Acquisition Program or Project
Acquisitions of capital assets, equal to or greater than $5 million, regardless of the funding source, that deliver a product or capability, with a specified beginning and end, stated cost, and expected performance objectives. They are directed with the purpose of providing a…
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- NAP 413.9Cost Analysis Requirements Description
- NAP-28Responsibilities for Independent Cost Estimates
- SD 452.3-2Phase 6.X Process
- NAP 413.3Responsibilities for Independent Cost Estimates
- NAP-28AResponsibilities for Independent Cost Estimates
- NAP 413.3AResponsibilities for Independent Cost Estimates
- NAP 413.3A Admin Chg 1Responsibilities for Independent Cost Estimates
- BOP 413.9, Cost Analysis Requirements Description (Redline)
- BOP-06.08Cost Analysis Requirements Description
- BOP 413.9Cost Analysis Requirements Description
- SD 452.3-2APhase X/Phase 6.X Processes
- DOE G 413.3-13U.S. Department of Energy Acquisition Strategy Guide for Capital Assets Projects
- DOE G 413.3-13 Chg 1 (Admin Chg)U.S. Department of Energy Acquisition Strategy Guide for Capital Asset Projects