DOE O 5481.1B Chg 1, Safety Analysis and Review System
Functional areas: Environmental Quality & Impact
Canceled by DOE O 5480.23 for Nuclear Facilities only & DOE N 251.4 of 9-29-1995.
Superseded By:
DOE N 251.4, Cancellation of Directives on Sep 29, 1995
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE N 251.4Cancellation of Directives (Sep 29, 1995)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
U.S. Department of Energy
Washington, D.C.
ORDER
DOE 5481.1B
9-23-86
SUBJECT SAFETY ANALYSIS AND REVIEW SYSTEM
1. PURPOSE. To establish uniform requirements for the preparation and review
of safety analyses of Department of Energy (DOE) operations, including
identification of hazards, their elimination or control, assessment of the
risk, and documented management authorization of the operation. Detailed
requirements for the review and authorization processes for nuclear
facilities and reactors are addressed in DOE 5480.5 and DOE 5480.6.
2. CANCELLATION. DOE 5481.1A, SAFETY ANALYSIS AND REVIEW SYSTEM, of 8-13-81.
3. SCOPE. The provisions of this Order apply to all Departmental Elements and
contractors performing work for the Department as provided by law and/or
contract and as implemented by the appropriate contracting officer.
4. EXCLUSIONS.
a. Operations having hazards only of a type and magnitude routinely .
encountered and/or accepted by the general public;
b. The nuclear safety of weapon designs;
c. Construction-related work activities; and
d. The Federal employee occupational safety and health program as
described in DOE 3790.1A.
5. REFERENCES.
a. DOE 1324.2, RECORDS DISPOSITION, of 5-28-80, which establishes the
Departmental records disposition program.
b. DOE 3790.1A, FEDERAL EMPLOYEE OCCUPATIONAL SAFETY AND HEALTH PROGRAM,
of 10-22-84, which establishes the policy and requirements for the
occupational safety and health program for Federal employees.
c. DOE 5480.1B, ENVIRONMENT, SAFETY AND HEALTH PROGRAM FOR DOE OPERATIONS of
9-23-86, which sets forth responsibilities and requirements for the
program.
DISTRIBUTION: INITIATED BY:
All Departmental Elements Assistant Secretary for
Environment, Safety, and Health
2 DOE 5481.1B
9-23-86
d.
e.
f.
g.
h.
i.
j.
k.
DOE 5480.3, SAFETY REQUIREMENTS FOR THE PACKAGING AND
TRANSPORTATION OF HAZARDOUS MATERIALS, HAZARDOUS SUBSTANCES, AND
HAZARDOUS WASTES, of 7-9-85, which establishes the requirements for
packaging and transportation of hazardous materials, hazardous
substances, and hazardous wastes.
DOE 5480.5, SAFETY OF NUCLEAR FACILITIES, Of 9-23-863 which establishes
DOE’s nonreactor nuclear facility safety program.
DOE 5480.6, SAFETY OF DEPARTMENT OF ENERGY-OWNED NUCLEAR REACTORS,
of 9-23-86, which establishes DOE’s nuclear reactor safety
program.
DOE 5610.1, PACKAGING AND TRANSPORTING OF NUCLEAR EXPLOSIVES,
NUCLEAR COMPONENTS, AND SPECIAL ASSEMBLIES, of 9-11-79, which
establishes safety policies and procedures applicable to packaging
and transportation of nuclear explosives, nuclear components, and
special assemblies outside of DOE-controlled sites.
DOE 5610.3, PROGRAM TO PREVENT ACCIDENTAL OR UNAUTHORIZED NUCLEAR
EXPLOSIVE DETONATIONS, of 12-18-80, which establishes safety
policies and procedures applicable to activities involving nuclear
explosives.
DOE 5700.1C, MAJOR SYSTEM ACQUISITIONS, of 9-6-83, which
establishes requirements and objectives and assigns
responsibilities and authorities necessary to the acquisition of
major systems.
DOE 5700.6B, QUALITY ASSURANCE, of 9-23-86, which establishes
DOE’s quality assurance program.
MIL-STD-882B, “System Safety Program Requirements,” of 3-30-84, which
provides detailed information for organizing, developing, and
implementing system safety programs tailored to individual program
needs. This document is available through the Department of
Defense.
6. DEFINITIONS.
Section 2
a. DOE Operations are those DOE-funded activities for which DOE has
assumed responsibility for the environment, safety, and health
programs. It is a general term intended to encompass individual
operations or efforts in the aggregate rather than separately.
b. Line Organization is that unbroken chain of command which extends from
the Secretary through the Under Secretary, to the Program Senior
Officials (PSO) who set program policy and plans and develop assigned
programs, to the field organization managers who are responsible to the
PSO for execution of these programs, and to the contractors who conduct the
programs. Environment, Safety, and Health are integral parts of each
DOE 5481.1B
9-23-86
3
program. Accordingly, line management responsibility for ES&H functions
flows from the Secretary through the Under Secretary, to the PSO, to the
field organization managers, to the contractors.
c. Program Senior Official (PSO) is a senior outlay program manager and
includes the Assistant Secretaries for Conservation and Renewable
Energy; Fossil Energy; Nuclear Energy; Defense Programs; and the
Directors of Energy Research and Civilian Radioactive Waste Management.
For purposes of this Order, this definition includes the Administrators
of the Bonneville and Western Area Power Administrations.
d. Risk is a quantitative or qualitative expression of possible loss
which considers both the probability that a hazard will cause harm and
the consequences of that event.
e . Safety Analysis is a documented process to systematically identify
the hazards of a DOE operation, to describe and analyze the adequacy
of the measures taken to eliminate, control, or mitigate identified
hazards, and to analyze and evaluate potential accidents and their
associated risks.
f. Significant modification is a change that involves an unreviewed safety
question. See DOE 5480.1B.
7. POLICY.
a. It is Departmental policy to:
(1) Assure the protection of the environment and the health and
safety of the public.
(2) Provide safe and healthful workplaces and conditions of employ-
ment for all employees of DOE and DOE contractors.
(3) Protect Government property against accidental loss and damage.
(4) Assure compliance with applicable statutory requirements affecting
Federal facilities and operations and where possible, consistent
with the Department’s mission and supported by appropriate cost/
benefit analysis, reduce identified environment, safety, and health
risks, even though not mandated by specific requirements.
(5) Assure that quality assurance is pursued (i.e., that research,
development, demonstration, and production activities are performed
in a controlled manner; that components, systems, and processes are
designed, developed, constructed, tested, operated, and maintained
according to industry accepted engineering standards, quality
practices, and Technical Specifications/Operational Safety
Requirements; and that resulting technology data are valid and
retrievable).
DOE 5481.1B
9-23-86
(6) Require line management to be responsible for effective Environment
Safety, and Health (ES&H) performance in their programs. Through
overview, the Assistant Secretary for Environment, Safety, and
Health (EH-1) is responsible to assure acceptable ES&H performance
for the Secretary and for Program Senior Officials. t
b. These assurances are provided, in part, by the preparation and review
of safety analyses for DOE operations. The basic responsibility
for assuring implementation of this policy lies with the line
organization responsible for the operation.
Section 3
c. The objectives of the safety analysis preparation and review process
assure that:
(1) Potential hazards are systematically identified;
(2) Potential consequences are analyzed;
(3) Reasonable measures to eliminate, control , or mitigate the hazards
have been taken, including where applicable, compliance with
commitments made in environmental assessments and impact
statements; and
(4) There is documented management authorization of the DOE operation
based upon an objective assessment of the safety analysis.
JOHN S. HERRINGTON
Secretary
4
DOE 5481.1B
9-23-86
i (and ii)
TABLE OF CONTENTS
CHAPTER I - GENERAL REQUIREMENTS Page
1. Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2. Responsibilities and Authorities . . . . . . . . . . . . . . . . . . . I-1
3. Basic Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-2
4. Backfitting . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-3
CHAPTER II - GUIDANCE
1. Purpose . . . . . . . . . . . . . . . . . . . . . . . . . II-1
2. Extent of Applicability . . . . . . . . . . . . . . . . . . . . . . II-1
3. Hazard Classes . . . . . . . . . . . . . . . . . . . . . . . . II-1
4. Safety Analysis . . . . . . . . . . . . . . . . . . . . . . . . . II-1
5. Reviews by Line Organizations . . . . . . . . . . . . . . . . . . . . . . . . . II-3
6. Recordkeeping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-4
7. Backfitting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-4
I-1
U.S. Department of Energy
Washington, D.C.
SUBJECT: SAFETY ANALYSIS AND REVIEW SYSTEM
PAGE CHANGE
DOE 5481.1B Chg 1
5-19-87
1. PURPOSE. To transmit revised pages to Chapter I of DOE 5481.1B, SAFETY
ANALYSIS AND REVIEW SYSTEM, of 9-23-86.
2. EXPLANATION OF CHANGE.
a. Additions have been made to Paragraph 3, “Basic Requirements,” con-
cerning safety analysis and documentation. These additions are in
response to a recommendation contained in GAO Report RCED-86-175,
“Nuclear Safety: Safety Analysis Reviews for DOE’s Defense Facilities
Can Be Improved, ’ of 6-6-86, which recommends that safety analysis
reports include a detailed comparison of the plant against current DOE
design criteria, highlighting and explaining any deviations.
b. Per letter of 8-21-86 to Congress, the Department committed to requiring
that such evaluations be incorporated into the safety analysis reports,
either through revisions of appropriate sections of the report or as an
appendix. Paragraph 3 was revised to fulfill the congressional
commitment.
3. FILING INSTRUCTIONS.
a. Remove Page Dated Insert Page Dated
I-1 9-23-86 I-1 9-23-86
I-2 9-23-86 I-2 5-19-37
I-3 9-23-86 I-3 9-23-86
I-4 9-23-86 I-4 5-19-87
b. After filing the attached pages, this transmittal may be discarded.
BY ORDER OF THE SECRETARY OF ENERGY:
HARRY L. PEEBLES
Director of Administration
DISTRIBUTION: INITIATED BY:
All Departmental Elements Assistant Secretary for
Environment, Safety and Health
DOE 5481.1B
9-23-86
CHAPTER I
GENERAL REQUIREMENTS
1. PURPOSE. This chapter assigns basic responsibilities and delineates
general requirements.
2. RESPONSIBILITIES AND AUTHORITIES.
a. Program Senior Officials, or their designees in the line organization?
responsible for ES&H in operations under their cognizance, shall :
(1) Require preparation of appropriate safety analyses for each DOE
operation and subsequent significant modifications, including
decommissioning.
Section 4
(2) Ensure that an independent review of each safety analyses is
performed. Field organization or contractor internal reviews may
be used to fulfill this requirement.
(3) Ensure the construction, operation, and subsequent significant
modifications, including decommissioning, of each DOE operation is
appropriately authorized. Authorizations are to be based on an
objective assessment of the safety analysis as well as other
programmatic considerations.
(4) Inform the Assistant Secretary for Environment, Safety, and Health
(EH-1 ) by 12-1 of each year of all DOE operations requiring safety
analysis which were authorized in the preceding fiscal year,
including the organizational level at which the authorization was
granted. This information should include a 3-year projection of
the anticipated completion date for safety analyses, reviews
thereof, and the anticipated authorization levels.
(5) For those operations specified by EH-1, provide the safety
analysis when available and, concurrent with an authorization, the
completed review(s) which establish the basis for the
authorization.
(6) Maintain the official DOE file of all pertinent documentation
relating to the authorization of each DOE operation.
b. Assistant Secretary for Environment, Safety, and Health, is responsible
for providing independent assurance that the line organization
responsibilities are fulfilled in an effective and generally uniform
manner. EH-1 shall:
(1) Provide advisory and interpretative services on matters dealing
with the policy, responsibilities, requirements, and procedures
contained in this directive.
I-1
(2) Provide technical assistance and support to the line
organizations.
(3) Provide an independent appraisal of the safety analysis and
review activities of each line organization except the Office
of Naval Reactors. The extent of this effort will include
periodic appraisals of each line organization and associated
independent reviews, including timely reviews of the 3-year
projections provided by the line organization, to assure the
uniform application of the general requirements of this
directive throughout DOE, and the existence of adequate
documentation.
(4) Overview safety analysis required for weapons program activities
and facilities, but not individual operations involving the
assembly, disassembly, and testing of nuclear explosives, weapons
or devices, nor those aspects of these facilities relating
specifically to such operations which are covered by DOE 5610.3.
Similarly, EH-1 overview of the weapons program transportation
activities involving nuclear explosives, weapons or weapons
components, nuclear devices , or special nuclear material will
apply only to safety analysis of nonweapon shipping containers,
but not to analyses of shipping operations which are covered by
DOE 5610.1.
(5) Audit the independent review of safety analyses required for major
system acquisitions (see DOE 5700.1C), except Naval Reactors, and
advise the Secretary of the results of this audit at the time of
the key decision.
(6) Establish policy and develop guidance for safety analysis and
review activities.
3. BASIC REQUIREMENTS
a. Safety Analysis. The analysis shall:
(1) Be initiated during the earliest phases of the life cycle of the
DOE operation to facilitate early hazard identification and their
elimination or control.
(2) Be provided by the organization with immediate operating
responsibility.
(3) Identify and demonstrate conformance with applicable guides,
Section 5
I
codes, and standards. Deviations from current DOE design
criteria shall be evaluated and documented in the facility safety
analysis report.
Vertical line denotes change.
I-2 DOE 5481.1B Chg 1
5-19-87
DOE 5481.1B
9-23-86
I-3
(4) Wherever possible, cover classes of efforts or individual operations
within a facility (or under an activity or project) so that
individual efforts or operations which are to be conducted are
bounded by the general analysis.
(5) Demonstrate that there is reasonable assurance that the DOE
operation can be conducted in a manner that will limit risks to
the health and safety of the public and employees, and adequately
protect the environment.
(6) Describe the features of the actual design and conduct of the DOE
operation that demonstrate conformance with design or performance
assumptions made in environmental assessments or impact statements
previously issued by DOE, or satisfactorily account for deviations.
b. Review of the Safety Analysis.
(1) The review shall include a documented evaluation of the adequacy
of the preventative or mitigative design features and the adminis-
trative controls provided to limit the risk.
(2) The line organization review shall serve as a basis for
authorization of the proposed DOE operation.
(3) The line organization review may be conducted at the Headquarters
level, or at the field level, as delegated..
(4) The review provided by the line organization shall be conducted’ by
individuals, the majority of whom are not directly involved in the
management of the DOE operation being evaluated.
(5) The review shall be sufficiently documented to allow independent
evaluation of its adequacy.
c. Authorizations.
(1) The level of management authorization of a DOE operation shall be
determined by the line organization. It should be commensurate with
the type and magnitude of the hazards involved.
(2) Authorizations signify that a determination has been made by the
line organization for DOE that the risk is acceptable.
(3) Authorizations shall limit a DOE operation to those characteristics
described and analyzed in the safety analysis.
I-4 DOE 5481.1B Chg 1
5-19-87
d. Documentation. All pertinent details of the analysis, review, and
authorization relative to any DOE operation shall be traceable from
the initial identification of a hazard to its elimination or the
application of controls necessary to appropriately reduce the risk. The
second requirement of paragraph 3a(3) shall be incorporated in appro-
priate sections of the safety analysis report or as an appendix. For
existing safety analysis reports, the requirement shall be incorporated
in the appropriate sections of the report or as an appendix at the next
update.
4. BACKFITTING. Those ongoing DOE operations which can be reasonably expected
to have the potential for major onsite or offsite impacts to people or the
environment shall be identified and evaluated by the line organization in
accordance with the following provisions:
a. Where documentation (e.g., studies, evaluations, analyses) is available,
the line organization shall determine whether the documentation adequately
identifies the risk.
b. Where documentation is not adequate, the line organization shall make
necessary arrangements (funds and other resources) to provide for adequate
safety analyses in accordance with this directive, or obtain an exemption
from the responsible PSO. EH-1 shall be provided the opportunity to
review requests for exemptions prior to approval.
Section 6
c. Safety analyses prepared under subparagraph b, above, for ongoing DOE
operations shall be based upon current technical criteria. When hazards
are identified which can be eliminated, controlled, or mitigated through
reasonable measures, appropriate upgrading actions shall be identified
and implemented.
Vertical line denotes change.
DOE 5481.1B II-1
9-23-86
CHAPTER II
GUIDANCE
1. PURPOSE. This chapter presents guidance and preferred practices for use
by line organizations in implementing the policy, objectives, and require-
ments of this Order.
2. EXTENT OF APPLICABILITY.
a. DOE operations,’ as defined, embraces all activities for which DOE has
assumed ES&H responsibility, regardless of whether or not there is a
facility involved. Thus, the transportation of hazardous materials is
included. Those activities for which DOE has assumed ES&H responsibility
can be determined by the contract provisions.
b. Recognizing that no activity is without some degree of risk, and that
certain routine risks are accepted without question by the vast
majority of- persons (e.g., machine shops which do not handle hazardous.
materials, cars for personal transportation), the applicability of this
Order has been limited to those DOE operations that involve hazards
that are not routinely encountered and accepted in the course of
everyday living by the vast majority of the general public.
3. HAZARD CLASSES.
a. Consi
(1)
(2)
(3)
deration should be given to categorizing hazards into three c
Low - Those which present minor onsite and negligible offsite
impacts to people or the environment;
lasses:
impactsModerate - Those which present considerable potential onsite
to people or the environment, but at most only minor offsite impacts;
and
High - Those with the potential for onsite or offsite impacts to
large numbers of persons or for major impacts to the environment.
b. Supplemental guidance on categorization of hazard levels as well as
overall system safety methods can be found in MIL-STD-882B.
40 SAFETY ANALYSIS.
a. The safety analysis should address in appropriate detail the following
topics to the extent applicable:
(1) A description and evaluation of the site;
(2) Design criteria for systems, components, and structures;
DOE 5481.1B
9-23-86
b.
c.
d.
e.
f.
(3) Normal and emergency operating procedures to be used;
(4) Identification of hazards;
(5) Probability of occurrence and predicted consequences of hazards
expressed in qualitative or quantitative terms;
(6) Physical design features and administrative control s provided to
prevent or mitigate potential accidents;
(7) Potential accidents, including those resulting from natural
phenomena; and
(8) Operational limitations.
The analysis for a DOE operation which involves only hazards of a type
and magnitude routinely encountered and accepted by the public may be a
simple, formal statement of this fact.
There are long-standing requirements to analyze the safety of nuclear
activities, including packaging of nuclear materials (DOE 5480.3). The
continuation of these practices, including the application of Nuclear
Regulatory Commission safety analysis guidelines, as appropriate, will
generally satisfy the requirements of this Order.
Section 7
For complex or expensive operations, experience has indicated that it is
sometimes desirable to perform a safety analysis as early as possible in
the life cycle of the project. This permits early identification of
potential health, safety, or environmental problems and facilitates their
elimination or mitigation in the most cost effective manner. For such
projects, a two-stage safety analysis and reviews thereof are permitted,
a preliminary analysis prior to the start of substantial construction,
and a final analysis prior to initial operation.
The review and authorization levels for significant modifications to
DOE operations should be
the modification and not
operation. For example,
hazard than the original
authorization is needed.
selected based on-the hazards associated with
on the original authorization for the
if the modification contains a higher class of
operation, the corresponding higher level of
Among the factors that the line organization should consider in deter-
mining whether a proposed physical or administrative change constitutes
a significant modification are:
(1) Increases in the risk from a hazard beyond that previously
analyzed and reviewed. This may stem from changes in operating
characteristics such as speed, temperature, or pressure; increases
in the quantity of hazardous materials; and/or changes in design
features or administrative controls.
II-2
DOE 5481.1B
9-23-86
II-3
(2) Reductions in the reliability- of any item for which credit has been
taken for the reduction or control of a hazard.
(3) Introduction of a new hazard.
(4) Application of new regulations.
(5) Receipt of new information indicating. an increased hazard
associated with an existing operation.
g. The National Environmental Policy Act requires the preparation of an
environmental impact statement (EIS) for major Federal actions with a
significant environmental impact. The EIS is completed usually before
significant detailed design is initiated. The safety analysis required
by this Order naturally follows the EIS. It permits an evaluation of
whether the design will meet performance assumptions made in the EIS,
thereby providing the first level of assurance that environmental
protection will be as intended.
5. REVIEWS BY LINE ORGANIZATIONS.
a. Suggested review and authorization levels within DOE for the hazard
classes are: “..
Hazard Review Level Authorization Level
High Field and/or Headquarters Field and/or Headquarters
Moderate Operating Organization, Field and/or Headquarters
Field, and/or Headquarters
Low Operating Organization Operating Organization
b. The line organization may consider other factors in specifying its
particular authorization levels. Public interest, political
sensitivity, and program importance are considerations which may dictate
a higher level than would be needed solely for ES&H reasons.
c. The review that is required should be performed by DOE employees,
contractors, consultants, or a combination thereof. The line
organization may wish to obtain supplemental advice from outside
organizations.
d. The review process for large or complex operations may extend over
several months and involve several persons or groups, each making
comments and raising issues. Experience indicates that an
efficient, effective, and auditable method of documenting the many
separate efforts involved in a review is through an evaluation
report. Such a report would summarize the concerns raised during
the review, their resolutions, any commitments made, and final
Section 8
II-4 DOE 5481.1B
9-23-86
conclusions. When review actions are numerous or over an extended
period of time, the use of an evaluation report should be
considered. This evaluation report serves as an excellent
documented basis for the authorization.
e. As new energy technologies are developed, it is expected that general
design criteria will be established to provide stronger technical bases
for safety analyses and reviews thereof.
6.
7.
RECORDKEEPING. The permanent file that is required is to be maintained in
accordance with the requirements of DOE 1324.2. Conformance with the record
retention schedules to be issued as part of DOE 1324.2 will assure that the
necessary records frill be maintained beyond the termination or
decommissioning of a DOE operation and subsequent release of a site for
unrestricted use. Such long-term retention of records has been shown by
experience (e.g., excess sites) to be essential.
BACKFITTING. In applying the requirements of paragraph 4, Chapter I,
it is the intent of this Order that the efforts leading to the identifi-
cation and evaluation of ongoing DOE operations be conducted in an
orderly and reasoned manner.
a.
b.
c.
Only those ongoing DOE operations which could reasonably be expected
to have the potential for onsite or offsite impacts to large numbers
of persons or for major imp-acts to the environment are covered by this
Order.
The identification of such operations and estimation of
required to perform and review safety analyses is to be
before implementing this Order.
the resources
accomplished
hazards orThe safety analysis may uncover previously unidentified
unexpectedly high risks. What, if anything, should be done about these
may be largely a matter of cost-benefit tradeoffs. Administrative
controls over the DOE operation should be considered when cost-benefit
results are marginal.