DOE O 5480.29, Employee Concerns Management System
Functional areas: Environmental Quality & Impact
Superseded By:
DOE O 442.1, Department of Energy Employee Concerns Program on Feb 01, 1999
DOE O 442.1A, Department of Energy Employee Concerns Program on Jun 06, 2001
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE O 442.1Department of Energy Employee Concerns Program (Feb 01, 1999)
- DOE O 442.1ADepartment of Energy Employee Concerns Program (Jun 06, 2001)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
1-15-93
SUBJECT: EMPLOYEE CONCERNS MANAGEMENT SYSTEM
1.
2.
3.
PURPOSE. To create the framework for promptly identifying, reporting,
and resolving employee concerns regarding Department of Energy (DOE)
facilities or operations. These concerns originate from DOE employees or
DOE contractor or subcontractor employees having beliefs or technical
knowledge related to an impropriety or inadequacy associated with the
environment, safety, or health (ES&H) conditions of DOE and contractor-
managed nuclear and nonnuclear activities. The primary purpose of this
framework is to complement existing employee reporting procedures in
order to allow an independent avenue for anonymous and confidential
reporting and evaluation of employee ES&H concerns without supplanting
existing requirements in DOE Orders, rules, and regulations for employee
reporting.
CANCELLATION.
Chapter II, DOE 5483. 1A, OCCUPATIONAL SAFETY AND HEALTH PROGRAM FOR DOE
CONTRACTOR EMPLOYEES AT GOVERNMENT-OWNED CONTRACTOR-OPERATED FACILITIES,
of 6-22-83.
SCOPE. The provisions of this Order apply to all Departmental Elements.
Contractor or subcontractor employees performing work for the Department
may utilize the process described in this Order to file their concerns.
Situations by which a DOE, contractor, or subcontractor employee may
choose to file an employee concern include:
a. The need to express an ES&H concern through a nonroutine reporting
pathway because the employee is dissatisfied with the effectiveness
of existing employee concerns program procedures (for the purpose of
this Order, unless otherwise specified, employee is to mean DOE,
contractor, and subcontractor employees);
b. Fear of potential reprimand, retaliation, or duress as a result of
filing a concern within the routine management chain or other
existing reporting systems;
c. Belief that corrective actions for previously identified concerns are
not being implemented; or
d. The lack of an employee concerns program within a DOE contractor or
subcontractor organization.
DISTRIBUTION: INITIATED BY:
All Departmental Elements Office of Nuclear Energy
2 DOE 5480.29
1-15-93
4. Facilities and activities conducted under Executive
Order 12344 (42 U.S.C. 7158, note) are excluded from this Order
(paragraph 8i ).
5. POLICY. It is the policy of the Department that:
EXCLUSION.
a.
b.
c.
d.
e.
f.
Existing reporting procedures (per DOE 3790,1B, 5480.17, and other
applicable Directives) shall continue to be used in all instances
hw ere the reporting individual is assured of: 1) timely evaluation
and resolution of the concern; and 2) protection from reprimand,
retaliation, or duress. In cases where either provision cannot be
maintained, the Employee Concerns Management System (ECMS) will serve
to complement existing reporting pathways and shall provide all DOE,
contractor, and subcontractor employees access to a Field Office
hotline to express their concerns;
Employee concern reports shall be managed in a manner that assures
prompt identification, prioritization, evaluation, corrective and
protective response, and resolution of employee concerns raised by
DOE, contractor, and subcontractor employees;
The establishment and maintenance of the ECMS shall be the
responsibility of each Field Office; correspondingly, a Headquarters
management official shall be responsible for establishing and
maintaining an ECMS for Headquarters employees;
Employee concern reports
security interests shall
Employee concern reports
and
Section 2
regarding incidents of safeguards and
be reported in accordance with DOE 5639.3;
shall not contain classified information;
The use of existing employee concerns systems such as those
established by a DOE contractor is not a prerequisite to using this
system. However, employees should be encouraged to utilize these
existing programs first.
6. REFERENCS.
a. DOE 1324.5A, RECORDS MANAGEMENT PROGRAM, of 3-13-92, which
establishes the records disposition system for DOE and contractor
records.
b. DOE 1330.1D, COMPUTER SOFTWARE MANAGEMENT, of 5-18-92, which
establishes requirements for the management of computer software.
DOE 5480.29
1-15-93
3
j.
c.
d.
e.
f.
g.
h.
i.
k.
l.
m.
DOE 3790. 1B, FEDERAL EMPLOYEES OCCUPATIONAL SAFETY AND HEALTH
PROGRAM, of 1-7-93, which establishes the policy for the
implementation and administration of the occupational safety and
health program for Federal employees.
DOE 5480.17, SITE SAFETY REPRESENTATIVES, of 10-5-88, which
establishes the interim functions and procedures for Environment,
Safety and Health (EH) Site Safety Representatives.
DOE 5483. 1A, OCCUPATIONAL SAFETY AND HEALTH PROGRAM FOR DOE
CONTRACTOR EMPLOYEES AT GOVERNMENT-OWNED CONTRACTOR-OPERATED
FACILITIES, of 6-22-83, which establishes requirements and procedures
consistent with occupational safety and health standards promulgated
under the Occupational Safety and Health Act of 1970, Public Law 91-
596.
DOE 5484.1, ENVIRONMENTAL PROTECTION, SAFETY, AND HEALTH PROTECTION
INFORMATION REPORTING REQUIREMENTS, of 2-24-81, which establishes
requirements and practices for investigating environmental, health,
and safety occurrences for DOE operations.
DOE 5639.3, VIOLATION OF LAWS, LOSSES, AND INCIDENTS OF SECURITY
CONCERNS, of 9-15-92, which establishes procedures to assure timely
and effective action related to violation of criminal laws, losses,
and incidents of security concern to DOE.
DOE 5635.4, PROTECTION OF UNCLASSIFIED CONTROLLED NUCLEAR
INFORMATION, of 2-3-88, which establishes Policy and Procedures for
the protection of (UCNI).
DOE 5650.2B, IDENTIFICATION OF CLASSIFIED INFORMATION, of 12-31-91,
which specifies responsibility, authority, policy, and procedures for
the management of DOE classification systems.
DOE 5650.3A, IDENTIFICATION OF CLASSIFIED CONTROLLED NUCLEAR
INFORMATION, of 6-8-92, which establishes policy and procedures for
reviewing and marking documents and material containing unclassified
controlled nuclear information (UCNI).
The Inspector General Act of 1978, as amended, 5 U.S.C. app. 3.
Privacy Act of 1974, Public Law 93-579, 88 Stat. 1896 (5 U.S.C.
552a), as amended, which establishes laws to implement the Privacy
Act .
Freedom of Information Act of 1974, Public Law 93-502, 5 U.S.C. 552,
as amended, which establishes law to implement the Freedom of
Information Act.
4 DOE 5480.29
1-15-93
n.
o.
P.
q.
r.
s.
t.
u.
v.
DOE Privacy Act Regulations, 10 Code of Federal Regulations (CFR)
1008, "Records Maintained on Individuals," of 10-16-80, which
establishes the procedures to implement the Privacy Act of 1974
within DOE.
1 CFR 305, Use of(Ombudsmen by Federal Agencies.
10 CFR 24, Procedures for the Handling of Discrimination Complaints
under Federal Employee Protection Statutes.
10 CFR 708, Criteria and Procedures for DOE Contractor Employee
Protection Program.
29 CFR 1960, Safety and Health Provisions for Federal Employees,
which provides the regulations and guidelines for the implementation
of Executive Order 12196.
Section 3
Executive Order 12196, “Occupational Safety and Health Programs for
Federal Employees,” which establishes the requirement for Federal
agencies to provide occupational safety and health programs for their
employees.
Public Law 100-408, Price-Anderson Amendments Act (PAAA) of 1988.
Public Law 101-12, Whistleblower Protection Act of 1989.
OMB Circular NO. A-76, which mandates that criminal investigations be
performed by government employees and not contractor employees.
7. DEFINITIONS.
a.
b.
c.
d.
Contractor. Any person under contract or subcontract with the
Department of Energy with responsibility to perform activities in
DOE Operations.
Employee Concern.
connection with any facility, laboratory, or program at a DOE-owned
or leased facility.
Those DOE-funded activities for which DOE has
responsibility including the environment, safety, and health
programs.
A declaration, statement, or assertion of
impropriety or inadequacy associated with the ES&H aspects of DOE-
managed and contractor-managed activities, the validity of which has
not been established.
Concerns Manager (ECM). A DOE employee designated as a
single-point-of-contact reporting directly to the Field Office
Manager (FOM), or in Headquarters, reporting to AD-1, responsible for
the management of the ECMS.
Employee
5
DOE 5480.29
1-15-93
e. Employee Concerns Review Panel.
i. Program Secretarial Officers (PSO).
A panel of DOE employees and
specialized consultants (when appropriate) designated by the FOM and
selected by the ECM for evaluation of specific concerns received by
the ECM.
f. Field Office Manager (FOM). A DOE individual with management
responsibility for a field organization. The FOM is responsible for
the management, coordination, and administration of operations under
his or her purview and reports to the cognizant Program Secretarial
Officer(s) (PSO) through the appropriate program office(s). For the
purpose of this Order, a Field Project Manager who reports directly
to a PSO and is responsible for the management, coordination, and
administration of operations under his purview, is considered to be
an FOM. (This definition also applies to other self-supporting DOE
offices, such as the Rocky Flats Office, Superconducting Super
Collider Project Office and Strategic Petroleum Reserve Project
Office, which report directly to a PSO.)
g. Lead Program Secretarial Officer (Lead PSO). The PSO assigned line
management responsibility and accountability for Headquarters and
Field Office operations. One or more multiprogram Field Offices
report directly to the Lead PSO, who is responsible for coordinating
and resolving institutional and cross-cutting issues. Lead PSO
assignments are as follows: Defense Programs for the Albuquerque,
Nevada, and Savannah River Field Offices; Energy Research for the
Chicago and San Francisco Field Offices; Nuclear Energy for the Idaho
and Oak Ridge Field Offices; and Environmental Restoration and Waste
Management for the Richland Field Office and the Fernald Field
Office.
h. Originator. The DOE, contractor, or subcontractor employee who
originates the employee concern.
The heads of DOE offices with
responsibility for specific DOE programs or facilities. These
include the Assistant Secretaries for Nuclear Energy (NE), Defense
Programs (DP), Environmental Restoration and Waste Management (EM),
Fossil Energy (FE), Conservation and Renewable Energy (CE), and the
Directors of Energy Research (ER) and Civilian Radioactive Waste
Management (RW). For the purpose of this Order, this definition also
includes the Administrators of the Bonneville and Western Area Power
Administrations.
Section 4
j. Summary Employee Concern Report. A non-classified summary or other
brief report of an employee's concern which does not contain the
employee's name or other information which could identify the
employee.
6 DOE 5480.29
1-15-93
8. RESPONSIBILIT IES.
a. Program Secretarial Officers. For Field Offices under their
cognizance, PSOs shall monitor the ECMS to assure that all issues are
addressed promptly and effectively. In addition, the PSOs shall:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
Provide clear and explicit delegations of authority and
responsibilities;
Take necessary management actions including the requirement that
budget proposals for their assigned functions provide adequate
ES&H resources for the implementation of this Order;
Provide the Assistant Secretary for Environment, Safety and
Health (EH-1) and the Director of the Office of Nuclear Safety
(NS-1) with copies of field organization implementation plans for
the ECMS;
Perform program reviews to confirm effective implementation of
Field Office ECMS per the requirements of this Order;
Respond to any outstanding employee concern that cannot be
resolved at the Field Office level;
Coordinate with all Headquarters officials and functions as
necessary;
Review all recommended actions arising from a concern originating
from a DOE employee;
Develop an appeals process for those concerns where employees are
dissatisfied with the FOM or Headquarters (AD-1) decision and
wish to appeal the decision; and
Review decisions on all appeals of this process before a final
disposition is rendered.
b. Assistant Secretarv for Nuclear Eneray (NE-1), in addition to the PSO
responsibilities prescribed in this Order and in paragraph 8a above,
has overall Departmental policy responsibility for employee concerns
program activities, and specifically shall:
(1) Develop, promulgate, and maintain policies and procedures
necessary to implement and sustain an effective ECMS;
(2) Provide formal Departmental interpretation of the requirements of
this Order;
DOE 5480.29
1-15-93
7
(3) Develop, promulgate, and maintain guidance materials and conduct
workshops, as necessary, for implementing the requirements of
this Order; and
(4) Monitor appraisal reports (i.e., Technical Safety Appraisals,
self assessments) relative to reporting activities at DOE
facilities to assess implementation of this Order and to identify
needed improvements.
c. Assistant Secretary for Evironment. Safety and Health (EH-1), acting
as the independent element responsible for nonnuclear safety,
environment, occupational safety, and health oversight of line
management for the Department, shall:
(1)
(2)
(3)
(4)
(5)
(6)
Review and evaluate the results of employee concerns evaluations
and determine if lessons-learned have generic applicability
warranting DOE-wide dissemination;
Review employee concerns and identify circumstances that are
indicative of deteriorating or poor program performance in the EH
areas of responsibility which may warrant further actions;
Review employee concern reports for immediate significance;
Assure that the EH site safety representative who receives
concerns per DOE 5480.17 refers such concerns to the ECMS;
Coordinate with other Headquarters officials on functions and
matters relating to ES&H; and
Section 5
Monitor and audit all aspects of the implementation of this Order
d. Inspector General (IG),
related to nonnuclear safety concerns in review of HQ and FO
specific procedures and evaluation.
pursuant to the Inspector General Act of 1978
as amended, 5 U.S.C. app 3, reviews concerns pertaining to waste,
fraud, abuse, and mismanagement. The ECM will refer such concerns
received through the ECHS to the IG.
e. Director of Administration and Management (AD) shall:
(1) Prioritize, evaluate, and resolve DOE employee concerns
pertaining to the occupational safety and health of Federal
employees, per 29 CFR 1960 and Executive Order 12196;
(2) Serve as the DOE Headquarters FOM for concerns raised by
Headquarters employees;
8 DOE 5480.29
1-15-93
(3)
(4)
Establish and maintain a Headquarters ECMS (apart from any
hotline established by the DOE Inspector general for waste,
fraud, abuse, and mismanagement) with an ECM reporting directly
to the Office of the Director; and
Provide copies of implementation plans to EH-1 and NS-1.
f. Field Office Manager (FOM) shall:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
Establish and maintain an ECMS (apart from any hotline
established by the DOE Inspector General for waste, fraud, abuse,
and mismanagement) with an ECM reporting directly to the FOM;
Assure the prompt prioritization, evaluation, and resolution of
employee concern reports;
Assure that reports are reviewed for classified information
content and properly sanitized by an authorized classifier in
accordance with procedures found in DOE 5650.2B;
Verify that actions are taken by DOE and DOE contractors to
minimize, correct, or prevent recurrences;
Assure that quarterly status reports are reviewed for lessons
learned and possible adverse trends and disseminated to DOE
organizational elements as appropriate;
Encourage contractors to implement an Employee Concerns Program
for their employees;
Provide adequate ECMS training for Field Office and Headquarters
management and staff personnel for the purposes of training
hotline operators, employee concern coordinators, and other
involved personnel. In addition, assure that employees are
provided with information about the ECMS;
Assure that employee concern reports that involve:
(a) Potential employee security viol at ions are referred to the
Office of Security Affairs;
(b) Contractor or subcontractor whistleblower complaints of
reprisals are referred to the Office of Contractor Employee
Protection and DOE Federal employees alleging whistleblower
complaints of reprisals are informed that they should file
their complaint with the Office of Special Counsel in
accordance with the Federal Whistleblower Protection Act of
1989;
DOE 5480.29
1-15-93
9
(9)
(l0)
(11)
(12)
(13)
(14)
(c) Waste, fraud, abuse, or mismanagement are referred to the
Office of Inspector General;
(d) Potential violation of rules subject to the Price-Anderson
Amendment Act of 1988 (PAAA) enforcement authority, criminal
acts involving potential nuclear safety matters (e.g.,
falsification of plant logs and records), or other willful
violations of DOE rules, Orders, regulations in the area of
nuclear safety are referred to the Office of Nuclear Safety;
(e) Equal Employment Opportunity (EEO)/personnel complaints are
forwarded to the Office of Administration and Management;
and
(f) Complaints of potential violations of requirements of other
Federal agencies, i.e., Nuclear Regulatory Commission (NRC)
for NRC licensed activities, the U.S. Forestry Service for
their activities on DOE sites, etc., are referred to those
agencies;
Section 6
Obtain General Counsel (GC) assistance in determining the final
disposition of employee concerns, when appropriate;
Prepare and submit an implementation plan for this Order to the
appropriate Headquarters program organization;
Appoint a DOE Evaluations Board as required by DOE 5484,1, where
appropriate;
Provide new DOE employees information on the ECMS as part of
employee indoctrination;
Periodically review concerns referred to organizations not
directly involved with the ECM (i.e., IG, Security, etc.) and
those provided to the panel for review to ensure the
appropriateness of the referral; and
Forward all reviews and proposed actions on concerns which arise
g. Director of the Office of Nuclear Safety (NS-1),
from DOE employees to the cognizant PSO.
acting as the
independent element responsible for nuclear safety oversight of line
management for the Department, shall:
(1) Monitor and audit all aspects of the implementation of this Order
related to nuclear safety concerns including review of FOM
specific procedures, training of managers and supervisors in
handling employee concerns, and evaluation of the adequacy of the
10 DOE 5480.29
1-15-93
(2)
(3)
(4)
ECMS evaluation reports and provide assistance in implementation
and evaluate the adequacy of corrective action reports;
Review employee concerns and identify circumstances that are
indicative of deterioration or poor program performance in
nuclear safety which may warrant further action;
Conduct inquiries and investigations of allegations involving
potential violations of rules subject to PAAA enforcement
authority, criminal acts involving potential nuclear safety
matters, (e.g., falsification of plant logs and records), other
willful violations of DOE rules, regulations and Orders in the
area of nuclear safety; and
Assure that the NS site representatives who receive concerns
i. Director of
refer these concerns to the ECMS.
h. Office of Contractor Employee protect ion Program. Receive and
consider for further evaluation, those contractor employee concerns
received through the ECMS that encompass alleged discriminatory
actions per the specific regulations found in 10 CFR 708.
The Naval Nuclear Propulsion Program. Presidential
Executive Order 12344, statutorily y prescribed by P. L. 98-525, 42
U.S.C. 7158, Note (1984) establishes the responsibilities and
authorities of the Director of the Naval Nuclear Propulsion Program
(who is also the Deputy Assistant Secretary for Naval Reactors within
the Department) over all facilities and activities which comprise the
Program, a joint Navy-DOE organization. These executive and
legislative actions establish that the Director is responsible for
all matters pertaining to Naval nuclear propulsion for all Program
facilities and activities. Accordingly, the provisions of this Order
do not apply to the Naval Nuclear Propulsion Program.
9. PROGRAM REQUIREMENTS.
a. Field Offices, Headquarters (AD-l), and PSOs, responsible for
directly managing operations at Government-owned and operated
facilities (e.g., Office of Fossil Energy), shall establish an ECMS
that:
(1) Provides for the necessary prioritizing, evaluation, and
resolution to employee concerns by appointing a ECM directly in
charge of the ECMS who will follow the responsibilities detailed
in paragraph 9b below;
(2) Provides for effective commnunication methods for assuring that
employees are aware of the program and how to use it, including
the intent that employee concern reports should normally be filed
Section 7
DOE 5480.29
1-15-93
11
(3)
(4)
(5)
(6)
(7)
only after encountering dissatisfaction or having a lack of
confidence with existing concerns reporting systems. Attachment
1 provides an example of an information poster. Similar posters
shall be conspicuously located in the work place;
Establishes a formal and measurable tracking system of employee
concern status, from identification to closure, for the purposes
of transfer of information and accountability;
Maintains a secure filing system that contains all materials
developed for the evaluation of the employee concern from
identification to closure. Limited access of the files shall be
maintained to assure anonymity or confidentiality;
Has the capability for ensuring that the originator can be
informed of the status and disposition of the concern (responses
should include sufficient detail to establish the credibility of
the evaluation and give assurance of corrective/preventive
action, if applicable);
Maintains a 24-hour telephone capability (which can be a
recording device, see paragraph 9b(9)) for the purposes of
accessibility and timeliness of reporting. The originator shall
also be allowed to submit his/her concern formally in writing if
he/she so prefers. Attachment 2 provides an example of an
employee concern report format. If an employee filing an oral
concern declines to submit a written concern, the ECM shall
attempt to obtain the employee’s name, address, and telephone
number in order to respond to the person at a later date. The
originator should provide sufficient detail to allow for the
identification of an employee concern without transmitting
classified information either over the telephone or through the
mail;
Assures distribution of copies of ES&H and nuclear safety
concerns to line management, EH-1 and NS-1 within 10 working days
of receipt. If the concern involves potential violations of PAAA
enforcement authority, criminal acts involving potential nuclear
safety matters (e.g., falsification of plant logs and records),
other willful violations of DOE rules, Orders, or regulations in
the area of nuclear safety, the ECM will provide copies of the
employee concern report to NS-1 for investigation. Those
concerns which involve other DOE organizations or other
governmental agencies having explicit jurisdiction should be
referred to those DOE organizations or agencies (e.g., IG for
fraud, waste, abuse, and mismanagement or NRC for licensed
activities). Tracking of the disposition of these concerns
should be kept by the ECM in the ECMS to the extent practicable
for complete recordkeeping;
12 DOE 5480.29
1-15-93
(8)
(9)
Guards the anonymity or confidentiality of the employee
expressing a concern to the extent practicable throughout the
reporting and evaluation process. The ECM will ensure that the
identity of the employee who requests confidentiality will be
maintained to the extent practicable by law. As a matter of
general policy, names shall be deleted from all concerns related
documents unless the employee explicitly requests that his or her
name be revealed. An employee concern should not be given to the
employee’s organization for evaluation and disposition, unless
the
(a)
(b)
employee authorizes such action.
Unless explicitly requested by the employee, the form used
in the evaluation process shall contain no information
identifying the employee raising the concern. If
handwritten, a concern shall be typed or printed by the ECM
and shall be reworded, if necessary, to obscure the identity
of the employee raising the concern.
Section 8
The original written concern and any other information
bearing the employee’s name shall be treated in a
confidential manner (i.e., shall be kept in a locked file in
the DOE office and shall not be taken into the field or
circulated with letters received in response to inquiries
made during the evaluation of the concern).
Provides for the review and evaluation of an employee’s concern
b. Employee Concerns Manager.
by either the ECM or the Employee Concerns Review Panel in
accordance with this Order and Chapters I and II, paragraph 6.
FOMs shall appoint an ECM, reporting
directly to the FOM to manage information regarding employee
concerns. Headquarters (AD- 1) shall also appoint an ECM, reporting
directly to AD-1, to manage information regarding employee concerns.
In addition, PSOs responsible for directly managing operations at
Government-owned and operated facilities shall also appoint an ECM
reporting directly to the PSO, to manage information regarding
employee concerns. Specific responsibilities include:
(1) Implementing, coordinating, and directing the operation of the
ECMS program including the use of an Employees Concern Review
Panel, as appropriate, and collecting and preparing employee
concerns for evaluation;
(2) Redirecting, when appropriate, employee concerns to the
responsible organization in accordance with the guidance set
forth in paragraph 8f of this Order; an employee concern should
not normally be turned over to the employee’s immediate
DOE 5480.29 13
1-15-93
(3)
(4)
(5)
(6)
(7)
(8)
(9)
management/supervisor for evaluation unless the employee
authorizes such;
Determining the significance of employee concerns by using the
criteria provided in paragraph 9d and paragraph 7 of Chapter I of
this Order and categorizing the concerns either by hazard,
severity, area, or organization or a combination thereof which
allows for proper responses to critical conditions and supports
Information retrievability, trending, and analysis;
Establishing and maintaining a formal tracking system for all
concerns received per paragraph 9a(3);
Entering the report (Attachment 2) in the tracking system,
assigning a unique number and generating a document with
distribution to appropriate line management and EH-1 or NS-1, for
their respective areas of authority, within 10 working days of
receipt of the concern. As a minimum, the tracking system will
include date and time received, identification code, date of
report, location of concern, brief description, classification,
and nature of action taken. If the tracking system is automated,
requirements found in both DOE 1330.1D and DOE 1324.5A should be
followed;
Providing “status only” information to requesting originators
until resolution of the concern after which an abbreviated
summary of the final resolution may be given upon request by the
originator;
Providing a “summary’ copy to DOE personnel with a need to know
who officially request the concerns information. The Employee
Concerns Review Panel, when utilized, will receive a copy of the
employee concern report (without the employee’s name) for their
review;
Monitoring employee concerns evaluations, resolutions, and
schedules in accordance with this Order, utilizing the specific
guidelines found in Chapters I and II;
Establishing and maintaining an ECMS Telephone Hotline that:
Section 9
(a) Provides 24-hour telephone access. (The number shall be
placed in the DOE Telephone Directory. A toll free number
may need to be provided if covered employees work outside
the area code where the ECM is located. Answering machines
may be used if they are secured in controlled area such as a
locked office or a locked cabinet in a limited access
area.); and
14
DOE 5480.29
1-15-93
(l0)
(11)
(12)
(13)
(14)
(15)
(b) Protects the anonymity and confidentiality of the originator
when requested;
Ensuring that posters identifying the ECMS Telephone Hotline
number are placed in conspicuous locations throughout the site to
provide employees with information about the ECMS. A toll free
number may need to be provided if covered employees work outside
the area code where the ECM is located;
Ensuring that all documents obtained or prepared in the course of
handling an employee concern are treated in a sensitive manner to
protect anonymity or confidentiality of the originator and that
all documents are reviewed for classification in accordance with
procedures found in DOE 5650.2B with particular attention to the
use of DOE 5650.3A and DOE 5635.4;
Advising the EH and NS Site Safety Representatives of significant
issues in areas of their responsibility;
Advising the FOM, AD-1, or PSO of all significant issues defined
in paragraph 9d below, and in particular, notifying the FOM,
AD-1, or PSO within 2 hours of any employee concern that poses an
immediate threat to the safety of the public or workers;
Maintaining an information base for preparing quarterly status
reports per paragraph 9h (including information required by 29
CFR 1960.28(d)(2)); and
Referring to NS-1 for investigation, concerns which involve
c. Employee Concerns Review Panel. Field Offices, Headquarters (AD-l),
and PSOs, responsible for directly managing operations at government-
owned and operated facilities, shall establish an ad hoc panel to
fulfill the duties detailed below. Panel members shall be selected
to ensure representation of senior management and technical staff to
assess the significance of concerns. The employee concerns
resolution process shall be structured to encourage resolution of the
concern at a management level appropriate to the nature of the
concern. Therefore, the panel need not be composed of permanent
DOE 5480.29
1-15-93
15
members, but can be changed to ensure that at least one member has
the required expertise in the area of the concern. Specific
responsibilities when a panel is used include:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
d. The
Redirecting, when appropriate, employee concerns to appropriate
organizations as outlined in paragraph 8f;
Determining the significance of employee concerns by using the
criteria provided in paragraph 9d and Chapter I, paragraph 7, of
this Order and categorizing the concerns either by hazard,
severity, area, or organization or a combination thereof which
allows for proper responses to critical condition and support
information retrievability, trending, and analysis;
Assigning responsibility within the panel for acknowledgement,
evaluation, resolution, and close-out of each employee concern
report and developing evaluation and resolution schedules
utilizing the specific guidelines found in Chapter I and 11 in
accordance with this Order (the organizational element which is
the subject of concern should not be directly involved in the
evaluation to ensure independence of the evaluation);
Section 10
Reviewing evaluation findings and determining the disposition
status of existing concerns;
Ensuring that if the concern is substantiated, actions are taken
to correct the identified deficient conditions and preventive
actions taken to preclude its recurrence and effects (i.e., root
cause, quality impact, generic implication);
Ensuring that employee concerns are closed-out in accordance with
established schedules and that those actions arising from DOE
employee concerns are reviewed by the Lead PSO, AD-1, or a PSO,
responsible for directly managing operations at Government-owned
and operated facilities before they are closed; and
Ensuring that all evaluations and related employee concerns
processing procedures are adequately documented.
following are intended to be illustrative, but not all inclusive,
of criteria which should be utilized to assess the significance of
the concern. Immediate
the concern involves:
(1) Initiation of work
or health concerns
term threat to the
significance is judged by determining whether
in the face of identified environment, safety,
which could result in an immediate or near-
safety of the public or workers;
16 DOE 5480.29
1-15-93
(2)
(3)
(4)
(5)
(6)
Continuation of operations in the face of inoperable or deficient
ES&H equipment, monitoring instrumentation, or systems;
Any violations of PAAA enforcement authority, criminal acts
involving nuclear safety matters (e.g., falsification of plant
logs and records), other willful violations of DOE rules, Orders,
and regulations; operational procedures, specification limits, or
criminal acts;
Deficiencies observed in the normal reporting system (i.e., lack
of notification of ES&H issues and events of significance to
proper authorities as required by DOE Orders, procedures, and
Federal and State environmental laws);
The collection, dissemination, and recording of inaccurate or
falsified ES&H related data; or
Material misrepresentations to inspectors, auditors, or reviewers
when performing official duties. -
e. After the completion of an evaluation in response to an employee
concern, the employee shall be informed in writing, within 30
calendar days of completion of the review, of the results. In
addition:
(1) The concerned employee shall be notified of his or her right to
seek from the ECM further clarification of the determination if
any questions remain; and
(2) The employee shall also be advised by the ECM that, if
dissatisfaction remains with the determination, it is DOE policy
to grant review of such determination by the Lead PSO, AD-1, or a
PSO responsible for directly managing operations at a Government-
owned and operated facility. The employee may request an appeal
of the initial decision in writing to the cognizant PSO or AD-1
(for Headquarters employees) within 30 calendar days of receipt
of the determination.
f. Employee concerns shall be processed within the following timeframes:
(1)
(2)
Acknowledgements regarding priority determination and the
established resolution schedule will be available to the
originator within 5 working days of receipt of the concern;
All evaluations shall be completed within 30 working days of
assignment;
DOE 5480.29 17
1-15-93
(3) Exceptions to the 30-day evaluation requirement for any employee
concern must be formally documented and sent to the FOM which
should include a proposed schedule and list of required actions
to complete the resolution of the concern;
Section 11
(4) Contractor whistleblower concerns shall be processed in
accordance with the timeframes set forth in 10 CFR 708; and
(5) Alleged violations of rules subject to PAAA, enforcement
authority, criminal acts involving nuclear safety matters (e.g.,
falsification of plant logs and records), other willful
violations of DOE rules, Orders, or regulations in the area of
nuclear safety shall be referred to NS-1 for investigation within
10 workdays of receipt of the concern or within 2 hours if the
concern poses an immediate threat to the safety of the public or
worker.
g. Written communication to an employee who filed a concern shall be
sent to the employee’s home address or other specified location
unless specific instructions have been given to send such notice to
the place of employment.
h. Documentation.
(1) The ECM will issue a quarterly report of all employee concerns
reports initiated, closed, or remaining unresolved during the
past quarter to the Employee Concerns Review Panel (where a
standing commnittee exists), and the Field Office Manager, AD-1
(for Headquarters employee concerns), and cognizant PSO, with a
copy to EH-1, NS-1. These quarterly status reports shall
include, at a minimum, each report number, priority, title,
evaluation, completion schedule, significance of the concern,
reason the employee filed the concern, categorization of current
resolution status, organization responsible for resolution, and
statistical summaries. In order to maintain anonymity or
confidentiality when requested, there will be limited access to
the information contained in quarterly status reports.
Statistical summaries, however, can be made available to the
general public.
18 DOE 5480.29
1-15-93
(2) Records will be maintained of all documents supporting all
employee concerns including disposition and remedial/corrective
actions proposed (e.g., design changes, personnel training,
material changes, maintenance, or procedure revision) or actions
already taken to preclude, prevent, or mitigate future
recurrences. All records will adhere to DOE 1324.5A for records
disposition.
JAMES D. WATKINS
A Admiral, U.S. Navy (Retired)
DOE 5480.29
1-15-93
Attachment 1
Page 1 (and 2)
DOE - [
FIELD OFFICE
HAS AN EMPLOYEE
“HOTLINE”
TO HELP IDENTIFY AND RESOLVE ES&H
CONCERNS RELATING TO ROE PROGRAMS
YOUR ASSISTANCE IN INFORMING US ABOUT SUCH CONCERNS IS
ESSENTIAL TO THE SUCCESS OF DOE OPERATIONS. YOU MAY USE
THE PHONE NUMBER BELOW OR THE PREPAID MAILERS ADJACENT TO THIS
POSTER TO COMMUNICATE THOSE CONCERNS. IF YOU USE THE HOTLINE,
TAKE THE TIME TO ORGANIZE YOUR THOUGHTS IN KEEPING WITH THE
INFORMATION REQUESTED ON THE MAILER.
HOTLINE NUMBER (24 HOURS)
NOTE: YOU ARE ENCOURAGED TO REPORT YOUR CONCERN IN
ACCORDANCE WITH YOUR ORGANIZATION’S ESTABLISHED
REPORTING PROCEDURES.
DOE 5480.29 Attachment 2
1-15-93 Page 1
Attachment 2 DOE 5480.29
Page 2 1-15-93
I-1 DOE 5480.29
1-15-93
EMPLOYEE OCCUPATIONAL SAFETY AND HEALTH (OSH) CONCERNS
1.
2.
3.
4.
5.
6.
CHAPTER I
PURPOSE. This chapter establishes requirements for the disposition of
employee occupational safety and health (OSH) concerns received through
the ECM. Employees are encouraged to work with their employer to
resolve OSH concerns before they utilize this system, but this is not a
prerequisite for filing of a complaint. However, Federal employees may
at any time raise concerns to DOE management or directly to the
Department of Labor, pursuant to 10 CFR 1960.
Section 12
DOE RESPONSE. Upon receipt of an employee OSH concern, DOE line
management shall prioritize, evaluate, and resolve employee concerns
in accordance with paragraph 9 (Program Requirements) of this Order.
CONFIDENTIALITY. Anonymity or confidentiality of the employee shall
conform to the program requirements of this Order (paragraph 9).
WHO MAY FILE. Employee OSH concerns may be filed by:
a. Employees (Federal and Contractor);
b. Former Employees; or
c. Authorized Representatives of Employees.
All employee
the ECM who shall be authorized to
person submitting the concern.
a. Anonymity and confi dentiality.
anonymity and confidentiality,
RECEIPT OF CONCERNS. OSH concerns shall be received by
obtain all information from the
Employees have the right to
when requested.
b. Worksite Inspections. A person filing an OSH concern shall be
advised that it is standard practice to conduct worksite
inspections to evaluate the concern’s alleged hazards and to
initiate the process of taking corrective action.
EVALUATION OF CONCERNS. The evaluation and determination of the
significance of employee OSH concerns requires professional judgment
and is generally performed by a senior DOE OSH professional (as
established by DOE personnel requirements). In some cases, it may be
necessary to contact the employee for additional information.
I-2 DOE 5480.29
1-15-93
a. Narrative. In completing an additional inquiry, an attempt should
be made to obtain the following:
(1) For All Concerns.
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
Describe the unsafe or unhealthful condition; identify
the location; and describe the nature of the exposure.
Describe the work being performed. Identify, as well as
can be determined, the type and condition of equipment in
use, the materials (e.g., chemicals) being used, the
process/operation involved, and the kinds of work being
performed near the hazard.
Describe how often the task is performed and the length
of time for one task. Determine how long the condition
existed and if it has been brought to the contractor’s
attention. Determine if any attempts were made to
correct the condition.
Determine the number of shifts involved, the length of
each shift, the number of shifts involved in the
hazardous condition.
Determine what personal protective equipment is required
and its use by employees.
Determine the number of people working in the area.
Determine how many are exposed to the hazard and their
proximity to the hazard.
If there is a designated employee representative in the
establishment, include the name, address, and telephone
number of the union and/or of the employee
representative(s).
List the details of any “near-miss incidents” that may
have occurred.
Determine if any employees have been injured or made ill
by exposure to the hazard.
Describe any effects on the public.
Describe corrective actions or protective equipment and
procedures used or required on the job.
DOE 5480.29
1-15-93
I-3
(2) FOR HEALTH CONCERNS.
(a)
(b)
(c)
(d)
Detail any monitoring work the contractor performed to
determine employee exposure levels to the hazardous
conditions or substance. Describe these tests. Detail
any records that show if exposed employees have been
given the results of the tests. List the test results.
Describe the engineering controls that are in place,
including any personnel protective equipment utilized,
e.g., treatment/filtration systems control devices, and
suits that may reduce the exposure. Also describe the
medical surveillance programs utilized.
Section 13
Discuss administrative or work practice controls the
contractor requires and whether they are used.
Discuss if employees have any symptoms that may have been
caused by exposure to the emission/release of the
substance. Discuss if any employees have ever been
treated by a doctor for an exposure related condition.
7. EMPLOYEE OSH CONCERN PRIORITIZATIONS. The ECM shall ensure that an
initial determination of health and safety significance of the concern
is performed. Priorities for resolution shall be established based on
the determination of the risk of the concern. Generic guidance for
safety significance is provided in paragraph 9 of this Order. However,
for
a.
b.
c.
OSH concerns, additional classifications are provided below;
Imminent DangerCondition/Concern. Refers to any condition or
practice in any workplace which is such that a danger exists which
could reasonably be expected to cause death or serious physical
harm immediately or before the onset of such danger and can be
eliminated through the normal procedural mechanism. In no case
shall the time elapsed from receipt of concern to inspection exceed
24 hours. Any additional delay shall require the authorization of
the Lead PSO.
Serious Condition/Concern. Refers to a hazard, violation, or
condition such that there is a substantial probability that death
or serious physical harm, property loss, and/or environmental
impact could result. These concerns shall be evaluated within 3
workdays.
Other-than -Serious Condition/Concern. Includes hazards,
violations, or conditions which may not result in death or serious
physical harm, property loss, and/or environmental impact but may
have a direct and immediate relationship to worker safety and
health or the environment. These concerns shall be evaluated
within 20 workdays.
I-4 DOE 5480.29
1-15-93
8. SCOPE OF EVALUATION. Generally, evaluations conducted in response to
employee OSH concerns shall be limited to the areas specifically
addressed in the concerns. If the ECH or the Employee Concern Review
Panel believes that the scope of the evaluation should be expanded
because of information indicating the likelihood of serious hazards in
other areas of the facility (e.g., an unusual number or type of
injuries has occurred or a concern alleging imminent danger or serious
hazards was received while conducting the evaluation), the review panel
or ECH should recommend to the FOM, cognizant PSO, or AD-1 (for
Headquarters employees) the extent that the evaluation should be
expanded. Based on this recommendation, the FOM shall decide whether
the evaluations are to be expanded.
9. PROCEDURES. In addition to the procedures found in the Order, the
following are provided for conducting evaluations in response to
employee OSH concerns. Particular attention, however, is directed to
the following special requirements for evaluations of concerns:
a. The concern may be discussed with the
contractor at an opening conference when one is held. In the case
of a multicontractor site, the concern, including those related to
subcontractors, may be discussed with the contractor as well as
with the subcontractor about whom a concern has been filed.
Copy of the Concern.
b. alkaround Rights. In an evaluation, the walkaround rights of a
contractor or an employee representative shall conform to the
provisions of DOE 5483.1A. The employee representative will be
chosen in accordance with the procedures in DOE 5483.1A and, thus,
the concerned employee may not necessarily be the employee
representative for walkaround purposes.
Section 14
W
c. All hazards identified during the course of an
evaluation shall be documented and included in reports to be
issued. If unusual delays are met in issuing a report of results,
the employee and, if appropriate, the employee representative shall
be informed of such delays. A delay of more than 30 calendar days
following the evaluation shall warrant such notification.
Report of Results.
DOE 5480.29
1-15-93
II-1
PURPOSE.
DOE RESPONSE.
RE
a. Anonymity and Confidentiality.
Worksite Inspections.
CHAPTER II
EPLOYEE ENVIRONMETAL PROTECTION AND NUCLEAR SAFETY CONCERNS
1. This chapter establishes requirements for the disposition of
employee environmental and nuclear safety concerns received through the
ECM. Employees are encouraged to work with their employer to resolve
environmental or nuclear safety concerns before they utilize this system,
but this is not a prerequisite for the filing of a complaint.
2. Upon receipt of an employee environmental or nuclear
safety concern, DOE line management shall prioritize, evaluate, and
resolve employee concerns in accordance with paragraph 9 (Program
Requirements) of this Order.
3. CONFIDENTIALITY. Anonymity or confidentiality of the employee shall
conform to the program requirements of this Order (paragraph 9).
4. WHO MAY FILE. Employee environmental and nuclear safety concerns may be
filed by:
a. Employees (Federal and Contractor); or
b. Former Employees.
5. CEIPT OF CONCERNS. All employee environmental and nuclear safety
concerns shall be directed to the ECM, who is authorized to obtain all
information from the person submitting the concern.
Employees have the right to anonymity
and confidentiality, when requested.
b. A person filing an environmental or nuclear
safety concern shall be advised that it is standard practice to
conduct facility and site inspections to evaluate the concern’s
alleged hazards/risks and to initiate the process of taking
corrective actions.
6. The evaluation and determination of the
significance of employee environmental or nuclear safety concerns
requires professional judgement and is generally performed by a senior
DOE environmental or nuclear safety professional (as established by DOE
personnel requirements). In some cases, it may be necessary to contact
the employee for additional information.
EVALUATION OF CONCERNS.
II-2 DOE 5480.29
1-15-93
a. In completing an additional inquiry, an attempt should be
made to obtain the following information:
Narrative.
(1) For All Concerns.
(a) Fully describe the nature or circumstances of the nuclear
safety or environmental concern. Identify the source of
the potential or actual emissions or releases or alleged
violations, unsound environmental practices, and identify
the location.
(b) Length of time condition existed. Attempts made to correct
the condition. Prior contractor or DOE notification of the
condition.
(c) Number of people working in the area. Population centers
nearby that may be exposed to the release. Number of
people potentially exposed to the emission/release.
Proximity of the people to the emission/release.
(d) Number of potential or actual “near-miss” incidents of
emissions/releases.
(e) The number of employees injured or made i 11 by exposure to
the emissions/release. Members of the public who have been
exposed to the emission/release.
(2) For Nuclear or Enviromental Concerns Potential or Actual
Emission/Releases.
Section 15
(a) Monitoring completed by contractor to determine exposure
levels to the emission/releases, conditions, or substance.
Describe these tests. Address whether exposed employees
have been given the results of their exposure testing.
Include the test results in the report.
(b) Discuss what engineering controls and personnel protective
equipment are in place (e.g., treatment systems control
devices) that may reduce exposure to the emission/release.
(c) Discuss administrative or work practice controls the
contractor requires and whether they are used (i.e.,
Technical Safety Requirements or Procedures).
(d) Discuss if employees have any symptoms that may have been
caused by exposure to the emission/release of the
substances. Discuss if any employees have ever been
treated by a doctor for an exposure related condition.
DOE 5480.29 II-3
1-15-93
For Environmental Potential or Actual Safety Emission Releases.
7.
8.
9. PROCEDURES.
a. Copy of the Concern.
(3)
Discuss whether employees have been injured as a result of
potential or actual emission/release or operations condition.
(4) Referrals to the Office of Nuclear Safety. Concerns which
involve potential violations of DOE rules subject to PAAA,
willful violations of other DOE Orders, rules, or regulations in
the area of nuclear safety shall be referred to NS-1 for
investigation.
EMPLOYEE ENVIROMENTAL OR NUCLEAR SAFETY CONCERN PRIORITIZATIONS. The
ECM shall ensure that an initial determination of health and safety
significance of the concern is performed. Priorities for resolution
shall be based on the determination of the risk of the concern. Generic
guidance for safety significance is provided in paragraph 9 of this
Order.
SCOPE OF EVALUAT IONS. Generally, evaluations conducted in response to
employee environmental or nuclear safety concerns shall be limited to the
areas specifically addressed in the concerns. If the ECM or the Employee
Concerns Review Panel believes that the scope of the evaluation should be
expanded, they should recommend to the FOM, cognizant PSO, or AD-1 (for
Headquarters employees) the extent that the evaluation should be
expanded. Based on this recommendation, the FOM, cognizant PSO, or AD-1
(for Headquarters employees) shall decide if the evaluation is to be
expanded (e.g., potential wide-spread environmental contamination via
air, groundwater, etc.).
In general, the procedures in this Chapter shall be followed
in conducting evaluations in response to employee environmental or
nuclear safety concerns. Particular attention, however, is directed to
the following special requirements for evaluations of concerns:
The concern may be discussed with the
contractor at an opening conference when one is held. In the case of
a multicontractor site, the concern, including those related to
subcontractors, may be discussed with the contractor as well as with
the subcontractor about whom a concern has been filed. Willful or
intentional violation of DOE regulations, rules, or Orders shall not
be discussed with contractors except to correct imminent danger
situations.
All potential or actual emission/releases
identified during the course of an evaluation shall be documented and
if found to be in violation of Federal, State, or local environmental
requirements or DOE regulations, rules, or Orders, a report of these
results shall be issued. If unusual delays are met in issuing a
report, the employee and, if appropriate, the employee representative
shall be informed of such delays. A delay of more than 30 calendar
days following the evaluation shall warrant such notification.
b. Report of Results.
II-4 DOE 5480.29
1-15-93
c. Violations of PAAA. Potential violations of PAAA shall be referred
to NS-1 immediately for investigation and action in accordance with
DOE nuclear enforcement policy.