DOE O 5480.28, Natural Phenomena Hazards Mitigation
Functional areas: Environmental Quality & Impact
Canceled by DOE N 251.4 of 9-29-1995.
Superseded By:
DOE N 251.4, Cancellation of Directives on Sep 29, 1995
DOE O 420.1, Facility Safety on Oct 13, 1995
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE N 251.4Cancellation of Directives (Sep 29, 1995)
- DOE O 420.1Facility Safety (Oct 13, 1995)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
U.S. Department of Energy ORDER
Washington, D.C. DOE 5480.28
1-15-93
SUBJECT: NATURAL PHENOMENA HAZARDS MITIGATION
1. PURPOSE. To establish Department of Energy (DOE) policy and
requirements for natural phenomena hazard (NPH) mitigation for DOE
sites and facilities using a graded approach.
2. BACKGROUND.
a. The Department of Energy has been using the requirements of model
building codes (e.g., seismic requirements of the Uniform Building
Code) and National standards (e.g., ASCE 7 - formerly ANSI A58.1
for wind requirements) to mitigate the effects of natural
phenomena hazards. DOE standards, guidance, and practices were
developed and promulgated by DOE 6430.1A through the DOE General
Design Criteria Manual to provide levels of design for: occupant
life safety, reduction in loss of government property, functioning
of essential operations and confinement of hazardous material.
b. The General Design Criteria implemented the policy of DOE Orders
on Environment, Safety, and Health (DOE 5480.1B), Safety Analysis
and Review System (DOE 5481.1B), and promulgated the seismic
guidance of the National Earthquake Hazards Reduction Program
(NEHRP) contained in the Interagency Committee on Seismic Safety
in Construction (ICSSC) reports (RP-1 and RP-3). Recent
evaluations under the NEHRP studies have found that the standards
used by DOE for design and evaluation of buildings to be
"substantially equivalent" to the NEHRP provisions required by the
Executive Order (E.O.) on Seismic Safety (E.O. 12699 dated 1-5-90)
and substantially more conservative for levels of design beyond
those judged acceptable for life safety.
3. POLICY.
a. It is the policy of the Department of Energy to design, construct,
and operate DOE facilities so that workers, the general public,
and the environment are protected from the impacts of natural
phenomena hazards on DOE facilities. DOE NPH mitigation
requirements are consistent with the safety policy and goals of
DOE 5480.1B, DOE 5481.1B, the National Earthquake Hazards
Reduction Program, and Executive Order 12699, for all its
facilities. For nuclear facilities, DOE additionally requires
that, the nuclear safety policy of DOE 5480.23 and Secretary of
Energy Notice (SEN), SEN-35-91, NUCLEAR SAFETY POLICY, of 9-9-91,
be met for NPH mitigation, and that cost effectiveness is
considered. The goals of design, evaluation, and construction for
NPH mitigation Include:
(1) Providing for safe work places;
(2) Protecting against property loss or damage;
(3) Continued operation of essential facilities; and
(4) Protecting public health, property, and the environment
against exposure to hazardous materials.
b. Presently, General Design Criteria for DOE facilities are included
in DOE 6430.1A. This Order (DOE 5480.28) does not supersede DOE
6430.1A. Requirements related to natural phenomena hazards in
Section 2
this Order govern where there are inconsistencies.
4. APPLICATION TO CONTRACTS. The provisions of this Order are to be
4. APPLICATION TO CONTRACTS. The provisions of this Order are to be
applied to covered contractors and they will apply to the extent
implemented under a contract or other agreement. A covered contractor
is a seller of supplies or services involved with the design,
operation, or evaluation of a DOE-owned or leased facility and awarded
a procurement contract, or a subcontract, containing one or more of the
following contract clauses as follows: a. Safety and Health
(Government-Owned or Leased Facility) [DEAR 952.223-71 and 970.5204-2];
b. Nuclear Facility Safety [DEAR 970.5204-26]; c. Radiation
Protection and Nuclear Criticality [DEAR 952.223-72]; or d. Any other
clause whereby DOE elects to enforce health and safety standards.
5. EXCLUSIONS.
a. This Order does not apply to the parts and portions of DOE-owned
or -leased facilities which are licensed by the Nuclear Regulatory
Commission.
b. This Order does not apply to activities of the Naval Nuclear
Propulsion Program which are excluded by Executive Order 12344 and
Public Law 98-525.
c. Except as excluded by paragraph 5b, the provisions of this Order
apply to all DOE sites and facilities.
6. REFERENCES.
a. DOE 6430.1A, GENERAL DESIGN CRITERIA (including NPH), of 4-6-89,
which contains the criteria for design and construction of DOE
facilities.
b. DOE 5480.1B, ENVIRONMENT, SAFETY AND HEALTH (ES&H) PROGRAM FOR DOE
OPERATIONS, of 9-23-86, which contains the requirements and
responsibilities for an ES&H program.
c. DOE 5480.23, NUCLEAR SAFETY ANALYSIS REPORTS, of 4-10-92, which
establishes uniform requirements for the preparation and review of
safety analyses for nuclear facilities.
d. DOE 5481.1B, SAFETY ANALYSIS AND REVIEW SYSTEM, of 9-23-86, which
establishes uniform requirements for the preparation and review of
safety analyses.
e. Executive Order 12344, paragraph 1634.98, and Public Law 98-525,
Stat. 2649, which exempt Naval Nuclear Propulsion applications.
f. Executive Order 12699, "Seismic Safety of Federal and federally
Assisted or Regulated New Building Construction," of 1-5-90.
g. DOE N 5480.5, IMPOSITION OF PROPOSED NUCLEAR SAFETY REQUIREMENTS,
1-22-92, which describes DOE backfit policy.
h. DOE 5483.1A, OCCUPATIONAL SAFETY AND HEALTH PROGRAM FOR DOE
CONTRACTOR EMPLOYEES AT GOVERNMENT-OWNED CONTRACTOR-OPERATED
FACILITIES, of 6-22-83, which establishes requirements and
procedures for occupational safety and health standards for
Department of Energy (DOE) contractor employees in
Government-owned contractor-operated (GOCO) facilities.
i. DOE 1300.2A, DOE TECHNICAL STANDARDS PROGRAM, of 5-19-92, and
associated manuals which provide the procedures for development,
coordination, and approval of DOE standards.
j. DOE Standard (DOE-STD), DOE-STD-1024-92, of 10-92, "Guidelines for
Use of Probabilistic Seismic Hazard curves at DOE Sites,"
(interim).
(interim).
k. DOE-STD-101-92, "Compilation of Nuclear Safety Criteria for
Section 3
potential application to DOE Non-Reactor Nuclear Facilities," of
3-92.
l. Title 10 Code of Federal Regulations (CFR) 600.12, "Financial
Assistance Rules," of 1-2-92.
m. Uniform Building Code, International Conference of Building
Officials, Whittier, California, 1991.
n. Building Officials and Code Administrators International (BOCA),
"National Building Code," 1992 Supplement.
o. Southern Building Code Congress International (SBCCI), "Standard
Building Code," of 1992, amendment.
p. American Society of Civil Engineers (ASCE), ASCE-7, "Minimum
Design Loads for Buildings and Other Structures," of 1988.
q. ICSSC RP-1, "Seismic Design Guidelines for Federal Buildings," of
1987.
r. ICSSC RP-3, "Guidelines for Identification and Mitigation of
Seismically Hazardous Existing Federal Buildings," of 1989.
s. Federal Emergency Management Administration (FEMA) FEMA-93,
"Federal Guidelines for Dam Safety," of 6-79.
t. "Design and Evaluation Guidelines for Department of Energy
Facilities Subjected to Natural Phenomena Hazards," Lawrence
Livermore National Laboratory Report, UCRL-15910, of 6-90, which
provides criteria for earthquake, wind, and flood design
protection.
7. DEFINITIONS.
a. Additions and Modifications are changes to a structure, system,
and component (SSC) for reasons other than increasing resistance
to natural phenomena hazards.
b. Dams are as defined in FEMA 93/June 1979, "Federal Guidelines for
Dam Safety."
c. Deterministic Method is the technique in which a single estimate
of parameters is used to perform each analysis. To account for
uncertainty, several analyses may be conducted with different
parameters.
d. Electrical Transmission and Distribution Systems include
transmission lines, substation SSCs, and control and communication
SSCs.
e. Facility is one or more building(s) or structure(s), including
systems and components, dedicated to a common function (includes
operating and non-operating facilities and facilities slated for
decontamination and decommissioning).
f. Function is the capability of structures, systems, and components
to perform their intended mission. Maintaining function after NPH
occurrence is required by this Order for SSCs important to safety,
and to minimize property losses based on cost benefit
considerations. Maintaining function such that programmatic
objectives are achieved is not required by this Order but is
commonly a goal for NPH design and evaluation.
g. Graded Approach is one in which SSCs are placed into performance
categories such that the required level of analysis,
documentation, and actions are commensurate with:
(1) The relative importance to safety, safeguards, the
environment, and security;
(2) The expected magnitude of any hazard involved;
(3) The programmatic mission of a facility;
(4) The particular characteristic of the SSCs; and
(5) The cost and replaceability of the SSCs.
h. Model Building Codes contain design and construction requirements
Section 4
that apply to normal commercial buildings (e.g., 1991 ICBO Uniform
Building Code [UBC], the 1992 Supplement to the BOCA National
Building Code, and the 1992 Amendments to the SBCCI Standard
Building Code).
i. Natural Phenomena Hazard (NPH) is an act of nature (for example:
earthquake, wind, hurricane, tornado, flood, precipitation (rain
or snow), volcanic eruption, lightning strike, or extreme cold or
heat) which poses a threat or danger to workers, the public, or to
the environment by potential damage to structures, systems, and
components (SSCs).
j. NPH Mitigation is an action taken to reduce the impacts of Natural
Phenomena Hazards (NPH). This includes natural phenomena hazard
resistant design, evaluation, construction requirements, and
operational procedures.
k. Nuclear Safety is the area of safety that encompasses activities
and systems that present the potential for uncontrolled releases
of fission products or other radioactive materials to the
environment or for nuclear criticality.
l. Performance Category (PC) is a classification using a graded
approach in which structures, systems, or components in a category
are designed to assure similar levels of protection (i.e., meet
the same performance goal) during natural phenomena hazard events
(see paragraph 12, Table 1).
m. Performance Goal is the mean annual probability of exceedance of
acceptable behavior limits used as a target to develop natural
phenomena hazard mitigation requirements (see paragraph 12, Table
1).
n. Probabilistic Method is a technique which uses distributions of
parameters (including uncertainty and randomness) to perform an
analysis. Results are expressed in terms of probabilistic
distributions which quantify uncertainty.
o. Risk is the frequency of possible adverse consequences (loss). In
the context of natural phenomena hazard (NPH) evaluation, this is
the quantitative or qualitative expression of possible loss that
considers the probability that a NPH occurs, the probability that
the NPH occurrence will result in consequences, and the nature of
the consequences.
p. Safety Analysis Report (SAR) is a report which documents the
adequacy of safety analysis to ensure that a facility can be
constructed, operated, maintained, shut down, and decommissioned
safely and in compliance with applicable laws and standards.
safely and in compliance with applicable laws and standards.
q. Site is the area with one or more DOE facilities or activities
that can be represented by the same natural phenomena hazard
potential with local conditions that can be represented by the
same parameters.
r. Structures, Systems, and Components (SSCs).
(1) Structure is an element, or a collection of elements to
provide support or enclosure such as a building, free
standing tank, basins, dikes, or stacks.
(2) System is a collection of components assembled to perform a
function such as piping, cable trays, conduits, or HVAC.
Section 5
(3) Component is an item of equipment such as a pump, valve, or
relay, or an element of a larger array such as a length of
pipe, elbow, or reducer.
s. Upgrade is a design and construction measure taken to increase the
resistance of structures, systems, and components for the effects
of natural phenomena hazards. Upgrade, strengthening, and
retrofit are equivalent terms.
8. RESPONSIBILITIES AND AUTHORITIES.
a. The Secretary of Energy (S-1). Many provisions in this Order
permit and/or necessitate the exercise of discretion and/or
judgment in carrying out the requirements of the Order. In those
instances, the determination of whether, in the exercise of such
discretion and/or judgment, the requirements of this Order were
complied with rests initially with the relevant Department
authority and ultimately, with the Secretary. The Secretary
retains the sole and final authority to determine what acts are
necessary to comply with this Order. Further, the Secretary
retains the authority to suspend any and all requirements under
this Order whenever the Secretary deems it necessary. This
authority may be delegated by the Secretary as appropriate.
b. Assistant Secretary for Nuclear Energy (NE-1) has overall
responsibility for establishing nuclear facility safety policy and
implementing guidance. The Assistant Secretary shall:
(1) Develop, promulgate, and maintain the policy, requirements,
guidance, and technical standards, and provide advice and
assistance, as requested, concerning implementation of
nuclear safety policy as it relates to natural phenomena
hazards at nuclear facilities; and
(2) Exercise concurrence authority on requests for permanent
exemptions from nuclear safety requirements in this Order
related to natural phenomena hazards and NPH evaluations at
DOE facilities.
(3) Develop and update the Manual of Responsibilities as
required.
c. Assistant Secretary for Environment, Safety and Health (EH-1) acts
as the Department's independent element responsible for safety
oversight of functional areas encompassing natural phenomena
hazards; environmental protection; occupational safety and health;
radiological protection directives and standards; and all
activities, systems, or processes that present the potential for
uncontrolled releases of non-radioactive hazardous material to the
environment. As part of this oversight responsibility in these EH
functional areas, EH-1 shall:
functional areas, EH-1 shall:
(1) Monitor and review the implementation of all aspects of this
Order, including field organization and contractor
performance;
(2) Review or designate responsibility for the review of
documentation such as Technical Safety Appraisals, Safety
Analyses, Hazard Evaluations, Safety Analysis Reports,
implementation schedules and program office and site office
reports and observe on-site activities;
Section 6
(3) Identify circumstances that are indicative of deteriorating
or poor performance that may warrant further action;
(4) Exercise concurrence authority on requests for permanent
exemptions from the requirements of this Order.
d. Director of Nuclear Safety (NS-1). The Office of Nuclear Safety
(NS) reports directly to the Secretary and advises the Secretary
on whether line management is adequately achieving nuclear safety.
NS has broad responsibilities to monitor and provide oversight of
the nuclear safety programs and performance of DOE line and
contractor organizations. NS may execute these responsibilities
through review of documentation such as Safety Analysis Reports
and program office and site reports, as well as through direct
observation and assessment of on-site activities. NS is
responsible for identifying to the Secretary any circumstances
indicative of deteriorating or poor performance that may warrant
further in-depth appraisals to identify and fix fundamental
problems. NS reviews and exercises concurrence authority on
nuclear reactor and non-reactor nuclear facility safety policies
and requests for permanent exemptions thereto. It is also
responsible for the enforcement policy and programs associated
with the civil and criminal authorities of the Price-Anderson
Amendments Act. In execution of these broad responsibilities, NS
is expected to provide a bridge with DOE operations and commercial
industry practices.
e. Program Secretarial Officers (PSOs) or their designees in the line
organization for matters affecting facilities under their
programmatic responsibility shall:
(1) Require that contractors/operators design and evaluate
structures, systems, and components, and conduct NPH site
characterization and assessment in accordance with the
provisions of this Order. For nuclear facilities, the NPH
evaluation for a facility does not have to be a stand alone
document but may be included in the Safety Analysis Report
for the facility, prepared in accordance with DOE 5480.23.
(2) Verify that the safety analysis establishes an adequate NPH
safety basis and evaluates the adequacy of the NPH mitigation
features of the facility in accordance with the provisions of
this Order.
(3) Approve deviations and temporary (up to one year) exemptions
from the requirements of this Order to contractors/operators
for all new facilities and those existing facilities
evaluated and/or upgraded as determined by the PSO. Notify
appropriate Headquarters-level offices of all temporary
exemptions granted.
(4) Recommend permanent exemptions from requirements of this
Order to the Secretary after concurrence by the Assistant
Secretary, Nuclear Energy; the Assistant Secretary,
Secretary, Nuclear Energy; the Assistant Secretary,
Environment, Safety, and Health; and the Director of Nuclear
Safety, as appropriate according to their responsibilities
Section 7
for all new facilities and those existing facilities
evaluated and/or upgraded as determined by the PSO.
(5) Issue the permanent exemptions approved by the Secretary.
(6) Provide guidance and assistance to field organizations in the
performance of NPH reviews, prioritization, appraisals, etc.,
to assure contractor compliance with the provisions of this
Order.
(7) Conduct appraisals of field and/or contractor organizations
to assure contractor compliance with this Order.
(8) Transmit the results of the actions taken above to the
responsible program managers and field organizations with any
necessary or appropriate instructions as to subsequent action
to be taken, with copies to the Office of Nuclear Safety and
the Assistant Secretary for Environment, Safety, and Health,
depending on the nature of the issue being addressed.
(9) Review and approve implementation plans for the NPH
evaluation and upgrade of existing facilities.
f. DOE Field Office Managers and Field Program Managers shall:
(1) Review and make recommendations to the PSO relative to the
approval of all NPH evaluations.
(2) Oversee contractor/operator planning, preparation, and review
of safety analyses and evaluations of NPH mitigation features
as directed by the PSO.
(3) Conduct appraisals to assure contractor compliance with this
Order.
(4) Keep appropriate Headquarters program organizations, the
Director of Nuclear Safety (NS-1), the Assistant Secretary
for Environment, Safety, and Health (EH-1), and the field and
area offices advised of NPH issues, deficiencies, needs, and
actions taken under this Order.
g. Heads of Departmental Elements (the senior ranking DOE official at
a DOE office location) shall include in a procurement request
package, for each procurement requiring the application of this
Order, the following: (1) Identification of the Order; (2)
Identification of the specific requirements with which a
contractor or other awardee is to comply, or, if this is not
practicable, identification of the specific paragraphs or other
portions of this Order with which a contractor or other awardee is
to comply; and (3) Requirements for the flowdown of provisions of
this Order to any subcontract or subaward. For application to
awarded management and operating contracts, Heads of Department
Elements may set forth this information in a written communication
to the contracting officer rather than in a procurement request
package. See 10 CFR 600.12 where DOE provides financial
assistance.
h. Director, Naval Nuclear Propulsion Program. Presidential
Executive Order 12344, statutorily prescribed by Pub. L. 98-525,
42 U.S.C. Subsection 7158 note (1984), establishes the
responsibilities and authorities of the Director, Naval Nuclear
Propulsion Program (who is also the Deputy Assistant Secretary for
Naval Reactors within the Department) over all facilities and
Section 8
activities which comprise the Program, a join Navy-DOE
activities which comprise the Program, a join Navy-DOE
organization. These executive and legislative actions establish
that the Director is responsible for all matters pertaining to
naval nuclear propulsion for all Program facilities and
activities. Accordingly, the provisions of this Order do not
apply to the Naval Nuclear Propulsion Program.
9. EXEMPTIONS/DEVIATIONS. Nothing in this Order shall preempt the
specific requirements contained in other DOE directives relative to
their processes and procedures for requesting exemptions and
deviations. Exemptions and deviations must be documented in writing
and must include an adequate basis justifying the action.
a. Exemptions. Review and concurrence by Headquarters-level offices
as specified in paragraph 9 are required for exemptions from the
requirements of this Order. PSOs may grant temporary exemptions
from this Order with notification of appropriate
Headquarters-level offices. Temporary exemptions may be granted
for durations up to one year, while permanent exemptions apply for
the life of a facility. The exemption process is invoked when any
of the following apply:
(1) Exceptions proposed for structures, systems, and components
important to safety; when such exception will or may
constitute an adverse impact on environmental protection,
safety or health or other DOE design policies or objectives.
(2) Exceptions from requirements in Federal laws or regulations
or Executive Orders; such exceptions cannot be approved
unless such laws, regulations, or Executive Orders provide
for deviations or waivers.
b. Deviations. Deviations may be granted by the PSO responsible for
facility design and/or evaluation when any of the following apply:
(1) It has been demonstrated that the deviation is equivalent to,
or more conservative than, the requirements such that the
risk to the health and safety of the public and workers is
not affected by the deviation.
(2) A specific portion of the NPH requirements are determined to
be inadequate or inappropriate for the facility under
consideration.
(3) Deviations are necessary or advantageous in the design/
evaluation professional's judgment.
(4) A NPH requirement affecting environmental protection or
health and safety is less stringent than local or State codes
or regulations.
(5) Deviations will not affect DOE policy and objectives and are
determined to be necessary in the acquisition of buildings by
lease or purchase (see E.O. 12699).
(6) Deviations will not affect DOE policy and objectives, are
necessary, and are allowable under existing exemption
provisions of another DOE directive.
10. REQUIREMENTS. The requirements provided in this Order shall be used in
conjunction with the General Design Criteria in DOE 6430.1A and other
Departmental Design Criteria as applicable.
a. Design and Evaluation.
Section 9
(1) General. Structures, systems, and components (SSCs) shall be
(1) General. Structures, systems, and components (SSCs) shall be
designed and constructed to withstand the effects of natural
phenomena hazards. An objective for all SSCs is to prevent
loss of structural integrity endangering life safety. An
additional objective for selected SSCs or site activities is
to prevent loss of capability to perform functions consistent
with: (1) importance to safety for workers and the public;
(2) impact on the environment; (3) repair/replacement costs;
or (4) programmatic mission. NPH design and evaluation
criteria for SSCs for earthquake, wind, and flood shall be
used for DOE laboratories reservations, and production
facilities. UCRL-15910 shall be used until a DOE standard is
issued. It is the intent of this Order to conform to and/or
use national consensus codes and standards wherever
practicable. Thus, where appropriate DOE criteria and
standards are not available (e.g., for electrical
transmission and distribution systems or dams) or for other
DOE facilities, applicable National, Federal, or industry
consensus codes, standards, manuals of practice, or model
building codes shall be deemed acceptable to meet the intent
of this Order.
(2) Design of New Facilities. SSCs shall be designed to be in
compliance with paragraph 10a(1).
(3) Design of Additions and Modifications. Additions and
modifications shall not degrade the safety or function of the
existing SSCs to the extent that performance goals cannot be
achieved. Additions and modifications to existing SSCs shall
be designed and constructed to comply with paragraph 10a(1).
(4) Evaluation and Upgrade of Existing DOE Facilities.
(a) SSCs shall be reevaluated in accordance with the
requirements of paragraph 10a(1) under the following
circumstances:
1 The SSC was designed and constructed without
adequate NPH design and construction standards.
2 The function of the SSC has changed to a
performance category with more stringent NPH
requirements such as when the SSC is identified as
important to safety through upgrades to the
facility SAR.
3 There has been a significant change in
understanding that results in an increase in the
site NPH hazard.
4 When a SSC has been subjected to an unresolved
safety question and requires evaluation.
5 A significant physical change in the SSC has been
caused by an addition, a modification,
deterioration, or a damaging NPH event.
(b) The contractor/operator shall establish an
implementation plan for evaluating and upgrading
Section 10
existing SSCs. The plan should identify current and
future NPH mitigation actions for existing SSCs by
facility. The plan should incorporate a prioritized
schedule for evaluation of existing SSCs because it is
recognized that there are time and funding constraints
and programmatic mission considerations.
(c) The implementation plan for evaluation and upgrade of
(c) The implementation plan for evaluation and upgrade of
SSCs shall be consistent with ICSSC RP-3 and meet the
provisions thereof, as a minimum. As indicated in E.O.
12699, it is the intent of the Federal Government to
ensure that new Federal buildings provide life safety
and prevent property loss in the event of a seismic
event. A similar effort is underway for lifelines. By
extension of E.O. 12699, DOE includes other NPHs in this
goal. In the National Earthquake Hazards Reduction
Program (NEHRP) Reauthorization Act (Public Law
101-614), the President must adopt, not later than
December 1, 1994, standards for assessing and enhancing
the seismic safety of existing buildings constructed for
or leased by the Federal Government that were designed
and constructed without adequate seismic design and
construction standards. The intent of the implementing
committee, the Interagency Committee on Seismic Safety
in Construction (ICSSC), is illustrated in ICSSC RP-3.
The detailed requirements for evaluation and upgrade of
SSCs for life safety considerations will be consistent
with the final consensus standards from this committee.
(d) Retrofit of existing DOE facilities for NPH effects
shall be conducted in accordance with DOE backfit
policy, DOE N 5480.5.
(5) Interaction. Potential damage and failure of SSCs due to
both direct NPH effects and NPH response of adjacent SSCs
(interaction) shall be considered. Examples of interaction
include: (1) failure of a SSC belonging to a less stringent
performance category which falls on an SSC important to
safety or mission; (2) impact damage due to displacements of
adjacent SSCs; (3) displacements of adjacent SSCs resulting
in failure of connecting pipes or cables; (4) SSCs whose
failure could hinder necessary operator actions following NPH
events such as lighting and communication systems, and access
hallways and doors; (5) flooding and exposure to fluids from
vessels or piping systems ruptured during a NPH event; (6)
offsite NPH effects on the facility such as loss of offsite
power and failure of upstream dams and reservoirs; and (7)
effects of NPH-induced fires.
(6) Common Cause Effects. The occurrence of a NPH event,
especially earthquake, affects many or all SSCs in a
Section 11
facility. Hence, it is possible to have multiple NPH-induced
failures of SSCs. These common cause effects must be
considered in design or evaluation. For example, multiple
failures in a tank farm can result in loss of contents
greater than that held in any single tank. The effects of
this large quantity of tank contents on SSCs must be
considered.
b. Graded Approach.
(1) Paragraph 10a(1) shall be satisfied using a graded approach.
The graded approach is implemented by the 5 performance
categories (paragraph 12, Table 1) established for SSCs on
the basis of their safety, mission, and cost significance as
per applicable DOE standards.
(2) Each performance category has been assigned a performance
goal with a mean annual probability of exceedance of
acceptable behavior limits (paragraph 12, Table 1). The
performance goal is a measure of the level of NPH protection
and is used as a target for the establishment of NPH
mitigation requirements.
mitigation requirements.
(3) For each performance category, NPH design, evaluation, and
construction requirements of varying conservatism and rigor
corresponding to the target performance goal have been
established.
c. Assessment of Natural Phenomena Hazards. Natural phenomena hazard
design and evaluation requirements given in this Order require a
probabilistic assessment of the likelihood of future NPH
occurrence. The level of probabilistic natural phenomena hazard
assessment to be conducted will be appropriate for the performance
categories being considered in a manner consistent with the graded
approach. For sites containing facilities with SSCs in
Performance Categories 3 and 4, a site-specific probabilistic
natural phenomena hazard assessment shall be conducted in
accordance with the applicable DOE standard. For sites containing
facilities with SSCs in only Performance Categories 1 and 2 and
which have no site-specific probabilistic NPH assessment, it is
sufficient to utilize natural phenomena hazard maps from model
building codes or national consensus standards. For sites which
have site-specific probabilistic NPH assessments, the SSCs in
Categories 1 and 2 shall be evaluated or designed for the greater
of the site specific values or the model code values unless site
specific values are lower and can be justified.
(1) New Sites.
(a) Assessment. For a new site, containing SSCs in
Performance Categories 3 and 4 which have performance
goals more stringent than that provided by model
building code provisions, a site-specific probabilistic
natural phenomena hazard assessment shall be conducted
in accordance with the applicable DOE standard. This
NPH assessment shall include adequate site-specific
information.
(b) Siting. Site planning must consider all consequences of
Section 12
natural phenomena hazards. For example, seismicity,
geological hazards, and soil failure hazards must all be
considered. Siting of structures over active geologic
faults, in areas of instability subject to landslides,
or where soil liquefaction is likely to occur should be
avoided. In addition, structures shall not be sited
within flood plains where flood water depth and other
flood effects at an annual probability of exceedance
equal to or greater than the performance goal can
adversely affect structure performance unless structure
protection is provided (e.g., levees, or dikes).
Special attention shall be given to sites potentially
subject to flooding from upstream dams or reservoirs
including earthquake caused failures.
(2) Existing Sites. For an existing site, if there are
significant changes in natural phenomena hazard assessment
state-of-the-art or site-specific information, the
probabilistic natural phenomena hazard assessments shall be
updated. If SSCs of Performance Categories 3 and 4 are
constructed or installed at an existing site which previously
only had Performance Category 1 and 2 SSCs and/or which did
not have a site-specific probabilistic NPH assessment, a
probabilistic site-specific natural phenomena hazard
assessment shall be performed. A review of the
state-of-the-art of natural phenomena hazard assessment
methodology and of site-specific information shall be
conducted at least every 10 years. A recommendation shall be
conducted at least every 10 years. A recommendation shall be
made to the PSOs on the need for updating the existing NPH
assessments based on identification of a significant change.
(3) Natural phenomena effects. Natural phenomena hazard
assessments and NPH design of new facilities and evaluation
of existing facilities shall consider all potentially
damaging natural phenomena and their effects. For example,
all effects of earthquakes including earthquake ground
shaking and earthquake-induced fault offset, liquefaction,
slope instability, lateral spreading, and subsidence; all
effects of tornadoes including wind pressure, tornado-
generated missiles, and atmospheric pressure change; or all
effects of flooding including water depth, local
precipitation, dynamic impact of water, erosion, and impact
of floating debris shall be considered. Simultaneous
occurrence of most NPH events need not be assumed. However,
where events have a cause and effect relationship, their
combination must be considered as per paragraph 10a(1).
d. Other Requirements.
(1) NPH Detection. Facilities or sites which have SSCs in PC 2
(with hazardous material), PC 3 or PC 4 shall have
instrumentation or other means to detect and record the
Section 13
occurrence and severity of seismic events.
(2) Post-NPH Procedures. Facilities or sites which have SSCs in
PC 3 or PC 4 shall have procedures to inspect the Facility
for damage following an NPH event, to place the facility into
a safe configuration when damage occurs, and to document and
report such damage.
11. IMPLEMENTATION.
a. Steps Necessary to Implement NPH Mitigation Requirements (given in
paragraph 10):
(1) Perform site-specific studies of site characteristics or
evaluate existing data for site characteristics related to
NPH and augment with site-specific studies where needed in
accordance with the latest applicable DOE standard.
(2) Establish performance categories for SSCs using a graded
approach. Performance categorization of SSCs shall be
performed in accordance with the latest applicable DOE
standard. Performance categories and associated performance
goals are discussed in paragraph 12.
(3) Perform natural phenomena hazard assessment of the site in
accordance with the applicable DOE standard. Guidelines for
use of existing probabilistic seismic hazard curves are
contained in DOE-STD-1024-92.
(4) Design and construct or evaluate SSCs. Specified annual
probabilities of exceedance for natural phenomena hazards to
establish loadings, deterministic design methods for response
evaluation, permissible response levels, load combination
rules, design detailing requirements, and quality assurance
and independent peer review requirements are provided in the
latest applicable DOE standards. These standards provide
sufficient documentation to: 1) communicate the process,
rationale, and results of the NPH evaluation; 2) present
information that can be evaluated during peer reviews; and 3)
provide traceability and a basis for future assessments.
Provisions for seismic design and evaluation of high-level
waste storage tanks and related SSCs may be obtained from
waste storage tanks and related SSCs may be obtained from
EM-30.
(5) Establish a prioritized schedule for evaluation and upgrade
of existing facilities. A prioritization program will direct
initial efforts to facilities which are of greatest
importance in terms of safety, mission, and cost in
accordance with DOE N 5480.5. A screening program will
enable relatively rapid initial evaluations to be conducted
such that areas of greatest vulnerability to NPH effects can
be identified and addressed. Areas where SSCs might not be
vulnerable to NPH effects due to inherent ruggedness or
benign site conditions can be identified and eliminated from
further consideration.
b. The intent of this Order is to rely on Federal, National, and
industry consensus codes and standards which are adapted, where
needed, for DOE use. For example, DOE is currently developing a
Section 14
Natural Phenomena Hazards Design and Evaluation Criteria Standard
which adapts provisions from consensus national standards, model
building codes, and industry accepted codes and specifications.
c. The Attachment to this Order provides the list of applicable
standards under preparation.
d. Schedule for implementation of this Order.
(1) New Sites. The Order becomes immediately in force at the
effective date of the latest applicable standard.
(2) Existing Sites. The Order becomes immediately in force at
the effective date of the latest applicable standard.
Required actions depend on the status of site
characterization and NPH assessment for the site and
application of the backfit policy.
(3) New SSCs. The Order becomes immediately in force at the
effective date of the latest applicable standard.
(4) Existing SSCs. The Order becomes immediately in force at the
effective date of the last applicable standard. The
implementation plan for evaluation and upgrade of existing
SSCs (see paragraph 11a(5)) shall be completed and submitted
to the PSO within 1 year of the effective date of the last
applicable standard.
12. PERFORMANCE GOALS AND PERFORMANCE CATEGORIES.
a. Structures, systems, and components comprising DOE facilities are
assigned to one of five performance categories (PCs) in accordance
with performance categorization criteria given in the applicable
DOE standard. Each performance category has an assigned
performance goal as shown in Table 1. Goals and corresponding
performance categories should be selected by engineers with
knowledge of systems, safety requirements, and facility operations
in a manner that DOE safety policies are met. Economic or
programmatic considerations may require use of more stringent
goals for specific SSCs (i.e., placed in a higher performance
category).
Table 1 - Performance Goals for SSCs
|=============================|=======|========|========|========|========|
| Performance Category | 0 | 1 | 2 | 3 | 4 |
|-----------------------------|-------|--------|--------|--------|--------|
| Performance Goal | | | | | |
| Performance Goal | | | | | |
| (mean annual probability of | N/A | 1x10-3 | 5x10-4 | 1x10-4 | 1x10-5 |
| exceedance of acceptable | | | | | |
| behavior limits | | | | | |
|=============================|=======|========|========|========|========|
b. The performance goal annual probabilities of unacceptable damage
given in Table 1 have been prescribed to be substantially
equivalent with (1) the goals of model building code provisions
for SSCs in PC 1 and PC 2 and, (2) the goals intended by nuclear
power plant seismic criteria for SSCs in PC 4. The relative
probabilities and consequences of potential damage or failure of
SSCs making up DOE facilities are accounted for by providing
Section 15
several sets of NPH design/evaluation provisions with increasing
conservatism (i.e., producing decrease in probability of damage or
failure). This graded approach provides a different level of NPH
provisions for each performance category, as described below:
(1) PC 0 has provisions in which no consideration of natural
phenomena is necessary, i.e., where natural phenomena hazards
are not an issue;
(2) PC 1 and 2 have NPH provisions consistent with model building
codes, where assurance of life safety for on-site personnel
or continuity of essential operations is an issue of
importance. For PC 1 SSCs, the primary concern is preventing
major structural damage or collapse that would endanger
personnel. A performance goal annual probability of
exceedance of about 10-3 of the onset of significant SSC
damage is applicable to this category. Repair or replacement
of the SSC or the ability of the SSC to continue to function
after the occurrence of the hazard is not considered. PC 2
SSCs are of greater importance due to mission-dependent
considerations or may pose a greater danger to on-site
personnel than PC 1 SSCs because of operations or hazardous
materials within the SSC. The performance goal is to
maintain capacity to perform essential functions after the
occurrence of an NPH event and to provide occupant safety.
PC 2 SSCs should be allowed relatively minor structural
damage in the event of natural phenomena hazards. This is
damage that results in minimal interruption to facility
operations and that can be easily and readily repaired
following the event. The PC 2 performance goal is consistent
with the design criteria for essential facilities (e.g.,
hospitals, fire and police stations, centers for emergency
operations) in accordance with model building codes.
(3) PC 3 and 4 SSCs pose a potential hazard to worker and public
health and safety and to the environment because radioactive
or toxic materials are present in significant quantities.
Design considerations for these categories are to limit
facility damage so that hazardous materials can be controlled
and confined, occupants are protected, and functioning of the
facility is not interrupted. PC 3 NPH provisions are
consistent with those used for reevaluation of commercial
plutonium facilities with conservatism in between that of
model building code requirements and civilian nuclear power
plant requirements. For PC 3 SSCs, an applicable performance
goal is an annual probability of exceedance of about 10-4 of
damage beyond which hazardous material confinement is
impaired. PC 4 seismic provisions are consistent with that
used for reevaluation or design of civilian nuclear power
plants, where off-site release of hazardous material must be
prevented. For PC 4 SSCs, a reasonable performance goal is
Section 16
an annual probability of exceedance of about 10-5 of damage
beyond which hazardous material confinement is impaired.
This performance goal is consistent with, at least for
This performance goal is consistent with, at least for
earthquake considerations, the performance goal for
seismic-induced core damage associated with design of
commercial nuclear power plants. Annual frequencies of
seismic core damage from published probabilistic risk
assessments (PRA) of recent commercial nuclear plants
indicate that mean seismic core damage frequencies ranged
from 4x10-6/year to 1x10-4/year based on consideration of 12
plants. For 10 of the 12 plants, the annual seismic core
damage frequency was greater than 1x10-5. Hence, the PC 4
performance goal assigned in this Order is consistent with
this information. SSCs can also be placed in PC 3 or PC 4 to
achieve improved performance required by mission objectives
or cost considerations. The Attachment to this Order
provides the list of applicable standards under preparation.
James D. Watkins
Admiral, U.S. Navy (Retired)
DRAFT STANDARDS
Several Draft Standards are currently being prepared, which cover topics
that have previously not been addressed by any DOE Standards. Normally
draft standards are not adopted by DOE directives because, they can be
modified up until they become final. However, since the topics of the
following draft Standards are not covered by suitable alternate standards,
this Order will invoke the draft standards as mandatory when they become
final. These draft standards are:
(1) DOE-STD-1020-92, "Natural Phenomena Hazards Design and Evaluation
Criteria for Department of Energy Facilities," (draft) which is a
revised version of UCRL-15910.
(2) DOE-STD-1021-92, "Natural Phenomena Hazards Performance
Categorization Criteria for Structures, Systems, and Components,"
(draft).
(3) DOE-STD-1022-92, "Natural Phenomena Hazards Site Characterization
Criteria," (draft).
(4) DOE-STD-1023-92, "Natural Phenomena Hazards Assessment Criteria,"
(draft).
The initial implementation requirements of this order are not scheduled to
be completed before the draft standards become final. If due to unforeseen
events, the finalization of the draft standards are delayed, then the final
implementation schedule of this Order may be set back by the PSO. During
the interim period, between the time this Order is issued and the draft
standards become final, these draft standards should be viewed as guidance
for the final implementation of the Order.