Section 1
iP HE Oe, Department of Energy
J TW i eS National Nuclear Security Administration
Washington, DC 20585
October 23, 2012
MEMORANDUM FOR THE NEVADA SITE OFFICE MANAGER
FROM: DONALD COOK
DEPUTY ADMINISTRATOR
FOR DEFENSE PROGRAMS me
SUBJECT: Relief from Department of Energy (DOE) Facility Safety Order
Requirements for Fire Suppression in the Ula Complex
REFERENCES: (1) Memorandum, S. Mellington to D. Cook, Request for
Permanent Exemption from the Fire Protection Requirements
Designated in [DOE O 420.1B and DOE STD-1066-99] for the
Ula Complex in Area I of the Nevada National Security Site,
dated August 13, 2012
(2) Memorandum, D. Cook to S. Mellington, Temporary Relief
from DOE Facility Safety Order Requirements for Automatic
Fire Suppression in Area | of the Ula Complex at the Nevada
National Security Site, dated April 17, 2012
(3) PEP-DESS-1020, National Security Technologies
Underground Safety and Health Standards Project Execution
Plan, dated July 27, 2012
I approve the subject exemption to support dynamic experiment campaigns in the Ula
Complex at the Nevada National Security Site (NNSS), subject to the conditions included
in this memorandum. The Office of Health, Safety and Security (HSS) commented on
the request, and the Central Technical Authority (CTA) concurred on this relief from fire
suppression in separate correspondence, subject to the same conditions.
SPECIAL CIRCUMSTANCES
Relief is granted from the Department of Energy (DOE) Order (O) 420.1B, Facility
Safety Chapter II, [ 3.c (4), which requires automatic fire suppression throughout all
significant facilities or where the fire loss potential exceeds DOE monetary loss limits;
Chapter II, 4 3.c (1) which specifies “a reliable and adequate water supply for fire
suppression;” and Chapter II, {] 3.c (9) which stipulates “physical access and appropriate
equipment... for effective fire department intervention.” The approval applies to the
surface buildings (Ula Air Building, Ula Hoist House, and Ulh Hoist House) and the
® Printed with soy ink on recycled paper
Ula Complex underground drift areas in Area 1 of the NNSS where dynamic
experiments are planned.
SAFETY ASSURANCE
The Ula Complex underground is a structure unique to DOE. There is no single,
consensus standard directly applicable to the construction, and operations of the NNSS
underground facilities. The DOE directive from which this exemption is sought does not
specifically address facilities like the Ula Complex (that is, shaft-accessed underground
facilities/laboratories). Going forward, in order to establish regulatory certainty, NSTec
will generate the NNSS Underground Safety and Health document tailored to the NNSS
application. This new document will establish requirements selected from appropriate
current regulations, DOE directives and consensus codes and standards. NSTec will
interact with the DOE Fire Safety Committee to ensure that the document will be
consistent with DOE fire safety policy and practices. Following approval by NSO, this
new document will be validated by the Chief of Defense Nuclear Safety (CDNS) using
outside experts as appropriate. NSTec will incorporate the NNSS Underground Safety
and Health document into the NSTec 10 CFR 851, Worker Safety and Health Program.
Per existing requirements, NSO approves the NSTec Worker Safety and Health Program.
Section 2
HSS has formed the subterranean sub-committee under the DOE Fire Safety Committee
to devise appropriate fire protection requirements for underground structures. These
requirements will be incorporated into a new or existing DOE directive that will be fully
implemented at Ula as required.
The initial Long-Term Fire Protection Strategy for the Ula Complex is provided in the
Project Execution Plan (PEP), Reference 3. The initial Strategy will be adjusted
(becoming the Long-Term Fire Protection Strategy for the Ula Complex) based on
evaluation of the underground complex against the NNSS Underground Safety and
Health document, scheduled for completion in FY 2013, and adjusted again once DOE
approves additional directives to address underground structures.
To support the exemption request, operating conditions for the Ula Complex include _
check-in/check-out access to the underground; combustible loading control and hot work
programs; the training and exercising of workers to suppress potential fires, don
protective apparatus and egress to active hoists or refuge chambers; decreased normal and
maximum occupancy for the underground; and visitor to escort ratio.
Additionally, the fire alarm/detection system and robust fire barrier in the active
underground experiment area ensure early warning to occupants, prompt implementation
of protective actions (evacuate the underground, shelter in place, or egress to protected
refuge chambers), limited fire and smoke spread; and, fire department dispatch to protect
surface facilities in the event of a fire. Reference 1 outlines the bases of the exemption
request.
Finally, the terms and conditions of the previous temporary exemption approval
(Reference 2) have been satisfied. Specifically, upgrades to training and procedures
resulting from the resolution of Nevada Site Office (NSO) comments on the Life Safety
Code equivalency were completed and long-term facility upgrades are documented in the
PEP.
APPROVAL CRITERIA
DOE 0 251.1C, Departmental Directives Program allows exemptions to be granted only
if the following criteria are met:
a) [it] is not prohibited by law;
Section 5.b.2 of DOE O 420.1B identifies a responsibility of the DOE Secretarial
Officers to review and approve requests for exemptions from requirements of the
Order.
b) would not present an undue risk to public health and safety, the environment,
facility workers, or security; and
New experiment areas are outfitted with appropriate physical features (access to
refuge chambers, robust fire barrier, remotely monitored fire alarm and detection)
and programmatic measures (limited access, worker training, and combustible
loading and hot work controls) which minimize risk to the workers, public,
environment, facility and security.
is warranted under the circumstances.
The cost to be fully compliant with the Order currently exceeds what is
programmatically available. NNSA has balanced priorities and has determined
that any potential impact on worker or public health and safety is minimal.
TERMS AND CONDITIONS
The following terms and conditions apply to this exemption:
1.
Once new or revised DOE directives that explicitly address life safety and fire
protection requirements for subterranean structures are published, applicable
requirements must be fully implemented within the implementation period associated
with the directives.
This exemption does not go into effect until NSO has approved the initial Long-Term
Fire Protection Strategy for the Ula Complex (provided in the Project Execution
Plan, Reference 3).
Section 3
This exemption will remain in effect, all or in part, until new or revised DOE
directives explicitly addressing life safety and fire protection requirements for
10.
subterranean structures supersede all or part of its provisions, and are implemented
for Ula.
Prior to the next activity (following Pollux) involving Hazard Category 3 or greater
quantities of nuclear materials in Ula:
a. The NNSS Underground Safety and Health document must be developed and
coordinated as described in this memorandum.
b. Actions required to implement the approved NNSS Underground Safety and
Health document must be incorporated into the approved Long Term Fire
Protection Strategy. The Long Term Fire Protection Strategy will detail
annual task plans and out-year planning targets for upgrading the fire
protection posture of the Ula Complex.
Following NSO approval, the new NNSS Underground Safety and Health document
must be submitted to CDNS for validation.
An FHA revision must be initiated immediately following approval of the NNSS
Underground Safety and Health document, which is committed for completion in
FY13.
As conditions change in the Ula Complex underground, new experiments are
proposed, long term upgrades are delayed, or as changes to the Documented Safety
Analysis (DSA) are made, NSO must evaluate whether the terms of the exemption are
compromised so as to require a new exemption request.
NNSA must reevaluate periodically the basis for the exemption approval to determine
whether the conditions that support the exemption still apply. This reevaluation must
be done at a minimum when the following are revised: Ula DSA, Ula Fire Hazards
Analysis (FHA), and the NNSS Underground Safety and Health document. This can
be accomplished also through normal oversight, performance monitoring or NNSA
biennial reviews. NSTec with NSO input must prepare a revised exemption request, if
warranted.
NSO must approve changes to Long-Term Fire Protection Strategy for the Ula
Complex.
These Terms and Conditions must be entered and tracked to completion in NSTec
and NSO action tracking systems. NSO must monitor completion of the upgrades
proposed in the Long-Term Fire Protection Strategy for the Ula Complex. NSO must
notify Headquarters periodically on the progress of the Long-Term Fire Protection
Strategy for the Ula Complex. Note that CDNS will actively track completion of
these terms and conditions.
If you have any questions regarding this approval, please contact Mr. Jim McConnell at
(202) 586-4379 or have your staff contact Ms. Sharon Steele at (202) 586-9554.