DOE O 5500.10 Chg 1, Emergency Readiness Assurance Program
Functional areas: Emergency Preparedness
To establish the requirements of the Emergency Readiness Assurance Program with a goal of assurting that the Department of Energy (DOE) Emergency Management System (EMS) is ready to respond promptly, efficiently, and effectively to any emergency involving DOE facilities or requiring DOE assistance. Cancels DOE O 5500.10 dated 4-30-91. Chg 1 dated 2-27-92. Change 1 canceled by DOE O 151.1 of 9-25-95.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
U.S. Department
Washington,
of Energy ORDER
D.C.
DOE 5500.10
4-30-91
SUBJECT: EMERGENCY READINESS ASSURANCE PROGRAM
1. PURPOSE. To establish the requirements of the Emergency Readiness Assurance
Program with a goal of assurtng that the Department of Energy (DOE) Emergency
Management System (EMS) Is ready to respond promptly, efficiently, and
effectively to any emergency involving DOE facilities or requiring DOE
assistance.
2. SCOPE. The provisions of this Order apply to all DOE Elements and contractors
performing work for DOE as provided for by law and/or contract and as
Implemented by the appropriate contracting officer.
3. EXCLUSIONS.
a.
b.
c.
All DOE facilities subject to
requirements are specifically
Order.
Nuclear Regulatory Commission (NRC) license
exempted from the requirements of this
The Power Marketing Administrations are temporarily exempted from the
coverage of this directive provided that, within one calendar year of the
effective date of this Order, the Power Marketing Administrations shall
develop, in coordination with the Director of Emergency Operations (DEO),
emergency management directives appropriate to their specific regional
power missions, compatible with DOE’s EMS and supplementary DOE EMS
directives.
If a DOE Element or contractor can demonstrate that it is subject to
emergency management program requirements under the authority-of other
Federal regulatory agencies that are at least as stringent as the
requirements of this Order, then an exemption may be requested. Requests
for exemptions from the requirements of this Order shall document the
basis for each exemption and shall establish and justify alternatives
equivalent to, or exceeding, this Order. Requests for exemptions shall be
submitted for approval by the Under Secretary, with the concurrence of:
the cognizant Program Senior Official (PSO); the DEO; and, if applicable,
the Assistant Secretary for Environment, Safety, and Health (EH-1). The
Under Secretary shall resolve any differences among the PSO, DEO, and, if
applicable, EH-1.
4. BACKGROUND. This Order establishes a formal program of emergency readiness
assurance. It uses a broad definition of the term "facility" that encompasses
operations and activities.
DISTRIBUTION: INITIATED BY:
All Departmental Elements Director of Emergency Operations
2
5. REFERENCES.
a. DOE 5500.1B, EMERGENCY MANAGEMENT SYSTEM, of 4-30-91, which establishes
the DOE Emergency Management System.
b. For all other references, see Attachment 1 to DOE 5500.16.
6. DEFINITIONS.
fulfills a specific purpose.
Any equipment, structure, system, process, or activity that
Examples Include accelerators, storage
areas, fusion research devices, nuclear reactors, production or processing
plants, coal conversion plants, magnetohydrodynamlcs experiments,
windmills, radioactive waste disposal systems and burial grounds, testing
laboratories, research laboratories, transportation activities, and
accommodations for analytical examinations of Irradiated and unirradiated
components.
b. For all other definitions, see Attachment 2 to DOE 5500.1B.
c. Acronyms, see Attachment 4 to DOE 5500.1B.
7. POLICY. It Is DOE policy to establish and maintain readiness assurance for
all portions of the DOE EMS through development of:
a. Emergency Readiness Assurance Plans (ERAPs) to ensure that emergency
plans, implementing procedures, and resources are adequate and
sufficiently maintained, exercised, and evaluated; and
Section 2
b. Appraisal Programs to assure that stated emergency capabilities are
sufficient to implement emergency plans and that appropriate and timely
Improvements are made in response to needs Identified through coordinated
emergency planning, resource allocation, training, drills, exercises, and
evaluations.
8. RESPONSIBILITIES AND AUTHORITIES. These responsibilities and authorities are
supplemental to those in DOE 5560.1B.
a. Director of Emergency Operations (DEO) shall provide overall
coordination, consultation, and planning guidance for DOE EMS and
emergency readiness assurance activities by:
(1) Participating In the PSO's review and approval process for ERAPs and
annual updates;
(2) Using approved ERAPs to develop and present a consolidated, annua1
status report on DOE emergency readiness assurance, through the
Under Secretary, to the Secretary;
(3) Scheduling all emergency readiness assurance exercise planning
activities and exercises involving Headquarters (HQ) Program Offices
DOE 5500.10
4-30-91
a. Facility.
DOE 55OO.1O
4-30-91
and/or non-DOE entitles, and approving scenarios for full
participation exercises at DOE facilities, in conjunction with PSOs
(4) Conducting periodic emergency readiness assurance appraisals of HQ
program offices and Emergency Management Terns (EMTs), DOE Field
Elements, and contractors, Including national response assets, and
conducting appraisals of emergency preparedness exercises;
(5) Participating in the evaluation of all readiness assurance functions
for HW EMTs and Field Elements, Including DOE national response
(6) Tracking emergency readiness assurance issues, deficiencies, and
solutions resulting from evaluation and/or appraisal activities; end
(7) Developing standards and criteria for use in the validation of the
DOE EMS and emergency readiness assurance program.
b. Program Senior Officials (PSOs) shall:
(1) Review and give final approval to all ERAPs and annual updates for
facilities within their program, in coordination with EH-1 and the
DEO;
(2) Develop and maintain HQ EMT plans and procedures for response to
emergencies at their program’s facilities; and
(3) Participate in and validate all DEO oversight EMS readiness
assurance appraisals within their program, including those for any
DOE national response assets (i.e., Nuclear Emergency Search Team,
Accident Response Group, etc.) assigned to their program.
c. The Assistant Secretary for Environment, Safety, and Health (EH-1), in
coordination with the DEO and the responsible PSO, shall conduct
oversight, as required, to ensure that those aspects of both radiological
and non-radiological emergency management which affect environmental
protection, radiation safety, worker safety, and those aspects of public
health and safety that deal with epidemiology and exposure to hazardous
materials are properly addressed.
d. Heads of Field Elements shall:
(1) Approve and review ERAPs and annual updates from subordinate
elements;
(2) Consolidate ERAPs and annual updates and submit them to the
appropriate PSO for final approval with the DEO and EH-1 providing
concurrence;
(3) Provide the resources required to Implement Field Element emergency
readiness assurance activities in accordance with approved ERAPs;
3
assets;
4
(4)
(5)
(6)
(7)
Monitor and evaluate emergency readiness assurance capabilities
within their areas of responsibility, Including safeguards and
security issues; conduct field performance reviews and assessments,
on an annual basis, of all contractors to ensure that the
contractor’s emergency readiness assurance program is valid; and
report the status to the responsible PSO;
Section 3
Review contractor compliance with appropriate DOE requirements,
legislation, and implementing regulations, such as the Comprehensive
Environmental Response, Compensation, and Liability Act (CERCLA), as
emended, the Resource Conservation and Recovery Act (RCRA), and the
Emergency Planning and Community Right-to-Know Act (EPCRA);
Act as the Federal On Scene Coordinator for contractor response
under the National Oil and Hazardous Substances Pollution
Contingency Plan; and
Ensure that the Manager/Administrator of each DOE- or contractor-
operated facility, as the first or operating level of the line
management structure:
(a) Performs internal EMS readiness assurance assessments of the
facility, in coordination with the Head of Field Element; and
(b) Prepares the ERAPs and annual updates required by this Order.
9. EMERGENCY READINESS ASSURANCE PLANS (ERAPs)
a. ERAPs addressing planning and preparedness for emergency response shall be
developed for each facility. The initial ERAP and all annual updates
shall cover a planning cycle of 5 fiscal years from the date of the
initial or updated ERAP. Each ERAP section should be organized so as to
separate the following information:
(1) Background material and procedures not subject to change from year-
to-year, unless the facility, operation, or activity changes; and
(2) Annually u dated In formation containing reports on the activities
and accomplishments of the past year and plans, schedules, and
budgets for the next 5 fiscal years.
b. The ERAP shall serve as the baseline document for emergency readiness
assurance evaluations and as a planning tool to identify and develop
needed resources and improvements. Annual updates to the ERAPs will
contain the same types of information and have the same structure as the
initial plan. All updated plans shall highlight any changes in planning
bases, organizations, exemptions, etc., from previous ERAPs, as well as
compare actual achievements to goals, milestones, and objectives.
DOE 5500.10
4-30-91
DOE 3500.10
4-30-91
5
c. As a minimum, ERAPs shall contain the following sections:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
Executive Summary. A brief summary of the overall status of the
emergency area readiness assurance program plus pertinent aspects of the
current program and related issues. -
Program Description. A description of
assurance program at a level of detail
programmatic adequacy, with references
and implementing procedures.
Exemptions. A list of any approved or
requirements pertaining to the DOE EMS.
the emergency readiness
sufficient to ascertain
to current emergency plans
requested exemptions to
A summary statement
regarding changes to previous exemptions shall be included.
Hazards Assessment. A brief discussion of the range of potential
radiological and non-radiological emergencies applicable to the
facility with references to appropriate resource documents. This
section shall include a summary of the emergency classes and the
emergency action level criteria that will be used to determine the
need to notify Federal, state, tribal, or local agencies and to
determine protective measures to be recommended.
External Coordination. A summary of coordination activities
pertaining to external emergency response and support. This section
shall include a list of all current memoranda of understanding and
agreements with external or animations that would provide support to
the facility in the event of an emergency.
Section 4
Training. A summary of all applicable individual and collective
training developed and conducted for the specific types of
emergencies which could be expected at the facility. Emergency
training plans and goals for the current fiscal and next fiscal year
shall be identified. Additionally, drills and special training
plans for the following 5 fiscal years shall be included to the
extent known. All training drills and exercises conducted since the
previous ERAP, including the participation of any external
organization shall be described in this section. Information
detailing the number and type of personnel trained, the results of
training evaluations, and any significant training deficiencies
shall be included.
Appraisals. A description of the scheduling and appraisal process
(for the 5 fiscal year period, to the extent known) and the
identification of the organization conducting each appraisal.
Findings and Corrective Actions. A summary of all outstanding
appraisal findings, citing the priorities assigned for their
correction based-on management and technical considerations, as well
as any corrective actions validated as resolved during the past
6
fiscal year. A schedule for the resolution of all outstanding
deficiencies shall be included.
(9) Resource Requirements. A 5 fiscal year projection of major
resources, capabili ties, or any other sets of requirements,
including information and management support systems, budget,
personnel, and facilities needed to maintain an appropriate level of
emergency preparedness.
(10) Other. A discussion of any other items pertinent to emergency
readiness assurance programs.
d. ERAP Submittal Schedule.
(1)
(2)
(3)
(4)
Each facility, whether DOE or DOE contractor operated, shall submit
an initial or updated ERAP to their respective Head of Field Element
by September 30 each year. The ERAP shall cover the 5 fiscal year
period beginning the next October 1 (e.g., an ERAP submitted
September 30, 1991, will cover October 1, 1991, through
September 30, 1996. )
The Head of Field Element shall review and transmit facility ERAPs
and annual updates to the responsible PSO by October 31 each year.
The PSO shall review and approve each ERAP submitted, in
coordination with EH-1, consolidate all ERAPs for each program, and
submit the summary documents to the DEO by December 31 each year.
The DEO shall, in coordination with the cognizant PSO, prepare an
annual status report which contains a summary of the programmatic
consolidated plans and a list of the Individually approved ERAP
plans for submittal to the Under Secretary by March 31.
10. EMERGENCY READINESS ASSURANCE APPRAISALS. Appraisals assess the ability of
DOE elements and DOE- or contractor-operated facilities to meet applicable
requirements of the EMS. Appraisals shall be based on specific standards and
criteria promulgated by the DEO in coordination with applicable DOE oversight
elements. Full participation exercises, which test and demonstrate an
Integrated onsite and offsite emergency response capability, shall be
appraised. Appraisals shall be scheduled, conducted, and reported In
accordance with this Order, DOE 5482.1B, and DOE 5500.3A. The scheduling for
all DOE and DOE contractor appraisals shall be coordinated with the DEO to
minimize adverse impacts on field operations and maximize the efficiency of
the overall appraisal program.
Section 5
a. DOE- or Contractor-operated facilities shall conduct annual internal
readiness assurance assessments of their emergency management programs.
These assessments shall be conducted by contractor personnel not directly
responsible during an emergency for performing the functions being
assessed. The assessment process will include implementation of
management controls for evaluation and correction of assessment results.
DOE 5500.10
4-30-91
U.S. Department of Energy
Washington, D.C.
PAGE CHANGE
DOE 5500.10 Chg 1
2-27-92
SUBJECT: EMERGENCY READINESS ASSURANCE PROGRAM
1. PURPOSE. To transmit revised pages to DOE 5500.10, EMERGENCY READINESS
ASSURANCE PROGRAM, of 4-30-91.
2. EXPLANATION OF CHANGE. To make organizational title, routing symbol, and
other administrative editorial changes required by SEN-6D-91, DEPARTMENTAL
ORGANIZATIONAL AND MANAGEMENT ARRANGEMENTS, of 5-16-91. No substantive
changes have been made.
3. FILING INSTRUCTIONS.
a. Remove Page Dated Insert Page Dated
4-30-91 2-27-92
2 4-30-91 2 4-30-91
3 4-30-91 3 2-27-92
4 4-30-91 4 4-30-92
b. After filing the attached pages, this transmittal may be discarded.
BY ORDER OF THE SECRETARY OF ENERGY:
JOHN J. NETTLES, JR.
Director of Administration
and Human Resource Management
DISTRIBUTION:
All Departmental Elements Director of Emergency Operations
INITIATED BY:
1 1
U.S. Department
Washington,
of Energy ORDER
D.C.
DOE 5500.10
SUBJECT: EMERGENCY READINESS ASSURANCE PROGRAM
4-30-91
Change 1: 2-27-92
1. PURPOSE. To establish the requirements of the Emergency Readiness Assurance
program with a goal of assuring that the Department of Energy (DOE) Emergency
Management System (EMS) is ready to respond promptly, efficiently, and
effectively to any emergency involving DOE facilities or requiring DOE
assistance.
2. SCOPE. The provisions of this Order apply to all DOE Elements and contractors
performing work for DOE as provided for by law and/or contract and as
implemented by the appropriate contracting officer.
3. EXCLUSIONS.
4.
a.
b.
c.
All DOE facilities subject to Nuclear Regulatory Commission (NRC) license
requirements are specifically exempted from the requirements of this
Order.
The Power Marketing Administrations are temporarily exempted from the
coverage of this directive provided that, within one calendar year of the
effective date of this Order, the Power Marketing Administrations shall
develop, in coordination with the Director of Emergency Operations (DEO),
emergency management directives appropriate to their specific regional
power missions, compatible with DOE’s EMS and supplementary DOE EMS
directives.
If a DOE Element or contractor can demonstrate that it is subject to
emergency management program requirements under the authority-of other
Federal regulatory agencies that are at least as stringent as the
requirements of this Order, then an exemption may be requested. Requests
for exemptions from the requirements of this Order shall document the
basis for each exemption and shall establish and justify alternatives
equivalent to, or exceeding, this Order. Requests for exemptions shall be
submitted for approval by the Under Secretary, with the concurrence of:
the cognizant Program Secretarial Officer (PSO); the DEO; and, if
applicable, the Assistant Secretary for Environment, Safety, and Health
(EH-1). The Under Secretary shall resolve any differences among the PSO,
DEO, and, if applicable, EH-1.
Section 6
BACKGROUND . This Order establishes a formal program of emergency readiness
assurance. It uses a broad definition of the term “facility” that encompasses
operations and activities.
All Departmental Elements Director of Emergency Operations
Vertical line denotes change.
D I S T R I B U T I O N : I N I T I A T E D B Y :
2 DOE 5500.10
4-30-91
5. REFERENCES.
a. DOE 5500.1B, EMERGENCY MANAGEMENT SYSTEM, of 4-30-91, which establishes
the DOE Emergency Management System.
b. For all other references, see Attachment 1 to DOE 5500.1B.
6. DEFINITIONS.
a. Facility. Any equipment, system, process, or activity that
fulfills a specific purpose. Examples include accelerators, storage
areas, fusion research devices, nuclear reactors, production or processing
plants, coal conversion plants, magnetohydrodynamics experiments,
windmills, radioactive waste disposal systems and burial grounds, testing
laboratories, research laboratories, transportation activities, and
accommodations for analytical examinations of irradiated and unirradiated
components.
b. For all other definitions, see Attachment 2 to DOE 5500.1B.
c. Acronyms, see Attachment 4 to DOE 5500.1B.
7. POLICY. It is DOE policy to establish and maintain readiness assurance for
all portions of the DOE EMS through development of:
a. Emergency Readiness Assurance Plans (ERAPs) to ensure that emergency
plans, implementing procedures, and resources are adequate and
sufficiently maintained, exercised, and evaluated; and
b. Appraisal Programs to assure that stated emergency capabilities are
sufficient to implement emergency plans and that appropriate and timely
improvements are made in response to needs identified through coordinated
emergency planning, resource allocation, training, drills, exercises, and
evaluations.
8. RESPONSIBILITIES AND AUTHORITIES. These responsibilities and authorities are
supplemental to those in DOE 5500.1B.
a. The Director of Emergency Operations (DEO) shall provide overall
coordination, consultation, and planning guidance for DOE EMS and
emergency readiness assurance activities by:
(1) Participating in the PSO’s review and approval process for ERAPs and
annual updates;
(2) Using approved ERAPs to develop and present a consolidated, annual
status report on DOE emergency readiness assurance, through the
Under Secretary, to the Secretary;
(3) Scheduling all emergency readiness assurance exercise planning
activities and exercises involving Headquarters (HQ) Program Offices
DOE 5500.10 Chg 1 3
b.
c.
d.
(4)
(5)
(6)
(7)
and/or non-DOE entities, and approving scenarios for full
participation exercises at DOE facilities, in conjunction with PSOs
Conducting periodic emergency readiness assurance appraisals of HQ
program offices and Emergency Management Teams (EMTs), DOE Field
Elements, and contractors, including national response assets, and
conducting appraisals of emergency preparedness exercises;
Participating in the evaluation of all readiness assurance functions
for HQ EMTs and Field Elements, including DOE national response
assets;
Tracking emergency readiness assurance issues, deficiencies, and
solutions resulting from evaluation and/or appraisal activities; and
Developing standards and criteria for use in the validation of the
DOE EMS and emergency readiness assurance program.
Program Secretarial Officers (PSOs) shall:
(1) Review and give final approval to all ERAPs and annual updates for
facilities within their program, in coordination with EH-1 and the
DEO;
Section 7
(2) Develop and maintain HQ EMT plans and procedures for response to
emergencies at their program’s facilities; and
(3) Participate in and validate all DEO oversight EMS readiness
assurance appraisals within their program, including those for any
DOE national response assets (i.e., Nuclear Emergency Search Team,
Accident Response Group, etc.) assigned to their program.
The Assistant Secretary for Environment, Safety, and Health (EH-1), in
coordination with the DEO and the responsible PSO, shall conduct
oversight, as required, to ensure that those aspects of both radiological
and non-radiological emergency management which affect environmental
protection, radiation safety, worker safety, and those aspects of public
health and safety that deal with epidemiology and exposure to hazardous
materials are properly addressed.
Heads of Field Elements shall:
(1) Approve and review ERAPs and annual updates from subordinate
elements;
(2) Consolidate ERAPs and annual updates and submit them to the
appropriate PSO for final approval with the DEO and EH-1 providing
concurrence;
(3) Provide the resources required to implement Field Element emergency
readiness assurance activities in accordance with approved ERAPs;
Vertical line denotes change.
2-27-92
4
(4)
(5)
(6)
(7)
DOE 5500.10
4-30-91
Monitor and evaluate emergency readiness assurance capabilities
within their areas of responsibility, including safeguards and
security issues; conduct field performance reviews and assessments,
on an annual basis, of all contractors to ensure that the
contractor’s emergency readiness assurance program is valid; and
report the status to the responsible PSO;
Review contractor compliance with appropriate DOE requirements,
legislation, and implementing regulations, such as the Comprehensive
Environmental Response, Compensation, and Liability Act (CERCLA), as
amended, the Resource Conservation and Recovery Act (RCRA), and the
Emergency Planning and Community Right-to-Know Act (EPCRA);
Act as the Federal On Scene Coordinator for contractor response
under the National Oil and Hazardous Substances Pollution
Contingency Plan; and
Ensure that the Manager/Administrator of each DOE- or contractor-
operated facility, as the first or operating level of the line
management structure:
(a) Performs internal EMS readiness assurance assessments of the
facility, in coordination with the Head of Field Element; and
(b) Prepares the ERAPs and annual updates required by ‘this Order.
9. EMERGENCY READINESS ASSURANCE PLANS (ERAPs)
a. ERAPs addressing planning and preparedness for emergency response shall be
developed for each facility. The initial ERAP and all annual updates
shall cover a planning cycle of 5 fiscal years from the date of the
initial or updated ERAP. Each ERAP section should be organized so as to
separate the following information:
(1) Background material and procedures not subject to change from year-
to-year, unless the facility, operation, or activity changes; and
(2) Annually updated information containing reports on the activities
and accomplishments of the past year and plans, schedules, and
budgets for the next 5 fiscal years.
b. The ERAP shall serve as the baseline document for emergency readiness
assurance evaluations and as a planning tool to identify and develop
needed resources and improvements. Annual updates to the ERAPs will
contain the same types of information and have the same structure as the
initial plan. All updated plans shall highlight any changes in planning
bases, organizations, exemptions, etc., from previous ERAPs, as well as
compare actual achievements to goals, milestones, and objectives.