Drawings
As part of an A/E design effort, drawings are typically a deliverable. These are design drawings that depict how a facility should look after the construction is complete. Also referred to as as-built drawings.
Source 1:
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE-HDBK-1016/2-93DOE Fundamentals Handbook, Engineering Symbology, Prints, and Drawings, Volume 2 of 2
- DOE-HDBK-1016/1-93DOE Fundamentals Handbook, Engineering Symbology, Prints, and Drawings, Volume 1 of 2
- SD 413.3 Admin Chg 1Program and Project Management for the Acquistion of Capital Assets
- SD 413.3 Admin Chg 1, Program and Project Management for the Acquisition of Capital Assets - Redline
- SD 413.3Program and Project Management for the Acquisition of Capital Assets
- DOE O 1324.2A Chg 1Records Disposition
- Interim General Guidance Regarding up to Thirty-Year Protected CRADA Information
- DOE-STD-1051-93Guideline to Good Practices for Maintenance Organization and Administration at DOE Nuclear Facilities
- DOE G 413.3-12U.S. Department of Energy Project Definition Rating Index Guide
- DOE-STD-1180-2004Construction Management Functional Area Qualification Standard
- DOE G 430.1-1Cost Estimating Guide
- DOE-SPEC-3019-96Valve-Regulated Type Lead-Acid Storage Batteries
- DOE G 413.3-12 Chg 1 (Admin Chg)U.S. Department of Energy Project Definition Rating Index Guide for Traditional Nuclear and Non-Nuclear Construction Projects
- DOE-SPEC-3018-96Flooded-Type Lead-Acid Storage Batteries
- DOE-STD-1025-2008Weapon Quality Assurance Qualifications Standard
- FAQs for Cancellation of Three Department of Energy Functional Area Qualification Standards
- DOE G 413.3-12AFront-End Planning and Project Definition Rating Index for Nuclear and Non-Nuclear Constructions Projects
- DOE-STD-1162-2003Instrumentation and Control Functional Area Qualification Standard
- DOE-STD-1197-2024Causal Analysis
- DOE-STD-1073-2003Configuration Management