Archives of Directives

Rough Order of Magnitude Estimate

An estimate based on high-level objectives, provides a high-level view of the project deliverables, and has lots of wiggle room. Most ROM estimates have a range of variance from -25% all the way to +75%.
Mentioned in (auto-detected)

Something wrong with this record? Tell us