Approval of Nuclear Safety Delegations Y-12 Site Office (NA)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
Department of Energy
National Nuclear Security Administration
Washington, DC 20585
~~26,2007
MEMORANDUM FOR MAN~ Y-12 SITE OFFICE
FROM: Thomas P. D' Agostino
SUBJECT:
REFERENCE:
Deputy Administrator
for Defense Programs
APPROVAL OF NUCLEAR SAFETY DELEGATIONS
(I) Memorandum from Sherry to D'Agostino, National Nuclear
Safety Delegation Procedure, dated November 3, 2006;
(2) Memorandum from Sell to Brooks et. al., Delegation of Safety
Authorities, dated December 27, 2005; and
(3) National Nuclear Security Administration (NNSA) Delegation
Procedure.
The nuclear safety delegations requested by Reference ( 1) were reviewed against the Deputy
Secretary criteria promulgated by Reference (2). I approve the following nuclear safety
delegations as requested in the Reference (I).
Ted Sherry,
Manager, YSO
Douglas Dearolph
Authorization Basis CABl- i.e., approval of Documented Safety
Analyses (DSAs, including preliminary DSAs), technical safety
requirements (TSRs), safety evaluation reports (SERs), and unreviewed
safety question (USQ) procedures; Startup and Restart of Category 3
nuclear facilities and high hazard non-nuclear facilities and Restart of
Category 2 nuclear facilities; Integrated Safety Management System
(ISMS) - i.e., approval of annual contractor ISMS description updates;
and exemptions from the requirements of the Department of Energy
(DOE) Order 420.1B.
AB - approval ofDSAs (DSAs, including preliminary DSAs), TSRs,
SERs, and USQ procedures; these authorities should be exercised
during periods when Mr. Sherry is not available to be consulted and
timely approvals would be necessary to support continued safe
operations. Mr. Dearolph is delegated authority at all times to approve
revisions to existing AB documents.
ISMS - i.e., approval of annual contractor ISMS description updates.
V -12 SITE OFFICE
COR No t2-'iJ,k .. 1-£•32'
FILE CO E
~----
For the authority to approve exemptions to DOE Order 420.1B, please note that Central
Technical Authority (CT A) concurrence is required by National Nuclear Security
Administration (NNSA) Supplemental Directive NA-1 SD 251.1-1. I expect that you will
concurrently notify me with each request for CT A concurrence with exemptions to this
Order.
As noted in Reference ( 1 ), the delegations for Mr. Dearolph would be exercised during
periods when you are not available to be consulted and timely approvals would be necessary
to support continued safe operations.
2
Approval of contractor Quality Assurance Programs (QAPs) is not included in the scope of
Reference 3, however, based on a review by my staffofthe Y-12 Site Office (YSO) quality
assurance processes, I concur with the delegation of authority to Mr. Ted Sherry, and in his
absence, Mr. Dan Hoag to approve contractor QAPs and associated authorities as identified
in the NNSA Functions, Responsibilities and Authorities Manual. Similarly, the legacy
delegation of approving the contractor's Radiation Protection Program, although not included
within the scope of the NNSA Delegation Procedure, is affinned.
Delegations are valid and remain in effect so long as the above individuals serve at YSO,
maintain credited qualifications, and so long as YSO retains adequate Site Office capabilities
and capacities, as described in Reference (3).
The NNSA CTA has concurred with the delegation of AB approval authority below the level
of Site Office Manager.
cc:
J. McConnell, NA-2.1
W. White, NA-2.1
S. Goodrum, NA-12
X. Ascanio, NA-17
D. Dearolph, YSO
D. Hoag, YSO