1A Chg1 (LtdChg)Personal Property
- DOE-HDBK-1141-2001 Module 8-10Radiological Assessor Training - Instructor's Guide Module 8-10
- DOE-STD-1160-2011Occupational Safety Functional Area Qualification Standard
- DOE-HDBK-1169-2003Nuclear Air Cleaning Handbook, Chapter 6, Small Air Cleaning Units
- DOE G 580.1-1APersonal Property
- DOE-HDBK-1169-2003Nuclear Air Cleaning Handbook, Chapter 2, System Considerations
- DOE-HDBK-1211-2014Activity-Level Work Planning and Control Implementation