Accountability Measurements
A quantitative measurement of the amount of nuclear material in an item of location made to establish initial book values for the material or to replace the existing book value with a more accurate measureed value.
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE M 474.1-1Manual for Control And Accountability of Nuclear Materials
- DOE M 474.1-1AManual for Control and Accountability of Nuclear Materials
- DOE O 5633.3AControl and Accountability of Nuclear Materials
- DOE O 5633.3BControl and Accountability of Nuclear Materials
- DOE M 474.1-1BManual for Control and Accountability of Nuclear Materials
- DOE M 470.4-6Nuclear Material Control and Accountability
- DOE M 470.4-6 Chg 1Nuclear Material Control and Accountability
- DOE O 474.1Control and Accountability of Nuclear Materials
- DOE O 474.1AControl and Accountability of Nuclear Materials
- DOE-STD-1194-2011Nuclear Materials Control and Accountability
- DOE-STD-1194-2001 Chg Notice 1Nuclear Materials Control and Accountability
- DOE-STD-1194-2011 Chg Notice 2Nuclear Materials Control and Accountability
- DOE O 474.2A Chg 1 (AdminChg)Nuclear Material Control and Accountability
- DOE-STD-1194-2011 Chg Notice 3Nuclear Materials Control and Accountability
- DOE O 474.2ANuclear Material Control and Accountability
- DOE-STD-1194-2019Nuclear Materials Control and Accountability
- DOE O 474.2Nuclear Material Control and Accountability
- DOE O 474.2 Chg 4 (PgChg)Nuclear Material Control and Accountability
- DOE O 474.2 Admin Chg 1Nuclear Material Control and Accountability
- Frequently Asked Questions for DOE O 474.2A