DOE O 5560.1A, Priorities and Allocations Program
Functional areas: Emergency Preparedness
Cancels DOE O 5560.1. Canceled by DOE O 544.1.
Superseded By:
DOE O 544.1, Priorities and Allocations Program on Oct 12, 2004
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE O 544.1Priorities and Allocations Program (Oct 12, 2004)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DISTRIBUTION: INITIATED BY:
All Departmental Elements Procurement and Assistance
Management Directorate
U.S. Department of Energy ORDER
Washington, D.C.
5-8-85
SUBJECT: PRIORITIES AND ALLOCATION PROGRAM
1. PURPOSE. To establish policies and procedures for the administration of the
Department of Energy (DOE) priorities and allocations program for industrial products,
materials, and services.
2. CANCELLATION. DOE 5560.1, PRIORITIES AND ALLOCATIONS PROGRAM, of
11-5-82.
3. SCOPE. The provisions of this Order apply to all Departmental Elements and
contractors performing work for the Department as provided by law and/or contract and
as implemented by the appropriate contracting officer.
4. REFERENCES. The following references are available from DOE, Property and
Equipment Management Division, MA-422, 1000 Independence Avenue, SW.,
Washington, DC 20585.
a. Defense Production Act of 1950, of 9-8-50, as amended, 50 U.S.C. Appendix
2061 et seq., Title I, which authorizes the President to establish priorities and
allocate materials and facilities in the performance of contracts or orders
necessary to promote the national defense or maximize domestic energy supplies,
and to require the acceptance of such contracts or orders to ensure such priorities.
b. Executive Order 10480, "The Administration of the Defense Mobilization
Program," of 8-18-53, as amended, 50 U.S.C. Appendix 2153, which delegates to
the Federal Emergency Management Agency (FEMA) the President's national
defense priorities and allocations authorities in Title I, section 101(a) of the
Defense Production Act of 1950, as amended.
c. Title 44 CFR, Part 322, "Defense Mobilization Order 3, Defense Production:
Priorities and Allocations Authority," of 11-6-63, which establishes FEMA policy
guidance with regard to the use of the priorities and allocations authority in
Executive Order 10480.
d. Defense Priorities and Allocations System Delegation 2, "Delegation of Authority
to the Secretary of Energy," of 8-29-84, which authorizes the Secretary of Energy
to: (1) place rated contracts and orders for the procurement of products, materials,
and services required for atomic energy construction, operations, and research
DOE 5560.1A
DOE 5560.1A
5-8-85
e.
f.
g.
h.
i.
j.
k.
and development programs subject to conditions stated in the delegation;
and (2) find that specified material or equipment is critical and
essential to maximize domestic energy supplies.
Executive Order 11912, “Delegation of Authorities Relating to Energy
Policy and Conservation,” of 4-13-%6, which delegates to the Secretary
of Energy the President’s priorities and allocations authorities to
maximize domestic energy supplies in Title I, section 101(c), of the
Defense Production Act of 1950, as amended.
Title 44 CFR, Part 330, Defense Mobilization Order 13, "Policy Guidance
and Delegation of Authorities for use of Priorities and Allocations to
Maximize Domestic Energy Supplies in Accordance with Subsection 101(c)
of the Defense Production Act of 1950, as amended,” of 1O-4-76, which
establishes FEMA policy guidance with regard to the use of the priori-
ties and allocations authority in Executive Order 11912.
Title 15 CFR, part 350, chapter III, subchapter B, of 8-29-84, which
contains the official texts of the regulation and related documents of
the defense priorities and allocations system. The regulation pro-
vides for the priority production, scheduling, and preferential treat-
ment of contracts and orders placed in support of authorized military
and DOE atomic energy construction, operations, and research and devel-
opment programs, and programs which are determined by DOE to maximize
domestic energy supplies.
Section 2
Title 10 CFR, Part 216, “Materials Allocation and Priority Performance
Under Contracts or Orders to Maximize Domestic Energy Supplies,” of
2-6-78, which contains the rules, regulations, and procedures for
implementing the DDE priorities and allocations program for supplies
of materials and equipment necessary to maximize domestic energy
supplies.
DOE/PR-0042, “Priorities and Allocations Support for Energy: Keeping
Energy Programs on Schedule,” of 8-80, which describes priorities and
allocations support, and lists the criteria for granting rating author-
ity for programs which maximize domestic energy supplies.
Title 48 CFR Chapter 9, Department of Energy Acquisition Regulation,
Subparts 912.3, 950.212, and 970.5204-33, which explain the use of and
describe clauses for DOE participation in the industrial priorities
and allocations program for atomic energy programs and programs which
maximize domestic energy supplies.
Title 48 CFR Chapter 1, Federal Acquisition Regulation, Subpart 12.3,
which implements the defense priorities and allocations system regu-
lation in prescribing policies and procedures relating to the use of
2
DOE 5560.1A
5-8-85
the defense priorities and allocations system in solicitations and
contracts.
l. Public Law 86-777, the “Helium Act Amendments of 1960,” of 9-13-60,
which provides the authority by which the Secretary of Interior requires
DOE to collect and report periodic helium requirements.
5. DEFINITIONS. In addition to the definition; contained in the defense
priorities and allocations system regulation and 10 CFR 216,
the following terms are defined for DOE.
a. Allotment. An authorization by a delegate agency of the amounts and
kinds of controlled materials which may be procured or used for
authorized programs during specified periods of time.
b. Authorized Program Identifications.
(1) E1 - Atomic energy construction and alteration for the account
of DOE.
[2) E2 - DOE atomic energy operations, including maintenance, repair,
and operating supplies.
(3) E3 - Expansion of privately owned facilities exclusively or primarily
for DOE atomic energy program purposes.
(4) F1 - Energy exploration, production, refining, and transportation.
(5) F2 - Conservation of energy supplies.
(6) F3 - Construction and maintenance of energy facilities.
c. Controlled Materials. The various shapes and forms of steel, copper,
aluminum, and nickel alloys, whether new, remelted, rerolled or
redrawn, as specified in schedule II, and as defined in schedule III,
of the defense priorities and allocations system regulation.
d. Defense Priorities and Allocations system. A regulation and
procedures that operate to direct the flow of material and products
to national defense programs and programs which maximize domestic
energy supplies; provides for preferential treatment by industry
of contracts and orders placed in support of the programs, and
maintains an administrative means of promptly mobilizing the total
economic resources of the Nation in the event of a national emergency.
e. Delegate Agency. A Government agency authorized by delegation from
the Department of Commerce to place priority ratings on contracts or
orders needed to support authorized programs. DOE is a delegate agency.
3
4 DOE 5560.1A
5-8-85
f. DO. The rating symbol assigned to all authorized programs which are
not DX programs.
g. DX. The rating symbol assigned only to authorized programs of the
highest national priority.
Section 3
h. Eligible Contracts and Orders. Those contracts and orders for products,
materials, and services which may be rated in accordance with the rules
and exclusions stated in the defense priorities and allocations system
regulation and in the Defense Priorities and Allocations System
Delegation 2. Exclusions are specified in the regulation in paragraph
350.18(b)(1) and (3) and in the delegation of authority in Attachment A
to the Statement of Conditions.
i. Five Thousand Dollars ($5,000) Exemption. An exemption from mandatory
provisions of the Defense Priorities and Allocations System Regulation,
concerning rated orders in an amount less than $5,000, which may be
applicable to delegate agencies and persons receiving rated orders.
j. Maintenance, Repair, and Operating Supplies. Supplies which are
required for maintaining, repairing, and operating a facility, including
minor alterations necessary to maintain or repair but not to increase
the capacity of the facility.
k. National Defense. Programs for military and atomic energy production or
construction, military assistance to any foreign nation, stockpiling,
space, and directly related activity.
l. Person. Any individual, corporation, partnership, association, or any
other organized group of persons, including any agency of the United
States Government or any other government.
m. Program Determination. An authorization by FEMA of the amounts and
kinds of controlled materials which may be procured or used by or
for a delegate agency, or which may be allotted by a delegate agency,
for authorized programs during specified periods of time.
n. Rated Order or Contract. Services, products, or materials, including
controlled materials, which may be rated in accordance with the defense
priorities and allocations system regulation.
o. Rating. A prefix, either DO or DX, followed by an authorized program
identification symbol (e.g. , DO-El, DX-E2).
p. Rating Authority. The authority delegated to DOE in the Defense
Priorities and Allocations System Delegation 2, to place or authorize
others to place rated contracts and orders in support of DOE
DOE 5560.1A
5-8-85
5
programs for national defense authorized by the Director, Federal
Emergency Management Agency.
6. OBJECTIVES. To maintain, for both current and emergency conditions. a
priorities and allocations system program for the procurement of industrial
products, materials, and services necessary-for the timely completion of
DOE atomic energy construction, operations, and research and development
programs and programs which are determined by DOE to maximize domestic .
energy supplies.
7. BACKGROUND.
a. The Office of Industrial Resource Administration, Department of Commerce,
issues delegations of authority under the authority of the Defense
Production Act of 1950, as amended, Executive Order 10480, and Executive
Order 11912.
b. Defense Priorities and Allocations System Delegation 2, of 8-29-84,
delegates rating authority to the Secretary of Energy with authority to
redelegate, subject to the limitations stated in the delegation; and
delegates authority to make the findings required by section 101(c) of
the Defense Production Act of 1950, as amended, that specific supplies
of materials and equipment are critical and essential to programs which
are determined to maximize domestic energy supplies.
8. RESPONSIBILITIES.
a. Assistant Secretary, Management and Administration (MA-1) is redelegate
the authority contained in Defense Priorities and Allocations System
Delegation 2 by the Secretary of Energy.
Section 4
b. Director of Procurement and Assistance Management (MA-4).
(1) Develops and maintains policies, standards, contract articles, and
procedures, and provides Headquarters direction, coordination, and
administration of DOE-wide activities relating to the defense
priorities and allocations system.
(2) Is redelegate the authority conveyed in Defense Priorities and
Allocations System Delegation 2, including authority to modify
responsibilities designated in this Order to Heads of Depart-
mental Elements, to the extent required to implement policies
and procedures issued by the Department of Commerce.
(3) Maintains the master list of programs designated as eligible for
the DX program rating, and notifies Heads of Departmental Elements
of the eligible programs.
DOE 5560.1A
5-8-85
(4)
(5)
(6)
(7)
(8)
(9)
(lo)
Reviews and coordinates with responsible organizations, applica-
tions received from Heads of Field Elements for special
priorities assistance to construct or alter privately owned
facilities.
Notifies Heads of Field Elements of approval of eligible applica-
tions mentioned in paragraph 85(4).
Provides special priorities assistance on rated orders where field
elements and contractor efforts have not achieved required
deliveries.
Requests Department of Commerce to provide special priorities
assistance on rated orders in cases where regular defense
priorities and
ineffective.
Assembles data
controlled and
allocations system procedures have been proved
for and prepares reports on DOE requirements for
other materials, including helium.
Evaluates, through onsite reviews, field element performance
of the priorities and allocations program.
Maintains liaison with FEMA and Department of Commerce as the
principal point of contact for DOE concerning policies, procedures,
and regulations of the defense priorities and allocations system.
c. Heads of Departmental Elements.
(1) Ensure that members of their staff and contractors
jurisdiction are advised of the provisions of this
related procedures are followed, and that training
achieve these purposes is conducted.
under their
Order, that
required
(2) Appraise their contractors operations under the defense
priorities and allocations system regulation and procedures
ensure adherence to the priorities and allocations system
throughout the industrial chain so that authorized programs
are completed on schedule.
(3) Place rated contracts and orders as authorized in paragraph
of Defense Priorities and Allocations System Delegation 2.
(4) Assign to contractors and subcontractors the right to place
to
to
3(a)
rated
contracts and orders as indicated in paragraph 3(a) and paragraph
4 of Defense Priorities and Allocations System Delegation 2.
6
DOE 5560.1A
5-8-85
7
(5) Assign to contractors and subcontractors the right to place
rated contracts and orders for maintenance, repair, and operating
supplies.
(6) Authorize the placing of rated contracts and orders for construc-
tion and production equipment, subject to the limitations and
conditions stated in paragraph 4 of Defense Priorities and
Allocations System Delegation 2.
(7) Ensure that contractors and subcontractors adhere to any limita-
tions of authority that may be applicable. In this regard, see
paragraph 8 of Defense Priorities and Allocations System
Delegation 2.
(8) Forward, with appropriate recommendations to the Director of
Procurement and Assistance Management, applications for special
priorities assistance to construct or alter privately owned
facilities received under terms of paragraph 4 of Defense
Priorities and Allocations System Delegation 2.
Section 5
(9) Assign to contractors and subcontractors the right to place rated
contracts and orders when advised by the Director of procurement
and Assistance Management of the approval of an application
mentioned in subparagraph 8b(4).
(10) Apply or assign to others the authority to apply the OX program
rating when notified of the eligibility of a program by the
Director of Procurement and Assistance Management.
(11) Apply or assign to others the authority to apply the 13X rating,
other than the DX program rating mentioned in subparagraph (10),
above, only when specifically authorized by the Director of
Procurement and Assistance Management.
(12) Submit estimated requirements for controlled and other materials
to the Director of Procurement and Assistance Management.
(13) Appoints, i II writing, a primary and an alternate priorities and
allocations program representative.
d. Priorities and Allocations Program Representatives.
(1) Provide advice and guidance for the organization's priorities and
allocations program.
(2) Coordinate and conduct the activities of the organization’s
priorities and allocations program.
8 DOE 5560.1A
5-8-85
(3) Serve as principal contact points for the organization in matters
concerning priorities and allocations.
(4) Represent the organization, attend Department meetings concerning
priorities and allocations issues, and act as liaison-with DOE
Headquarters, other DOE elements, and DOE contractors in priorities
and allocations matters affecting their organization.
BY ORDER OF THE SECRETARY OF ENERGY:
WILLIAM S. HEFFELFINGER
Director of Administration
DOE 5560.1A
5-8-85
i
TABLE OF CONTENTS
CHAPTER I - GENERAL Page
1. Purpose ............................................. I-1
2. Authority and Regulation.............................................. I-1
3. Authorized DOE Programs ......................................... I-2
a. DOE Atomic Energy Programs ................................. I-2
b. Programs which Maximize Domestic Energy Supplies ............. I-2
4. Defense Priorities and Allocations System Essential Elements . . . . . . . I-2
CHAPTER II - PRIORITY RATINGS
1.
2.
3.
4.
5.
6.
7.
General .............................................
DO Rating . . .....................................
Figure II-1 - Production/Construction Equipment . . . . . . .
DX Rating ..........................................
Rating of Contracts and Orders ...........................
Acceptance and Filing of Rated Orders .......................
Extension of Ratings ...................................
Violations and Penalties .................................
CHAPTER III - CONTROLLED MATERIALS
1. Control led Materials Purchase Orders
2.
.......................
Requirements . . ...................................
3. Procedures for Procurement of Controlled Materials ................
4. Accounting Guidelines . . ............................
a. Headquarters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b. Field Elements . . ...............................
CHAPTER IV - OTHER CONTROLLED SUBSTANCES
1. Authority ..........................................
2. Requirements ...............................................
CHAPTER V - PROGRAMS WHICH MAXIMIZE DOMESTIC ENERGY SUPPLIES
1. General ...............................................
2. Applying for Priorities and Al locations Support
Section 6
for Energy Programs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3. Processing Form PR-437 .....................................
4. Preferential Treatment ...............................
5. Special Priorities Assistance ...........................
II-1
II -1
II -3
II -4
II -4
II-5
II -6
II-6
III-1
III-1
III-3
III-4
III-4
III-4
V-1
V-1
V-2
V-2
V-2
IV-1
IV-1
ii DOE 5560.1A
5-8-85
CHAPTER VI - SPECIAL PRIORITIES ASSISTANCE
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VI-1
2. Submission of a Request for Special Priorities Assistance . . . . . VI-1
3. Initiating a Request for Special Priorities Assistance ... VI-1
4. Headquarters Processing of Requests . . . . . . . . . . . . . . . . . VI-3
5. Requests for Other Assistance ......................... VI-3
CHAPTER VII - PRIORITY RATING ASSISTANCE FOR PRIVATELY OWNED FACILITIES
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VII-1
2. Criteria for Priority Rating Authority . . . . . . . . . . . . . . . . VII-1
3. Priority Rating Authority for Expansion of Privately
Owned Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VII-1
a. Capital Additions - No Construction ....................... VII-1
b. Construction . . ............................. VII-1
DOE 5560.1A
5-8-85
I-1
CHAPTER I
GENERAL
1. PURPOSE. It is DOE policy to provide guidance and procedures for DOE
participation in the industrial priorities and allocations program which is
governed by and conforms to the defense priorities and allocations system
regulation and delegation of authority from the Department of Commerce.
The defense priorities and allocations system and the delegation of
authority are designed to:
a. Require industry to accept and perform on, and allocate materials and
facilities to, contracts and orders for industrial products, materials,
and services in support of:
(1) DOE atomic energy construction, operations (including maintenance,
repair and operating supplies), and research and development
programs: and
(2) Programs which maximize domestic energy supplies.
b. Provide an administrative base from which to mobilize the total
national economy in the event of war or other emergency conditions.
2. AUTHORITY AND REGULATION.
a. Title I of the Defense Production Act of 1950, as amended, authorizes
the President to allocate materials and facilities, and establish
priorities for the acceptance and performance of contracts and
orders to:
(1) Promote the national defense (section 101(a)) as defined in
section 702(d) and in paragraph 5 of this Order.
(2) Maximize domestic energy supplies (section 101 (c)).
b. The authority of the President under the Defense Production Act has
been delegated to the Director of FEMA who has redelegate the
authority to exercise and administer industrial priorities and
allocation to the Secretary of Commerce. FEMA has retained for
itself overall policy guidance and program coordination.
c. The administration of the industrial priorities and allocations
authority is accomplished through a series of delegations and a
regulation issued by the Department of Commerce. The Department of
Commerce has delegated limited authority to DOE concerning priorities
I-2 DOE 5560.1A
5-8-85
and al locations with respect to contracts and orders for DOE
atomic energy construction, operations, and research and develop-
ment programs, and programs which maximize domestic energy supplies.
Section 7
d. DOE, its contractors, and subcontractors are bound by all provisions
of the defense priorities and allocations system regulation and
delegation of authority Issued by the Department of Commerce.
e. Title 10 CFR, Part 216, provides the procedures for implementing DOE
functions for the allocation of, or the priority performance under
contracts or orders relating to, supplies of materials and equipment
in order to maximize domestic energy supplies.
3. AUTHORIZED DOE PROGRAMS. Programs eligible for priorities and allocations
support, as authorized by FEMA, are DOE atomic energy programs and programs
which maximize domestic energy supplies.
a. DOE Atomic Energy Programs. All DOE atomic energy construction,
operations (including maintenance, repair, and operating supplies),
research and development programs, and in certain exceptional
cases for the expansion of privately owned facilities.
b. Programs Which Maximize Domestic” Energy Supplies. Those energy programs
and projects, including DOE non-nuclear projects, which are determined
by DOE to maintain or further: .
(1 ) Energy exploration, production, refining, or transportation; or
(2) Conservation of energy supplies; or
(3) Construction and maintenance of domestic energy supply facilities.
4. DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM ESSENTIAL ELEMENTS.
a.
b.
c.
The DOE is authorized to use priorities and allocations in support of DOE
atomic energy construction, operations (including maintenance, repair,
and operating supplies), research and development programs and, in
certain cases, for privately owned facilities.
Atomic energy program contracts and orders placed by DOE or its
contractors are generally “rated,” including orders for controlled
materials. Contracts and orders for DOE nonatomic energy programs
are ratable only on a case-by-case basis for specific supplies of
materials and equipment (see Chapter V).
DOE contracts and orders for materials and equipment required for non-
atomic energy programs or projects which are determined by Headquarters
to maximize domestic energy supplies may be placed as rated orders if
DOE 5560.1A I-3 (and I-4)
5-8-85
the materials and equipment are found to be critical , essential , and
scarce, and cannot be obtained by the required delivery date without
being placed as a rated order.
d. Ratings may not be used for the procurement of certain common-use items
in the Federal Supply classificatfon Groups and Classes as listed in
Attachment A to the Statement of Conditions of Defense Priorities and
Allocations System Delegation 2. However, in the event procurement
difficulties are encountered which threaten timely delivery, special
assistance may be obtained from Headquarters, in accordance with the
procedures outlined in Chapter V.
e. DOE develops and furnishes FEMA with quarterly statements of estimated
requirements for controlled materials for direct purchase by DOE and its
operating contractors, for incorporation in items specifically designed
and manufactured to authorized DOE atomic energy program specifications
or used in construction for authorized DOE atomic energy programs.
f. FEMA issues a program determination making allotments of controlled
materials and authorizing DOE to make allotments of controlled materials
to support authorized DOE programs.
Section 8
g. At this time, DOE does not make allotments of controlled materials to
its field elements or contractors for DOE atomic energy construction
and operations programs. DOE atomic energy contractors procure
controlled materials the same as products and materials that are not
controlled materials according to the procedures in the defense
priorities and allocations system. However, see Chapter 111 for
accounting guidelines for controlled materials.
h. Participants in any transaction covered by the defense priorities
and allocations system must make, and preserve for at least 3 years
thereafter, accurate and complete records of such transactions.
II-1
DOE 5560.1A
5-8-85
CHAPTER II
PRIORITY RATINGS
1. GENERAL.
a. Most DOE contracts and orders for industrial products, materials,
and services necessary or appropriate to promote DOE atomic energy
construction, operations, and research and development programs are
to be rated. Use of priority ratings is authorized for all ratable
contracts and orders. Contracts and purchase orders placed with or
through other Government agencies are rated. Although the use of
ratings generally applies to purchases, ratings may be used for leases
under the conditions specified in the defense priorities and allo-
cations system regulation.
b. There are two types of priority ratings: 1)0 and OX. All DO ratings
have equal preferential status and take precedence over all unrated
orders. All DX ratings have equal preferential status, but DX rated
orders take precedence over DO rated orders and all unrated orders.
The DX rating is used for designated DOE atomic energy construction
and operations programs of the highest national urgency.
2. DO RATING.
a. DOE atomic energy construction, operations (including maintenance,
repair and operating supplies), and research and development
contracts and orders are generally identified by applying the
prefix DO and the appropriate authorized program identification
symbol: El, Construction; E2, Operations, including maintenance,
repair and operating supplies; or E3, privately owned facilities.
b. Heads of Field Elements, or their delegates, may use or authorize
their contractors or subcontractors to use the DO rating on DOE
atomic energy construction, operations (including maintenance,
repair and operating supplies), and research and development
contracts and orders for all products, materials, and services
except for the following:
(1) Items listed in section 350.18(b)(1) and (3) of the defense
priorities and allocations system regulation;
(2) Items contained in the list of Federal Supply Classification
Groups and Classes in Attachment A to the Statement of
Conditions to Defense Priorities and Allocations System
Delegation 2;
DOE 5560.1A
5-8-85
(3) D0E nonatomic energy programs except those which are determined
to maximize domestic energy supplies (see Chapter IV); and
(4) Production or construction equipment or items to be used for the
manufacture of production equipment. Figure II-1 provides a
sample of the kinds of equipment which may be included in these
categories.
II-2
DOE 5560.1A
5-6-85
II-3
Bits, air-drill, removable. Flushers, street.
Bituminous equipment: Graders:
Asphalt plants. Elevating.
Distributors. Pull-type.
Heaters. Self-propelled.
Kettles. Maintainers.
Mixers. Grader-mounted equipment.
Pavers. Grapples. crane.
Spreaders, aggregate. Haulage, units, off-highway:
Section 9
Blades (cutting edges): Rear-dump trucks.
Grader. Wheel tractors 70 hp. and over.
Dozer. Hoists, contractors.
Scraper. Moppers, concrete equipment.
Snow plow. Loaders:
Buckets, concrete equipment. Bucket, elevating.
Buckets and dippers for cranes, Elevating, shoulder-type.
shovels, or draglines. Tractor-mounted.
Catch basin cleaners. Placers, concrete equipment.
Chutes, concrete equipment. Rock drills, air, including
Concrete equipment: drifters and stoppers.
Batchers, batch plants. Rollers and compactors, all types.
Bin. Rippers, rooters, and scarifiers,
Curb and gutter machines. drawn.
Cutting machines, except masonry. Scrapers, self-propelled and pull.
Dryers, aggregate. Snowplows, all types.
Finishers. Sweepers and leaf collectors, self-
Forms, metal, reusable.
Graders, sub and fine.
propelled and drawn.
Teeth:
Bucket.
Jacks, slab-raising. Ripper.
Mixers, Including mortar. Scarifier.
Pavers. Tractors, crawler.
Spreaders. Tractor-mounted equipment:
Towers. Dozer.
Vibrators. Power-control units.
Cranes, shovels, and draglines: Cranes.
Cranes, Construction. Shovels.
Cranes, locomotive and rail-truck Side-booms.
mounted. Backbones.
Cranes, railway, wrecking. Loaders.
Crane, shovel, and dragline Scarifies.
attachments. Winches.
Draglines, construction. Draglines.
Draglines, walking. Traffic line marking equipment.
Pipe dirvers and hammers. Trailers, construction, off-highway:
Shovels, power. Bottom, rear, and side dump, crawler
Crushing, screening, and washing or wheel-type.
equipment (portable): Logging arches.
All types, except food. Trenchers, all types.
Derrick, except oil and gas well. Well points, construction.
Disc, wheel-mounted or harrow, Wheels, crawler.
Dredging machinery, except dredge
pipe.
Drilling equipment:
Augers, earth, power-driven.
Pipe pushers, power-driven.
Tools, air, contractors.
FIGURE II-1
Production/Construction Equipment
Heaters.
II-4 DOE 5560.1A
5-8-85
c. If a rated order is likely to be delayed because a person
Is unable to obtain normally unrateable construction or
production items, the person may request the authority to use
a priority rating in ordering the needed items. In this case a
DO rating shall be used on contracts and orders for construction
and production equipment as follows;
(1) When purchased for use in the process of construction,
field elements and contractors shall apply the priority
rating DO-El when the construction equipment will become
the property of DOE and the Head of the Field Element
determines in each case that:
(a) Within a reasonable distance from the site where the
equipment is required, existing equipment is being
used to the fullest extent to perform on rated order(s).
(b) Al 1 reasonable efforts have been made to obtain new or
used equipment within the DOE atomic energy complex.
(c) All reasonable efforts have been made to obtain new or
used equipment on an unrated basis.
(2) When purchased for use as production equipment to be installed
as part of the initial construction of a project, field
elements and contractors shall use the rating DO-El.
(3) When purchased for use as production equipment in a completed
DOE project, field elements and contractors shall apply
the rating DO-E2.
Section 10
3. DX RATING. Provisions of Defense Priorities and Allocations System
Delegation 2 authorize DOE to use the DX rating for those programs desig-
nated by FEMA as eligible for such rating. A list of eligible DX programs
Is maintained by the Procurement and Assistance Management Directorate.
(This list is classified and cannot be included as a part of this
Order.) The Director of Procurement and Assistance Management informs
the Heads of Field Elements, in writing, of programs to which the DX
rating is applicable. The authority to use or authorize others to use
the DX rating is subject to the limitations specified for DO ratings on
page II-1, paragraph 2.
4. RATING OF CONTRACTS AND ORDERS. A DOE atomic energy construction, operations
(including maintenance, repair, and operating supplies), or research and
development contract or order, or energy contract or order, is considered
to be rated when the contract or order includes the following items:
DOE 5560.1A II-5
5-8-85
a. The prefix DO or DX together with the appropriate authorized
program Identification symbol: E1, E2, E3, F1, F2, or F3.
b. A statement reading substantially as follows:
“This is a rated order certified for national defense use and
you are required to follow all the provisions of the Defense
Priorities and Allocations System Regulation (15 CFR 350).”
c. The required delivery date(s).
d. An authorized signature.
5. ACCEPTANCE AND FILLING OF RATED ORDERS.
a. All rated orders must be accepted by suppliers except under the
following conditions:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
The person placing the order is unwilling or unable to meet the
supplier’s regularly established terms of sale or payment.
The order is for a product. or materials not usually made or
supplied or for a service not usually performed.
The order is tendered to a person for a product or material which
he produces or acquires only for his own use, and he has not filled
any orders for that product or material within the past 2 years.
The order is for a product or material produced by the person
tendering the rated order or for a service performed by the person
tendering the rated order.
The order is received after commencement of the applicable lead
time as prescribed by the Department of Commerce, except that a
DX-rated order must be accepted without regard to lead time.
(Lead time provisions apply only to control led materials and
metalworking machines.)
The applicable set-aside has been reached by the supplier or
would be exceeded by acceptance, except that a DX-rated order must
be accepted without regard to such set-aside. (set-aside provisions
apply only to controlled materials and metalworking machines.)
If acceptance or performance of the order would violate any other
regulation or order of the Department of Commerce.
II-6 DOE 5560.1A
5-8-85
b. If a supplier refuses to accept a rated order, the supplier, upon
written request of the prospective purchaser, must promptly provide
reasons, in writing, for rejecting the order.
c. In general, all rated orders must be filled by the required delivery
date. If the supplier’s schedule of operations prevents this, the
supplier must give precedence as follows:
(1) DX-rated orders must be given precedence over DO-rated orders or
unrated orders, and DO-rated orders must be given precedence over ,
unrated orders;
(2) If there is a conflict between rated orders of equal preferential
status, the supplier must give precedence in accordance with the
sequence of their receipt;
Section 11
(3) If there is a conflict between rated orders of equal preferential
status received on the same date, the supplier must give precedence
to the order which has the earnest required delivery date.
6. EXTENSION OF RATINGS.
a. Contractors or suppliers who receive rated contracts or orders are
required by the defense priorities and allocations system to extend
the priority rating and all other items of a rated order to their
contractors and suppliers throughout the industrial chain. This
extension requirement is optional in the case of any individual
purchase order of less than $5,000.
b. Contractors or suppliers who extend priority ratings should ensure
that the supplier receiving the rated order or contract provides
the preferential treatment called for in the priorities and allo-
cations system regulation.
7. VIOLATIONS AND PENALTIES. Willful violation of the provisions of Title 1
or sections 705 or 707 of the Defense production Act, the defense
priorities and allocations system regulation, or an official action
is a crime, and if convicted a person may be punished by fine or
Imprisonment, or both.
DOE 5560.1A
5-8-85
CHAPTER III
CONTROLLED MATERIALS
1. CONTROLLED MATERIALS PURCHASE ORDERS.
a. The defense priorities and allocation system requires DOE and all DOE
atomic energy contractors and subcontractors to place rated orders
for any controlled material (as distinct from a product containing
controlled material) required for DOE atomic energy construction,
operations (including maintenance, repair, and operating supplies),
and research and development programs. Use of rated orders Is
mandatory for all orders for controlled materials except for orders
of less than $5,000, on which it is optional. A rated order for
controlled material takes precedence over all other orders for
controlled materials.
b. Under the defense priorities and allocations system, DOE is a delegate
agency for the eight kinds of controlled materials (categorized below)
which are in the shapes and forms listed in schedule II to the defense
priorities and allocations system regulation.
(1) Carbon steel (including wrought iron);
(2) Alloy steel (except stainless steel );
(3) Stainless steel ;
(4) Copper and copper-base alloy brass mill products;
(5) Copper wire mill products;
(6) Copper and copper-base alloy foundry products and powder;
(7) Aluminum; and
(8) Nickel alloys.
2. REQUIREMENTS.
a. Field Elements shall:
(1) Develop estimated quarterly requirements for the eight kinds
of controlled materials to be purchased by either DOE or its
contractors in support of DOE atomic energy construction,
III-1
III-2 DOE 5560.1A
5-8-85
operations (including maintenance, repair and operating
supplies), and research and development programs. These
requirements are total requirements, including quantities
already ordered, and are developed separately for construction
and for operations, including maintenance, repair, and operating
supplies in the shapes and forms specified on Form ITA-9048.
Requirements must be reported to Headquarters, Procurement
and Assistance Management, MA-4, in accordance with the timing
that deliveries are required from the mills or other suppliers
of controlled materials.
(2)
(3)
(4)
Section 12
Estimate requirements for DOE atomic energy construction,
operations (including maintenance, repair, and operating
supplies), and research and development programs. Estimates
should be based on the initiation and continuation of operating
programs and construction projects, in accordance with existing
budget allowances and programs projected for inclusion in
future fiscal year budget submissions. It is recognized that
final designs may not have been determined. However, every
effort should be made to prepare the best forecasts for each
quarter.
Collect requirements estimates for atomic energy construction and
operations (including maintenance, repair, and operating supplies),
and research and development programs from their contractors to
the extent necessary to ensure reliability. Field elements
must review these estimates to ensure that they are as realistic
as possible. Field elements must then combine the requirements
data submitted by the contractors and submit two reports on Form
ITA-9048:
(a) A Field Organization Summary for Construction (El Programs);
and
(b) A Field Organization Summary for Operations (E2 Programs).
Forward the summaries to the Director of Procurement and Assistance
Management, Division of Property and Equipment Management, MA-422,
semiannually by the 8th workday of May and the 8th workday of
November. The May report should reflect third and fourth
quarter current calendar year requirements and first and second
quarter next calendar year requirements. The November report
should reflect the four quarter requirements for the next
calendar year. The summaries must be accompanied with a
transmittal Memorandum explaining in detail significant
changes, if any, from the previous report. During the semi-
annual period between requirements reports, each field element
DOE 5560.1A
5-8-85
III-3
will advise Headquarters of significant changes in levels of
requirements to permit modification, if necessary, in set-asides
at the mills.
b. Headquarters.
(1) The Director of Procurement and Assistance Management compiles
and submits to FEMA controlled material summaries of DOE
field elements and advises FEMA of significant interim changes as
they are received.
(2) On the basis of estimated requirements for the eight kinds of
controlled materials, the Director of Procurement and Assistance
Management receives a program determination from FEMA.
3. PROCEDURES FOR PROCUREMENT OF CONTROLLED MATERIALS. DOE field elements,
their contractors, subcontractors, and suppliers acquire controlled materials
in the quantities necessary for the timely completion of DOE atomic energy
construction, operations (including maintenance, repair, and operating
supplies) , and research and development programs. DOE and its atomic
energy contractors are required to follow the procedures of the defense
priorities and allocations system in obtaining controlled materials and
to account, if requested, for their usage.
a. Field elements and their atomic energy contractors and subcontractors
place rated orders for all eight kinds of controlled materials
with producers, distributors, or other suppliers.
b. An order for controlled materials is considered to be a rated order
when the purchase order includes the following elements:
(1) The prefix DO or DX together with the appropriate authorized program
identification symbol: El, E2, E3, F1, F2, or F3.
(2) A statement reading substantially as follows:
Section 13
“This is a rated order certified for national defense use
and you are required to follow all the provisions of the
Defense Priorities anti Allocations System Regulation (15 CFR
350)."
(3) The required delivery date(s).
(4) An authorized signature.
c. Rules for the acceptance and rejection of rated orders are included in
the defense priorities and allocations system regulation.
III-4 DOE -5560.1A
5-8-85
4. ACCOUNTING GUIDELINES.
a. Headquarters.
(1) DOE is required under the defense priorities and al locations
system to account for allotments of controlled materials
received from FEMA.
(2) The Director of Procurement and Assistance Management maintains the
central DOE accounts for all allotments received from FEMA. These
accounts reflect the following for each kind of controlled material
by calendar year quarters:
(a) Allotments received from FEMA;
(b) Individual adjustments to allotments; and
(c) Current balances.
b. Field Elements. Under the defense priorities and allocations
system, all prime consumers (e.g., DOE field elements and contractors)
do not receive allotments or suballotments from Headquarters. Therefore,
field elements and contractors are not required to submit reports
concerning usage of controlled materials to Headquarters. However,
field elements and contractors are required to maintain internal
records of controlled materials usage and keep the information available
as part of the DOE industrial mobilization preparedness program.
CHAPTER IV
OTHER CONTROLLED SUBSTANCES
1. AUTHORITY. The Helium Act Amendments of 1960 gives the Secretary of Interior
the authority to require that DOE gather and report periodic helium require-
ments to the Department of Interior. As a result, the Department of Interior
has imposed quarterly reporting requirements on DOE.
2. REQUIREMENTS. To assist Headquarters in providing the necessary data to the
Department of Interior, Heads of Field Elements are responsible for develop-
ing estimated annual helium requirements to be purchased by either DOE or
its contractors in support of atomic energy construction, operations (in-
cluding maintenance, repair, and operating supplies), and research and
development programs. These requirements are to be submitted by the types
specified on DOE F 4200.42, “Estimated Requirements for Selected Materials.”
Estimated requirements for construction and operations must be collected by
field elements from their contractors to ensure reliability. Field elements
must review these requirements to ensure that they are as realistic as
possible, consolidate the requirements and forward them to the Director of
Property and Equipment Management Division, Procurement and Assistance
Management Directorate, MA-422, annually by the 8th workday of March. The
report should reflect the 2 succeeding fiscal years. The requirements must
be accompanied by a transmittal Memorandum explaining in detail significant
changes, if any, from the previous report.
DOE 5560.1A
5-8-85
IV-1 (and IV-2)
DOE 5560.1A
5-8-85
V-1
CHAPTER V
PROGRAMS WHICH MAXIMIZE DOMESTIC ENERGY SUPPLIES
1. GENERAL.
a.
b.
c.
d.
Prior to the Energy Policy and Conservation Act of 1975 (Public Law
94-163), purchase orders for nonatomic energy programs were not
authorized to be placed as rated orders. The Energy Policy and Con-
servation Act amended the Defense Production Act of 1950 with a new
section 101(c) which provides for the allocation of or the priority
performance under contracts or orders (other than contracts of employ-
ment) relating to supplies of materials and equipment in order to
maximize domestic energy supplies.
Section 14
Priorities and allocations support for energy programs and projects
must be applied for on a case-by-case basis (not for all procurements
for the energy project involved) only for the material and equipment
which cannot be obtained on time in order to keep the project on
schedule.
Rated orders for energy programs are equivalent to those for DOE atomic
energy production and construction programs. Both are under the
jurisdiction of the defense priorities and allocations system regulation
and procedures. (See Chapters II and III of this Order for the proper
placement of rated orders. )
priorities and allocations support for energy programs is described in
10 CFR, Part 216, “Materials Allocation and Priority Performance Under
Contracts or Orders to Maximize Domestic Energy Supplies,” and in the
publication DOE/PR-0042, “Priorities and Allocations Support for Energy:
Keeping Energy Programs on Schedule.”
2. APPLYING FOR PRIRITIES AND ALLOCATIONS SUPPORT FOR ENERGY PROGRAMS.
a. Any person who requires priorities and allocations support as provided
for by section 101(c) of the Defense Production Act may submit an
application directly to the Director of Procurement and Assistance
Management, Division of Property and Equipment Management, ATTN: MA-422.
b. The application shall be made on form PR-437, “Request for Priority
Rating for Energy Programs.” The application requests DOE and the
Department of Commerce to determine If the energy project involved
maximizes domestic energy supplies and to find if the material or
V-2 DOE. 5560.1A
5-8-85
equipment identified in the application is scarce, critical , and
essential , and cannot be obtained on time without priorities and
allocations support.
c. Form PR-437 must be completed in sufficient detail to clearly
demonstrate the need for priorities and allocations support. It
is recommended that Title 10 CFR, Part 216, and DOE/PR-0042 be
thoroughly reviewed prior to requesting priorities and allocations
support. Further, any supplemental or backup material which
supports the request for priorities and allocations authority
should be attached to the Form PR-437.
3. PROCESSING FORM PR-437. Each request shall be reviewed and coordinated
with the appropriate Headquarters Element (e.g., Office of Policy, Safety,
and Environment; General Counsel; Fossil Energy; Nuclear Energy: Conser-
vation and Renewable Energy). Each request for priorities and allo-
cations support will be reviewed for completeness and accuracy ensuring
the information presented is sufficient to satisfy the established
criteria for granting priority rating authority. Based on DOE and
Department of Commerce analysis , the Director of Procurement and
Assistance Management shall notify the applicant In writing, either
granting or denying priorities and allocations support.
4. PREFERENTIAL TREATMENT.
a. Any person who is authorized by DOE to use priorities and allocations
authority for an energy project is subject to the obligations and
privileges of the provisions of the defense priorities and allocations
system.
b. Purchase orders or contracts placed under the authority of section
101 (c) of the Defense Production Act are equal to those placed in
support of DOE atomic energy production and construction programs
and must be given the same preferential treatment by suppliers
throughout the industrial chain.
Section 15
5. SPECIAL PRIORITIES ASSISTANCE. If a rated order is placed in support
of a a program which maximizes domestic energy supplies and the required
delivery date will not be met, special priorities assistance is available
as described in Chapter VI of this Order.
CHAPTER VI
SPECIAL PRIORITIES ASSISTANCE
1. GENERAL. In some instances, the regular procedures of the defense priorities
and allocations system may be ineffective in enabling DOE and authorized
contractors to obtain timely deliveries and keep authorized atomic energy
programs on schedule. To permit atomic energy programs to proceed or be
completed on schedule, special priorities assistance is available from the .
Procurement and Assistance Management Directorate. Special priorities
assistance personnel will contact the supplier to resolve the problem. The
Department of Commerce will be requested to issue a directive if necessary
to obtain compliance with the defense priorities and allocations system.
2. SUBMISSION OF A REQUEST FOR SPECIAL PRIORITIES ASSISTANCE.
a. Submission of a request to Headquarters for special priorities assistance
is appropriate only after efforts by the contractor and the field element
are unsuccessful in resolving problems. Examples of potential problems
are as follows:
(1 ) A supplier has refused to accept a rated order.
(2) A supplier has refused to meet or approach required delivery dates.
(3) A supplier has accepted a rated order which is critical for completion
of a program, but there is reasonable doubt that the supplier will
meet the required delivery date.
DOE 5560.1A VI-1
5-8-85
b. Every rated order is entitled to preferential treatment over nonrated
orders and any supplier who fails to preferentially schedule such
orders is in violation of the Defense Production Act of 1950,
as amended, and the defense priorities and allocations system
regulation.
3. INITIATING A REQUEST FOR SPECIAL PRIORITIES ASSISTANCE.
a. The purpose of the special priorities assistance program is to provide
timely delivery of industrial products, materials, and services for
programs experiencing or anticipating slippages in dell very schedules.
Therefore, field elements and contractors must make every effort to
identify delivery problems as early as possible and take prompt action to
seek a solution.
b. Having determined that a solution cannot be reached at the contractor
or the field element level, and that special priorities assistance
from Headquarters is necessary, the field element and contractor must
confirm that:
VI-2 DOE 5560.1A
5-8-85
(1) A written order or Contract Containing all items of a valid
rated order has been given to the supplier; and
(2) A written order containing all items of a valid rated order
has been furnished by a supplier to a subvendor if the request
for assistance Involves a subvendor in the procurement chain.
c. Requests for special priorities assistance may be initiated at any level
In the procurement chain (e.g., field elements, operating contractor,
subcontractor, vendor). Requests for assistance sent to Headquarters,
Property and Equipment Management Division, MA-422, must be endorsed ,
and forwarded by the appropriate field element through the priorities
and allocations program representative, and made on Form ITA-999,
“Request for Special Priorities Assistance” or TWX. Facsimile
copies of the form are acceptable.
Section 16
d. Under the circumstances of extreme urgency the request for special
priorities assistance may be initiated by a telephone call from the
DOE field element to Headquarters, Division of Property and Equipment
Management personnel. However, telephone requests will not be enter-
tained directly from a DOE contractor, without DOE field element
involvement. In the instance where a telephone call initiates a
request, the Form ITA-999 or TWX must be received by Headquarters
within 48 hours of the telephone call initiating the request.
e. Offices using Form ITA-999 must complete block 18, FOR USE OF GOVERNMENT
DEPARTMENT OR AGENCY ENDORSING THIS REQUEST (FIELD), explaining In
sufficient detail the actions taken by the field to resolve the
applicant’s problem. In addition, block 18(c) “By whom” must contain
the signature of the director of the DOE contracting activity at that
field location or the area manager in the case of an area office,
as an Indication of his/her approval of the applicant’s request for
assistance, as well as a verification that all field element efforts
and avenues toward resolution have been exhausted prior to requesting
Headquarters assistance.
f. Requests submitted by TWX shall contain the following information as
a minimum:
(1) Name, address, and telephone number of applicant who placed the
order with a supplier.
(2) Name and address of the supplier.
(3) Order number, date, and rating.
(4) Supplier’s in-house shop order number, if obtainable.
DOE 5560.1A
5-8-85
VI-3 and (VI-4)
(5) Identification of item or items ordered.
(6) Dollar value or approximate dollar value of orders.
(7) Name of supplier’s representative or contact.
(8) Telephone number of supplier’s representative or contact.
including the area code.
(9) Date that delivery is required.
(10) Date that supplier stated the order will be shipped.
(11) Reason given by supplier for inability to meet the required
delivery date.
(12) Detail of actions taken by the field element to resolve the
applicant’s problem.
(13) Signature of the senior procurement official at the field element.
4. HEADQUARTERS PROCESSING OF REQUESTS.
a. Upon receipt of a request for assistance, Division of Property and
Equipment Management, MA-422, personnel shall take action with the
supplier to-resolve the problem, obtaining such additional infor-
mation from the field element’s priorities and allocations program
representative/or contractor as may be required.
b. If MA-422 is unable to resolve a problem with a supplier, assistance
is available from the Department of Commerce, who may request additional
information from the field element or contractor.
c. The Property and equipment Management Division shall inform the
field element and contractor of all correspondence and action
taken.
5. REQUESTS FOR OTHER ASSISTANCE. Assistance also may be requested by field
elements and contractors or other Departmental elements on such matters
as locating and obtaining items of equipment and supplies, including those
which may be available from Government sources. These requests will be
processed by priorities and allocations personnel in the Division of
Property and Equipment Management, MA-422, or directed to the appropriate
organization for action.
DOE 5560.1A
5-8-85
VII-1
1.
2.
3.
CHAPTER VII
PRIORITY RATING ASSISTANCE FOR PRIVATELY OWNED FACILITIES
Section 17
GENERAL. In certain exceptional cases, expansion of privately owned
facilities, for which construction and/or capital additions are required
exclusively or primarily for DOE atomic energy program purposes, may be
eligible for priority rating authority from DOE. A supplier or contractor
makes application for such authority by submitting to the responsible
field element a formal written request, accompanied when appropriate
by a completed form ITA-9048. Privately owned facility projects for
which rating authority is approved will be identified by the program
identification symbol E3.
CRITERIA FOR PRIORITY RATING AUTHORITY. The following criteria are provided— .
as guidance or approval Of priority rating authority for privately owned
facilities:
a. The desired material , product, or service required by DOE from the
applicant cannot be procured from another qualified source that does not
require expansion. In determining equal qualification, such items as
cost, raw material supply, location, and transportation may be considered.
b. The applicant is unable to locate a satisfactory subcontracting source
to supply the parts or components for which the rating authority is
requested.
c. The applicant has made a reasonable effort to locate existing tools,
equipment, or facilities which could be acquired on a temporary basis
to meet atomic energy program delivery requirements.
d. The expansion will be devoted exclusively or primarily to DOE purposes.
e. The applicant cannot, without priority rating authority for the
proposed expansion, fulfill atomic energy requirements on time.
PRIORITY RATING AUTHORITY FOR EXPANSION OF PRIVATELY OWNED FACILITIES.
a. Capital Additions - No Construction. Heads of Field Elements are
authorized to approve formal requests for priority rating authority for
capital additions (no construction) subject to the criteria in paragraph
2 above. In cases determined to be eligible by Heads of Field Elements,
the right to use the rating DO-E3 is assigned to the applicant.
b. Construction.
(1) The Director of Procurement and Assistance Management, MA-4,
r VI I-2
(2)
(3)
DOE 5560.lA
5-8-85 .
i
must approve priority rating aut%ority when the expansion of 6
privately owned facllltles involves construction. In these
cases, Heads of Field Elements submit to MA-4 a !@morandurn
setting forth Information on the extent to which the criteria
in paragraph 2 above have been met, together with a recommen-
dation and two copies of Form ITA-9048 signed by the-appllcant
requesting priority rating authority.
Upon receipt Of approval from the Director of Procurement and
Assistance Management, Heads of Field Elements assign to the
applicant the right to apply priority rating DO-E3 on related
purchase orders.
Heads of Field Elements must adv~se approved applicants that
they must obtain controlled materials and othsr products and
materials under the provisions of the defense priorities and
allocations system.
.U.s. OCVERNMENT PR:NTIN2 OVICEI 198T-IA:-2c8f2c02: