Section 1
HR NY IC™ 3a) Department of Energy
WING a4 National Nuclear Security Administration
National Nuclear Security Administration Washington, Dc 20585
IAPR 17 202
MEMORANDUM FOR THE NEVADA SITE OFFICE MANAGER
FROM: DONALD L. COOK
DEPUTY ADMINISTRATOR aA
FOR DEFENSE PROGRAMS
SUBJECT: Temporary Relief from DOE Facility Safety Order Requirement
for Automatic Fire Suppression in Area 1 of the Ula Complex
at the Nevada National Security Site
REFERENCES: (1) Memorandum, S. Mellington to D. Cook, Request for
Permanent Exemption from the Fire Protection
Requirements Designated in [DOE O 420.1B and DOE STD-
1066-99] for the Ula Complex in Area 1 of the Nevada
National Security Site, dated June 13, 2011
I approve the subject exemption requested in Reference 1, only during the surrogate
testing phase of the Gemini experiments in 2012. The Office of Health, Safety and
Security (HSS) commented on the request, and the Central Technical Authority (CTA)
concurred on this temporary relief from automatic suppression in separate
correspondence.
SPECIAL CIRCUMSTANCES
A temporary relief is granted from DOE O 420.1B, Facility Safety Chapter II, ¥ 3.c (4),
which requires automatic fire suppression throughout all significant facilities or where
the fire loss potential exceeds Department of Energy (DOE) monetary loss limits. The
approval applies to the surface buildings (Ula Air Building, Ula Hoist House, and Ulh
Hoist House) and the Ula underground drift areas of the Ula Complex in Area 1 of the
Nevada Nuclear Security Site (NNSS). A separate permanent exemption request and
approval will be necessary to allow NNSS to execute sub-critical experiment campaigns
in the Ula underground complex without having to install automatic fire suppression.
SAFETY ASSURANCE
I have evaluated the request and concluded that a combination of existing physical
features and programmatic measures help to ensure the safety of workers at the Ula
complex. Operating conditions for the Ula Complex include limited access to the
facility; combustible loading control and hot work programs; the training and drilling of
workers to suppress potential fires, don protective apparatus and egress to refuge
@ Printed with soy ink on recycled paper
chambers; escort requirements for visitors; and minimal set up and operation time for
each experiment campaign.
Additionally, the fire alarm/detection system and robust fire barrier in the experiment
area ensure early warning to occupants, prompt egress to protected refuge chambers,
limited fire and smoke spread; and, fire department dispatch to protect surface facilities in
the event of a fire.
APPROVAL CRITERIA
DOE O 251.C allows exemptions to be granted only if the following criteria are met:
a) [it] is not prohibited by law;
Section 5.b.2 of DOE O 420.1B identifies a responsibility of the DOE Secretarial
Officers to review and approve requests for exemptions from requirements of the
Order.
b) would not present an undue risk to public health and safety, the environment,
facility workers, or security; and
The new experiment area is outfitted with appropriate physical features (access to
refuge chambers, robust fire barrier, remotely monitored fire alarm and detection)
and programmatic measures (limited access, worker training, and combustible
loading and hot work controls) which minimize risk to the workers, public,
environment, facility and security.
is warranted under the circumstances.
Section 2
The cost to be fully compliant with the Order exceeds what is programmatically
available. NNSA has balanced priorities and determined that any potential impact
on worker or public health and safety is minimal.
TERMS AND CONDITIONS
The following terms and conditions apply to this exemption:
1.
Temporary relief from automatic fire suppression requirement in DOE O 420.1B
expires at the conclusion of the surrogate testing phase in 2012.
NSO reviews NSTec’s determination of equivalency to Life Safety Code
requirements for underground egress and exiting. All NSO comments shall be
satisfactorily resolved prior to commencing the surrogate testing phase.
. Any necessary upgrades to training and procedures resulting from the Life Safety
Code equivalency request shall be completed prior to commencing the surrogate
testing phase. All facility upgrades shall be included in the long term fire protection
strategy for Ula.
If you have any questions regarding this approval, please contact Mr. Jim McConnell at
(202) 586-4379 or have your staff contact Ms. Sharon Steele at (202) 586-9554.
cc: D. Nichols, NA-SH-1
C. Deeney, NA-11
J. McConnell, NA-17
M. Blackburn, HS-32
J. Bisker, HS-32
Docketing Clerk, HS