DOE O 452.2E, Nuclear Explosive Safety
Functional areas: Safety, Security
This Department of Energy (DOE) Order establishes requirements to implement the nuclear explosive safety (NES) elements of DOE O 452.1E, Nuclear Explosive and Weapon Surety Program, or successor directive, for routine and planned nuclear explosive operations (NEOs). Supersedes DOE O 452.2D and DOE M 452.2-1A.
Supersedes:
DOE O 452.2D Admin Chg 1, Nuclear Explosive Safety on Jan 26, 2015
DOE M 452.2-1A Admin Chg 1, Nuclear Explosive Safety Manual on Jan 26, 2015
Superseded By:
DOE O 452.2F, Nuclear Explosive Safety on Jul 27, 2020
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE O 452.2FNuclear Explosive Safety (Jul 27, 2020)
Supersedes
Earlier documents this one replaced.
- DOE O 452.2D Admin Chg 1Nuclear Explosive Safety (Jan 26, 2015)
- DOE M 452.2-1A Admin Chg 1Nuclear Explosive Safety Manual (Jan 26, 2015)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
U.S. Department of Energy ORDER
Washington, D.C.
DOE O 452.2E
Approved: 1-26-2015
SUBJECT: NUCLEAR EXPLOSIVE SAFETY
1. PURPOSE. This Department of Energy (DOE) Order establishes requirements to
implement the nuclear explosive safety (NES) elements of DOE O 452.1D, Nuclear
Explosive and Weapon Surety Program, or successor directive, for routine and planned
nuclear explosive operations (NEOs).
2. CANCELLATION. DOE O 452.2D, Nuclear Explosive Safety, dated 4-14-09 and DOE
M 452.2-1A, Nuclear Explosive Safety Manual, dated 4-14-09. Cancellation of a
directive does not, by itself, modify or otherwise affect any contractual obligation to
comply with the directive. Contractor requirements documents (CRDs) that have been
incorporated into or attached to a contract remain in effect until the contract is modified
to either eliminate requirements that are no longer applicable or substitute a new set of
requirements.
3. APPLICABILITY.
a. Departmental Elements. This Order applies to NNSA which is the only
Departmental element that is involved in performing, managing, overseeing, and
directly supporting NEOs and associated activities.
The NNSA Administrator will ensure that NNSA employees comply with their
respective responsibilities under this directive. Nothing in this Order will be
construed to interfere with the NNSA Administrator’s authority under section
3212(d) of Public Law (P.L.) 106-65 to establish Administration-specific policies,
unless disapproved by the Secretary.
b. DOE Contractors.
(1) Except for the exclusions in paragraph 3c, the Contractor Requirements
Document (CRD), Attachment 1, sets forth requirements of this Order that
will apply to contracts that include the CRD.
(2) This CRD must be included in all contracts that involve performing,
managing, overseeing, or directly supporting NEOs or associated
activities.
(3) Attachments 2 through 5 apply to federal employees and contractors.
These attachments must be included along with the CRD in all contracts
that involve performing, managing, overseeing, or directly supporting
NEOs or associated activities.
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov National Nuclear Security Administration
http://www.directives.doe.gov/
2 DOE O 452.2E
1-26-2015
(4) NNSA Field Element managers are responsible for notifying contracting
officers of which contracts are affected. Once notified, contracting officers
are responsible for incorporating the CRD and Attachments 2 through 5
into each affected contract.
c. Exclusions.
(1) This Order does not apply to unscheduled events such as accidents
requiring Accident Response Group action. DOE O 151.1C,
Comprehensive Emergency Management, dated 11-02-05, addresses
emergency NES occurrences. The senior energy official, or higher
authority, will determine when to transition from emergency management
directives to this Order.
(2) In accordance with the responsibilities and authorities assigned by
Executive Order 12344, codified at 50 U.S.C. sections 2406 and 2511 and
to ensure consistency through the joint Navy/DOE Naval Nuclear
Propulsion Program, the Deputy Administrator for Naval Reactors
(Director) will implement and oversee requirements and practices
pertaining to this Directive for activities under the Director's cognizance,
as deemed appropriate.
4. REQUIREMENTS
a. Nuclear Explosive Safety Program. NEOs require special consideration because
Section 2
of the potentially unacceptable consequences of an accident or unauthorized act.
The NES program outlined in this section supports the requirement that NEOs
must be designed and conducted in a manner that meets the NES Standards of
DOE O 452.1D or successor directive. It includes the following: NES Rules
(NESRs, general and supplemental), formal NES evaluations, fundamental NEO
process requirements (procedures, facilities, equipment, and people),
requirements for onsite and offsite transportation (mobile NEOs), sustaining
requirements (positive verification, change control and configuration
management), requirements for nuclear explosive-like assemblies (NELAs), and
permanent marking of nuclear explosives and NELAs.
(1) General Nuclear Explosive Safety Rules (NESRs). The general NESRs set
forth in this paragraph are mandatory for all NEOs.
(a) Nuclear Explosive Safety Evaluation. NEOs must not be
performed until a NES evaluation has been completed and
findings for which a NES standard has not been met have been
closed.
(b) Nuclear Explosive Operating Procedures. NEOs must be
performed in accordance with approved written procedures.
3 DOE O 452.2E
1-26-2015
(c) One-Point Safety.
1 Tooling and equipment must be evaluated to ensure that
their use does not cause a one-point safety violation of a
nuclear explosive certified to be one-point safe.
2 If it is determined that a nuclear explosive no longer meets
the one-point safety criteria, all assembly/disassembly
production plant operations (including onsite
transportation) and offsite transportation with that nuclear
explosive must be discontinued in a safe manner. Before
operations with that nuclear explosive can be resumed, a
path forward must be developed, a NES evaluation must be
completed and findings for which a NES standard has not
been met must be closed.
3 NEOs involving a nuclear explosive not certified to be one-
point safe must be conducted at the Nevada National
Security Site (NNSS), except as authorized in accordance
with paragraph 4a(1)(c)2, above.
(d) Nuclear Explosive Areas (NEAs).
1 Energy sources must be identified and documented.
Unauthorized energy sources must not be available in an
NEA during NEOs.
2 Ignition sources in NEAs must be identified and either (1)
eliminated or (2) minimized and controlled to prevent
adverse interaction with combustible/flammable materials
and the nuclear explosive.
3 Combustible and flammable materials in NEAs must be
identified and either (1) eliminated or (2) minimized and
controlled to prevent adverse interaction with the nuclear
explosive.
(e) Electrical Testing. Except as authorized in paragraph 4a(1)(f),
Anomalous Units, nuclear explosives must not be subjected to—
1 redundant electrical tests or
2 electrical troubleshooting (i.e., to confirm the existence of a
fault or aid in fault isolation) except with authorized test
equipment and procedures that have been subjected to a
NES evaluation and found to be acceptable for the specific
application.
4 DOE O 452.2E
1-26-2015
(f) Anomalous Units.
1 If it is determined that a nuclear explosive is no longer in a
condition covered by a NES evaluation, all operations with
that nuclear explosive and in the associated facility must be
discontinued in a safe manner, resulting in a safe and stable
nuclear explosive configuration.
2 Restart of operations on the anomalous unit and other
activities in the affected facility must be in accordance with
Section 3
paragraph 4a(15) below.
(2) Supplemental Nuclear Explosive Safety Rules. Supplemental NESRs may
be developed as needed to support specific tests, operations, or
characteristics of a nuclear explosive.
(3) Nuclear Explosive Safety Evaluations. NES evaluations are required
before a NEO is authorized; periodically for ongoing NEOs; and when
proposed changes or emerging information affect an approved NEO. NES
evaluations must be performed in accordance with NA SD 452.2, Nuclear
Explosive Safety Evaluation Processes, or successor directive.
(4) Human Factors. Newly proposed (startup) NEOs must incorporate human
factors principles into NEO procedures, processes, facility layouts, new
tooling and equipment, including Category 1 electrical equipment, starting
with the NEO design and development phase and maintained throughout
the lifecycle of NEOs. Existing NEOs that are being evaluated (i.e. during
an OSR or NCE) should strive to meet human factors principles to the
extent reasonably achievable.
Organizations developing NEOs must consider the application of
established research in human factors and ergonomics, including human-
system interface design, human cognition and perception, stress and
workload, anthropometry and workspace design, environmental factors,
training, and human error.
(5) Procedures. Written procedures (paper or electronic) control the
interactions among the nuclear explosive, the operating facility,
equipment, and personnel.
(a) Design agencies must review and concur with original issues of
procedures for NEOs and associated activities.
(b) All written procedures for NEOs must place proper emphasis on
preventing accidents and detecting abnormal conditions by
accomplishing the following.
5 DOE O 452.2E
1-26-2015
1 Comply with design specifications and technical
requirements.
2 Clearly state cautions and warnings.
3 Identify appropriate points to interrupt work safely.
4 Include generic contingency procedures directed toward
quickly achieving a safe and stable nuclear explosive
configuration to be applied in response to all unexpected
situations not covered by other written procedures.
(6) Two-Person Concept. Organizations responsible for NEOs and associated
activities and facilities must establish and implement the two-person
concept as specified in Attachment 2 of this Order.
(7) Facilities. Facilities used for nuclear explosive operations must be
characterized, evaluated, and specifically approved for that use as
documented in a 10 CFR 830 compliant documented safety analysis.
If a safety structures, systems, and components (SSC) meets a
performance goal requirement based on DOE–STD-1020 criteria, the SSC
credibly controls the NPH-initiated hazard.
(8) Equipment. Organizations responsible for NEOs and associated activities
and facilities must verify that all equipment used in NEAs (including
tooling, testers, and other mechanical and electrical equipment) meet the
following requirements. Attachment 3 of this Order specifies additional
requirements for electrical equipment used in NEAs.
(a) Design specifications and technical requirements must be
documented.
(b) Designs must ensure nuclear explosives will remain in a safe
condition should a system or component of the tool/equipment fail.
(c) Each item used in an NEO must be specifically approved for that
operation. Unapproved movable items must be excluded from the
NEA. Positive measures must be used to preclude use of facility
Section 4
equipment that is not approved for the NEO and impracticable to
remove.
(d) Equipment intended to apply energy to a nuclear explosive must
incorporate features that limit application of energy to a known
safe level.
(e) Energetic equipment intended for use in NEAs by emergency
responders (e.g., fire department personnel, security force, and
radiological protection) must be evaluated and characterized with
6 DOE O 452.2E
1-26-2015
respect to potential hazards. Training of expected responders and
NEA workers must address emergency situations to help ensure
safety of responders and associated equipment.
(9) Maintenance of Facilities, Tooling, and Other Equipment. Organizations
responsible for NEOs and associated activities and facilities must review
maintenance programs and activities for impact on NES. Maintenance
implementation plans must include a detailed description of maintenance
activity control and approval, including limitations on equipment and
materials that are allowed in NEAs.
(10) Personnel. Each organization responsible for and/or involved in NEOs and
associated activities must implement training, qualification, and
certification programs for personnel that manage, oversee, perform, or
directly support these operations and activities.
In addition to the applicable requirements in 10 CFR Part 712, Human
Reliability Program, and DOE O 426.2, Personnel Selection, Training,
Qualification, and Certification Requirements for DOE Nuclear Facilities,
annual training will be conducted for personnel assigned to nuclear explosive
duty that includes the following NES-specific topics.
(a) Responsibilities associated with custody of nuclear explosives.
(b) Use of general and supplemental NESRs and Immediate Action
Procedures.
(c) Site-/facility-, program-and operation-specific safety requirements.
(d) The purpose, objective, and responsibilities of the two-person
concept for operations.
(e) Explosive safety appropriate for assigned responsibilities.
For site-/facility-, program-, and operation-specific safety requirements,
the annual training requirements under (10)(c) above may be met with
training provided during an initial certification or qualification program
and through a continued recertification or requalification process provided
that the process requires a no less than annual review or demonstration of
the knowledge of the safety requirements.
(11) Transportation of Nuclear Explosives. Nuclear explosive transportation is
a mobile NEO and involves a mobile NEA. Requirements specified for
NEOs and NEAs elsewhere in this directive apply.
(a) Organizations responsible for NEOs and associated activities and
facilities must establish requirements and procedures to ensure safe
onsite transportation of nuclear explosives.
7 DOE O 452.2E
1-26-2015
(b) Offsite transportation of nuclear explosives is performed by the
Office of Secure Transportation (OST) and begins when the loaded
conveyance is closed and ends with the opening of the conveyance
at its destination.
(c) Transportation operations and shipping configurations, including
all items in the conveyance, are subject to the NES evaluation
requirements of paragraph 4a(1)(a) and 4a(3).
1 Nuclear explosives must be transported in conveyances
specifically reviewed through the NES evaluation process.
2 Criteria must be established for protecting nuclear
explosives during transportation. The criteria and restraint
Section 5
designs for specific nuclear explosive configurations must
be reviewed through the NES evaluation process.
(12) Mixed Venues. Nuclear explosives must not be transported or staged with
any other assembly that could be mistaken for a nuclear explosive.
If operational constraints require nuclear explosives and nuclear
explosive-like assemblies (NELAs) to be collocated, the operations must
comply with the NELA standards in paragraph 4.a(17) of this directive
and must be evaluated by a Nuclear Explosive Safety Study Group
(NESSG). The operational justification for collocation of the nuclear
explosives and NELAs will be provided to the NESSG during the
evaluation.
(13) Positive Verification.
(a) Organizations responsible for NEOs and associated activities and
facilities must develop and implement a verification process to
ensure use of qualified personnel who are fit for duty,
operationally ready facilities, correct equipment that is current in
any required calibration and preventive maintenance, and current
approved procedures.
(b) The configuration and condition of a nuclear explosive and its
safety features must be known or determined as early as practical
during any planned NEO.
(14) Change Control. Organizations responsible for NEOs and associated
activities and facilities must establish and implement a NES change
evaluation process in accordance with NA SD 452.2, Nuclear Explosive
Safety Evaluation Processes, or successor directive. This NES evaluation is
separate and independent from the unreviewed safety question process
required by 10 CFR Part 830, Nuclear Safety Management, and must be
completed before approval and implementation of the change.
8 DOE O 452.2E
1-26-2015
All proposed changes to authorized NEOs, including the following, are
subject to the NEO change control process.
(a) Proposals that may have direct NES implications (e.g., procedural,
equipment, or facility changes to an approved NEO).
(b) Proposals that may have indirect NES implications (e.g., changes
or new activities that could impact the foundation established by
previous NES Master Studies).
(c) Changes in knowledge affecting an approved NEO (e.g., new
understanding of a potential threat to NES or new data regarding
the response of a nuclear explosive to a stimulus).
(15) Anomalous Unit Determination and Processing. An anomalous unit might
be created or discovered in the course of NEOs performed by NNSA or its
contractors, or might be received from the Department of Defense (DoD)
in a known anomalous condition.
The OST NEO change control process must ensure anomalous units
accepted for transport are safe to ship and that any special handling,
receiving, or staging requirements are known and accepted in advance by
the receiving organization.
The following apply to anomalous units at the production agency.
(a) The production agency Process Engineer, production agency NES
representative, and design agency System Engineer collectively
have the authority to declare a unit anomalous. If the three cannot
agree that the unit in question is not anomalous, then the unit will
be treated as anomalous. The design agency System Engineer may
solicit input from their respective design agency NESSG
member(s) prior to making an anomalous unit determination.
(b) Before operations with the anomalous unit can be resumed, the
NEO change control process must be completed in accordance
with paragraph 4a(14). A design agency engineering release must
Section 6
be developed as input to the change control process.
1 The responsible design agencies must specifically review
the engineering release for impact on NES. A NESSG-
certified member from the design agency must be involved
in the review. This review must be documented in the
engineering release.
2 Transportation operations, if applicable, must be
specifically addressed in the engineering release. Offsite
9 DOE O 452.2E
1-26-2015
transportation operations are subject to the Office of Secure
Transportation NEO change control process.
(c) A decision to resume other activities in the facility must include
consideration of possible interactions with the anomalous unit.
(d) If additional information is obtained after a unit has been declared
anomalous (e.g. from a radiograph), the new information shall be
evaluated to determine if the unit should remain anomalous.
(16) Configuration Management.
(a) Organizations responsible for NEOs and associated activities and
facilities must develop and implement a configuration management
program incorporating elements applicable to NEOs and associated
activities and facilities.
(b) To ensure consistency with design requirements and the safety
basis, the configuration management program must specifically
include the following:
1 control of the physical configuration of a nuclear explosive
and its components; the tooling, equipment, and procedures
used in NEOs and associated activities; and the interface
with the facilities in which these operations and activities
are conducted;
2 unique identification of special tooling and equipment used
in NEOs;
3 positive identification of tooling and equipment requiring
calibration/testing within a calibration/testing control
program; and
4 incorporation of approved changes into all affected
documents (including design documents, drawings,
procedures, and safety basis documents) and programs
(including maintenance and training).
(17) Nuclear Explosive-Like Assemblies (NELAs).
(a) Nuclear Explosive-Like Assembly Standards. All NELA
operations must meet the following qualitative NELA standards.
1 There must be positive measures to prevent
accidental/inadvertent, or deliberate unauthorized assembly
of a nuclear explosive in place of a NELA configuration.
10 DOE O 452.2E
1-26-2015
2 There must be positive measures to prevent
accidental/inadvertent, or deliberate unauthorized
transfer of a nuclear explosive in place of a NELA
configuration.
In the context of these NELA Standards, the term “prevent” is
applied as described for the Nuclear Explosive Surety Standards in
DOE O 452.1D, or successor directive.
(e) Nuclear Explosive-Like Assembly Requirements. Organizations
responsible for NELA operations must implement the NELA
requirements in Attachment 4 of this directive.
(18) Marking Instructions. Nuclear explosives and NELAs must be marked to
distinguish configurations capable of a nuclear explosive detonation from
those that are not. Organizations responsible for NEOs or NELA
operations must implement the marking requirements in Attachment 5 of
this directive.
b. Independent Oversight. The Associate Administrator for Safety and Health
executes independent oversight of the implementation of this directive and
associated NNSA Supplemental Directives by NNSA personnel. This
oversight may be carried out through execution of NNSA NES evaluations,
independent assessments, or other appropriate mechanisms. On an annual
Section 7
basis, the Office of the Associate Administrator for Safety and Health will
summarize its oversight activities, along with any recommendations for
changes in the NES program in a report to the NNSA Deputy Administrator
for Defense Programs and the Assistant Deputy Administrator for Stockpile
Management. A copy of this report will be provided to the NNSA CTA and
CDNS for information.
c. Exemptions. Exemptions must be requested when release is sought from a
requirement in this directive or successor directives. The exemption process is
outlined in DOE O 251.1C, Departmental Directives Program, dated 1-15-09,
or successor directive. The approval authority is the Deputy Administrator for
Defense Programs with concurrence from the Central Technical Authority.
d. Records. Records (documentation) must be maintained in accordance with
National Archives and Records Administration-approved DOE or site-specific
records retention and disposition schedules in accordance with DOE O 243.1B
Chg 1, Records Management Program, dated 07-08-13.
e. Implementation. This revision does not involve substantive administrative or
programmatic changes from the previous directives, DOE O 452.2D and DOE M
452.2-1A. An implementation plan is not required. This revision is effective upon
issuance.
11 DOE O 452.2E
1-26-2015
5. RESPONSIBILITIES.
a. Deputy Administrator for Defense Programs.
(1) Ensures implementation of NES Programs.
(2) Approves exemptions to this Order.
b. NNSA Field Element Managers responsible for NEOs. Provide oversight of
NNSA M&O Contractors. Provide direction to the contracting officers to ensure
that the CRD and Attachments 2 through 5 of this directive are included in the
appropriate contracts.
c. Associate Administrator for Safety and Health. Provides independent oversight of
the implementation of this Order and associated Supplemental Directives by
NNSA personnel.
d. Director, Office of Nuclear Weapon Stockpile.
(1) Provides federal leadership for project teams formed to develop nuclear
explosive operations at NNSA production agencies.
(2) Ensures that NNSA nuclear explosive operations are designed in a manner
that satisfies the NES Program requirements.
e. Director, Office of Nuclear Weapon Surety and Quality.
(1) Manages the NNSA NES evaluation processes.
(2) Provides support to NNSA Field Element Offices as needed for NES
oversight of the NNSA M&O Contractors.
f. Chair, Nuclear Explosive Safety Study Group
(1) Implements the NNSA NES evaluation processes.
(2) Provides the official interpretation of the NES Standards and other NES
criteria for use by the Nuclear Explosive Safety Study Group during the
performance of NES evaluations per 4.a(3).
6. DEFINITIONS. Definitions from DOE O 452.1E, or successor directive, are not repeated
here.
a. Access. The proximity to a nuclear explosive that allows the opportunity to divert,
steal, tamper with, and/or damage the nuclear explosive in spite of any controls
that have been established to prevent such unauthorized actions.
b. Anomalous Unit. A configuration in a nuclear explosive operation that has any of
the following:
12 DOE O 452.2E
1-26-2015
(1) Damage or other condition not identified as a credible deviation or
otherwise explicitly addressed in an approved technical operating
procedure.
(2) Damage or other condition that results in an unanalyzed configuration or a
configuration not covered by a NES evaluation.
Section 8
(3) Other damage or condition potentially adverse to nuclear explosive safety.
Minor damage or other non-conformances, such as units with scratches, bent
connector pins, chipped insulators, stripped screws, etc., need not be considered
as an anomalous unit unless the condition is potentially adverse to nuclear
explosive safety.
c. Custody of Nuclear Explosives. Responsibility for access to and control of
nuclear explosives.
d. Dummy Pit. A component or set of components designed to simulate a live pit,
but which does not contain fissile material and cannot therefore create a nuclear
explosive if placed in the central cavity of an implosion system. A “high-fidelity”
dummy pit is one that also has dimensions representative of a live pit.
e. Electrical Equipment. Includes items that contain or use an electrical energy
source and the interface (if any) with the nuclear explosive (NE). For Category 1
electrical equipment (as defined in Attachment 3 of this Order), this includes
associated adapters, test cables, switch boxes, etc. For some Category 2 electrical
equipment (as defined in Attachment 3 of this Order), this includes a mechanical
connection to the NE and associated electrical isolation feature. Category 3
electrical equipment does not interface with the nuclear explosive.
f. Facility. Any equipment, structure, system, process, or activity that fulfills a
specific purpose.
g. Human Factors. A scientific discipline that applies knowledge about human
abilities, characteristics, and limitations to design of tasks, equipment, and
environments.
h. Human Reliability Program (HRP). A program established by 10 CFR Part 712 to
ensure that individuals who occupy positions affording access to certain materials,
nuclear explosive devices, facilities, and programs meet the highest standards of
reliability and physical and mental suitability.
i. Main Charge. The high explosive whose explosive energy implodes the pit.
j. Mock High Explosive. A material that is designed to simulate the main charge
high explosive, but which is non-detonable and clear or colored pink.
k. Nuclear Explosive Duty. Work assignments that allow custody of a nuclear
explosive or access to a nuclear explosive device or area.
13 DOE O 452.2E
1-26-2015
l. Nuclear Explosive-Like Assembly (NELA). An assembly that is not a nuclear
explosive but represents a nuclear explosive in its basic configuration (main
charge HE and pit) or any higher level of assembly up to a fully assembled
weapon configuration. A NELA does not contain an arrangement of high
explosive (HE) and fissile material capable of producing a nuclear explosive
detonation.
m. Nuclear Explosive Operation Associated Activities. Activities directly associated
with a specific nuclear explosive operation, such as work on a bomb nose or tail
subassembly, even when physically separated from the bomb’s nuclear explosive
subassembly.
n. Nuclear Explosive Safety Rules (NESRs). Requirements that significantly
contribute to minimizing the possibility of nuclear explosive detonation or high
explosive violent reaction in nuclear explosive operations.
o. One-Point Safe Nuclear Explosive. A nuclear explosive that, in the event a
detonation is initiated at any one point in the high explosive system, presents no
greater probability than one in a million of producing a nuclear explosive yield of
greater than 4 pounds of TNT equivalent.
p. Permanent Marking. A durable method, normally by metal deformation or
Section 9
engraving, indicating on an external area of an assembly whether it is a nuclear
explosive or a nuclear explosive-like assembly.
q. Safety Basis. A safety basis means the documented safety analysis and hazard
controls that provide reasonable assurance that a DOE nuclear facility can be
operated safely in a manner that adequately protects workers, the public, and the
environment..
r. Two-Person Concept (TPC). A concept of operations implemented to ensure no
lone individual has unrestricted access to a nuclear explosive or other crucial asset
as specified by this Order.
7. REFERENCES. The following list contains references that are relevant to this Order.
a. DOE O 151.1C, Comprehensive Emergency Management System, dated 11-2-05,
which addresses responses to unplanned events.
b. DOE O 226.1B, Implementation of Department of Energy Oversight Policy, dated
04-25-11, which provides direction for implementing DOE P 226.1A, Department
of Energy Oversight Policy, dated 5-25-07, which establishes DOE policy for
assurance systems and processes established by DOE contractors and oversight
programs performed by DOE line management and independent oversight
organizations.
c. DOE O 231.1B Environment, Safety, and Health Reporting, Administrative
Change 1, dated 11-28-12, sets forth a minimum set of occurrence reporting
14 DOE O 452.2E
1-26-2015
requirements for DOE (including NNSA) elements and contractors and includes
categorizing occurrences related to safety, environment, health, or operations;
notifying DOE; and developing follow-up reports.
d. DOE O 232.2 Chg 1, Occurrence Reporting and Processing of Operations
Information, dated 03-12-14, which provides requirements for categorizing and
reporting non-emergency NES occurrences.
e. DOE O 243.1B Chg 1, Records Management Program, dated 07-08-13, which
provides a framework for managing information in accordance with Department
policy and National Archives and Records Administration-approved DOE record
schedules.
f. DOE O 251.1C, Departmental Directives Program, dated 1-15-09, which details
the process for requesting exemptions from directives requirements.
g. DOE O 360.1C, Federal Employee Training, dated 07-06-11, which establishes
requirements and assigns responsibilities for DOE Federal employee training,
education, and development under the Government Employees Training Act of
1958, as amended.
h. DOE O 414.1D Chg 1, Quality Assurance, dated 05-08-13, which ensures that the
quality of DOE (including NNSA) products and services meets or exceeds the
customers' expectations.
i. DOE O 420.1C, Facility Safety, dated 12-04-12, which establishes the DOE
(including NNSA) facility safety for nuclear safety design, criticality safety, fire
protection, and natural phenomena hazards mitigation, and includes the
configuration management requirements for Safety SSCs.
j. DOE O 426.2 Chg 1, Personnel Selection, Training, Qualification, and
Certification Requirements for DOE Nuclear Facilities, dated 07-29-13, which
establishes selection, qualification, and training requirements for management and
operating contractor personnel involved in the operation, maintenance, and
technical support of DOE (including NNSA) Category A and B reactors and
nonreactor nuclear facilities.
k. DOE O 433.1B Chg 1, Maintenance Management Program for DOE Nuclear
Facilities, dated 3-12-13, which defines the safety management program required
for maintenance and the reliable performance of structures, systems and
Section 10
components that are part of the safety basis.
l. DOE O 452.1D Chg 1, Nuclear Explosive and Weapon Surety Program, dated 07
10-13, which establishes requirements and responsibilities for the DOE Nuclear
Explosive and Weapon Surety Program, or successor directive.
15 DOE O 452.2E
1-26-2015
m. NA SD 452.2, Nuclear Explosive Safety Evaluation Processes, dated 11-17-14,
which provides requirements and guidance for nuclear explosive safety studies,
operational safety reviews, and nuclear explosive safety change evaluations.
n. DOE O 461.1B, Packaging and Transportation for Offsite Shipment of Materials
of National Security Interest, 12-20-10.
o. DOE-STD-1020-2012, Natural Phenomena Hazards Analysis and Design
Criteria for DOE Facilities, dated December 2012, provides criteria and guidance
for the analysis and design of facility structures, systems, and components (SSCs)
that are necessary to implement the requirements of DOE O 420.1C, Facility
Safety, and to ensure that the SSCs will be able to effectively perform their
intended safety functions under the effects of natural phenomena hazards (NPHs).
p. DOE-STD-1073-2003, Configuration Management Program, dated October
2003, which defines the objectives of a configuration management process for
DOE nuclear facilities (including activities and operations) and provides detailed
examples and supplementary guidance on methods to achieve those objectives.
q. DOE-STD-1104-2009, Review and Approval of Nuclear Facility Safety Basis and
Safety Design Basis Documents, dated May 2009, which describes DOE review
and approval of documented safety analyses and Technical Safety Requirements
for existing Hazard Category 1, 2, and 3 nuclear facilities that document their
safety basis in accordance with 10 CFR Part 830.
r. DOE STD 1212-2012, Explosives Safety, dated June 2012, which describes
DOE’s explosives safety requirements applicable to operations involving the
development, testing, handling, and processing of explosives or assemblies
containing explosives.
s. DOE-STD-3009-94, Chg. 3 Preparation Guide for U.S. Department of Energy
Nonreactor Nuclear Facility Documented Safety Analyses, dated March 2006,
which describes a Safety Analysis Report preparation method that satisfies
10 CFR Part 830 requirements.
t. DOE-NA-STD-3016-2006, Hazard Analysis Reports for Nuclear Explosive
Operations, dated May 2006, which clarifies the requirements and provides
guidance for conducting hazard analyses and preparing Hazard Analysis Reports
for nuclear explosive operations and associated activities.
u. 10 CFR Part 712, Human Reliability Program, which establishes the policies and
procedures for the DOE, including NNSA, human reliability program (HRP). The
HRP is a security and safety reliability program designed to ensure that
individuals who occupy positions affording access to certain materials, nuclear
explosive devices, facilities, and programs meet the highest standards of
reliability and physical and mental suitability.
16 DOE O 452.2E
1-26-2015
v. 10 CFR Part 820, Procedural Rules for DOE Nuclear Activities, which sets forth
procedures to govern the conduct of persons involved in DOE nuclear activities
and, in particular, to achieve compliance with the DOE Nuclear Safety
Requirements by all persons subject to those requirements.
w. 10 CFR Part 830, Nuclear Safety Management, which governs the conduct of
DOE contractors, DOE personnel, and other persons conducting activities
Section 11
(including providing items and services) that affect, or may affect, the safety of
DOE nuclear facilities.
x. Title 32 of P.L. 106-65, the National Nuclear Security Administration Act, dated
October 5, 1999, as amended, which established a separately organized agency
within the Department of Energy.
y. Joint Department of Energy/Department of Defense (DOE/DoD) Technical
Publication 20-7, Nuclear Safety Criteria, dated 01-02-02.
z. Joint DOE/DoD Technical Publication 35-51 Chg. 10, General Instructions
Applicable to Nuclear Weapons, dated 08-14-08.
aa. Joint DOE/DoD Technical Publication 45-51 Chg. 2, Transportation of Nuclear
Weapons Materiel, General Shipping and Limited Life Component Data (LLC),
dated 08-01-07.
bb. Joint DOE/DoD Technical Publication 45-51A Chg. 5, Transportation of Nuclear
Weapons Materiel (Supplement), Shipping and Identification Data for Stockpile
Major Assemblies, dated 03-20-07.
8. CONTACT. Questions concerning this Order should be addressed to the Associate
Administrator for Safety and Health, 202-586-3885.
ELIZABETH SHERWOOD RANDALL
Secretary of Energy
DOE O 452.2E Attachment 1
1-26-2015 Page 1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE O 452.2E, NUCLEAR EXPLOSIVE SAFETY
This Contractor Requirements Document (CRD) establishes the requirements for Department of
Energy (DOE) contractors, including National Nuclear Security Administration (NNSA)
contractors, whose contracts involve the performance, management, oversight, or direct support
of DOE (including NNSA) nuclear explosive operations (NEOs) or associated activities.
Regardless of the performer of the work, the contractor is responsible for complying with the
requirements of this CRD. The contractor is responsible for flowing down the requirements of
this CRD to subcontractors at any tier to the extent necessary to ensure the contractor’s
compliance with the requirements.
Attachment 2 through 5 of this directive must be included along with the CRD in all contracts
that involve performing, managing, overseeing, or directly supporting NEOs or associated
activities.
All contractors with this CRD incorporated in their contracts must comply with the following
requirements to support the Nuclear Explosive Safety Program.
1. General Nuclear Explosive Safety Rules (NESRs). Contractors must ensure that NEOs
under their purview are designed and performed in a manner that satisfies the following
General NESRs.
a. Nuclear Explosive Safety Evaluation. NEOs must not be performed until a NES
evaluation has been completed and findings for which a NES standard has not
been met have been closed.
b. Nuclear Explosive Operating Procedures. NEOs must be performed in accordance
with approved written procedures.
c. One-Point Safety.
(1) Tooling and equipment must be evaluated to ensure that their use does not
cause a one-point safety violation of a nuclear explosive certified to be
one-point safe.
(2) If it is determined that a nuclear explosive no longer meets the one-point
safety criteria, all assembly/disassembly production plant operations
(including onsite transportation) and offsite transportation with that
nuclear explosive must be discontinued in a safe manner. Before
operations with that nuclear explosive can be resumed, a path forward
must be developed, a NES evaluation must be completed and findings for
which a NES standard has not been met must be closed.
Attachment 1 DOE O 452.2E
Page 2 1-26-2015
Section 12
(3) NEOs involving a nuclear explosive not certified to be one-point safe must
be conducted at the Nevada National Security Site (NNSS), except as
authorized in accordance with paragraph 1c(2), above.
d. Nuclear Explosive Areas (NEAs).
(1) Authorized energy sources must be identified and documented.
Unauthorized energy sources must not be available in an NEA during
NEOs.
(2) Ignition sources in NEAs must be identified and (1) eliminated or (2)
minimized and controlled to prevent adverse interaction with
combustible/flammable materials and the nuclear explosive.
(3) Combustible and flammable materials in NEAs must be identified and (1)
eliminated or (2) minimized and controlled to prevent adverse interaction
with the nuclear explosive.
e. Electrical Testing. Except as authorized in accordance with paragraph 1f,
Anomalous Units, nuclear explosives must not be subjected to —
(1) redundant electrical tests, or
(2) electrical troubleshooting (i.e., to confirm the existence of a fault or aid in
fault isolation) except with authorized test equipment and procedures that
have been subjected to a NES evaluation and found to be acceptable for
the specific application.
f. Anomalous Units.
(1) If it is determined that a nuclear explosive is no longer in a condition
covered by a NES evaluation, all operations with that nuclear explosive
and in the associated facility must be discontinued in a safe manner,
resulting in a safe and stable nuclear explosive configuration.
(2) Restart of operations on the anomalous unit and other activities in the
affected facility must be in accordance with paragraph 15 below.
2. Supplemental Nuclear Explosive Safety Rules. Contractors may propose supplemental
NESRs to support specific tests, operations, or characteristics of a nuclear explosive.
3. Nuclear Explosive Safety Evaluations. Contractors must ensure that all NEOs under their
purview are covered by an approved NES evaluation and request and support NES
evaluations as needed. NES evaluation requirements are specified in NA SD 452.2,
Nuclear Explosive Safety Evaluation Processes, or successor directive.
4. Human Factors. Newly proposed (startup) NEOs must incorporate human factors
principles into NEO procedures, processes, facility layouts, new tooling and equipment,
DOE O 452.2E Attachment 1
1-26-2015 Page 3
including Category 1 electrical equipment, starting with the NEO design and
development phase and maintained throughout the lifecycle of NEOs. Existing NEOs that
are being evaluated (i.e. during an OSR or NCE) should strive to meet human factors
principles to the extent reasonably achievable.
When developing NEOs, the contractor must consider the application of established
research in human factors and ergonomics, including human-system interface design,
human cognition and perception, stress and workload, anthropometry and workspace
design, environmental factors, training, and human error.
5. Procedures.
a. Contractors responsible for NEOs and associated activities and facilities must
follow approved written procedures (paper or electronic) for all NEOs to control
interactions among the nuclear explosive, the operating facility, equipment, and
personnel.
b. Contractors must ensure design agency concurrence with original issues of
procedures for NEOs and associated activities.
c. Contractors must ensure NEO procedures place the proper emphasis on
preventing accidents and detecting abnormal conditions by accomplishing the
Section 13
following—
(1) comply with design specifications and technical requirements,
(2) clearly state cautions and warnings,
(3) identify appropriate points to safely interrupt work,
(4) include generic contingency procedures directed toward quickly achieving
a safe and stable nuclear explosive configuration to be applied in response
to all unexpected situations not covered by other written procedures.
6. Two-Person Concept. Contractors responsible for NEOs and associated activities and
facilities must establish and implement the two-person concept in accordance with
Attachment 2 of this Order, to ensure no lone individual has access to a nuclear
explosive.
7. Facilities. Contractors must ensure that facilities used for nuclear explosive operations are
characterized, evaluated, and specifically approved for that use as documented in a 10
CFR Part 830 compliant documented safety analysis.
If a safety structures, systems, and components (SSC) meets a performance goal
requirement based on DOE -STD-1020 criteria, the SSC credibly controls the NPH-
initiated hazard.
8. Equipment. Contractors responsible for NEOs and associated activities and facilities must
ensure that all equipment used in NEAs (including tooling, testers, and other mechanical
Attachment 1 DOE O 452.2E
Page 4 1-26-2015
and electrical equipment) meet the following requirements. Attachment 3 of this Order
specifies additional requirements for electrical equipment used in NEAs.
a. Design specifications and technical requirements are documented.
b. Designs must ensure that the nuclear explosive remains in a safe condition should
a system or component of the equipment fail.
c. Each item used in an NEO must be specifically approved for that operation.
Unapproved movable items must be excluded from the NEA. Positive measures
must be used to preclude use of facility equipment that is not approved for the
NEO and impracticable to remove.
d. Equipment intended to apply energy to a nuclear explosive must incorporate
features that limit application of energy to a known safe level.
e. Energetic equipment intended for use in NEAs by emergency responders (e.g.,
fire department personnel, security force, and radiological protection) must be
evaluated and characterized with respect to potential hazards. Training of
expected responders and NEA workers must address emergency situations to help
ensure safety of responders and associated equipment.
9. Maintenance of Facilities, Tooling, and Other Equipment. Contractors responsible for
NEOs and associated activities and facilities must review maintenance programs and
activities for impact on NES. Maintenance implementation plans must include a detailed
description of maintenance activity control and approval, including limitations on
equipment and materials that are allowed in NEAs.
10. Personnel. Contractors responsible for and/or involved in NEOs and associated activities
must implement training, qualification, and certification programs for personnel that
manage, oversee, perform, or directly support these operations and activities.
In addition to the applicable requirements in 10 CFR Part 712, Human Reliability
Program, and DOE O 426.2, Personnel Selection, Training, Qualification, and
Certification Requirements for DOE Nuclear Facilities, contractors must provide annual
training for personnel assigned to nuclear explosive duty that includes the following NES-
specific topics.
Section 14
a. Responsibilities associated with custody of nuclear explosives.
b. Use of general and supplemental NESRs an Immediate Action Procedures.
c. Site-/facility-,program- and operation-specific safety requirements.
d. The purpose, objective, and responsibilities of the two-person concept for
operations.
e. Explosive safety appropriate for assigned responsibilities.
DOE O 452.2E Attachment 1
1-26-2015 Page 5
For site-/facility-, program-, and operation-specific safety requirements, the annual
training requirements under (10)(c) above may be met with training provided during an
initial certification or qualification program and through a continued recertification or
requalification process provided that the process requires a no less than annual review or
demonstration of the knowledge of the safety requirements.
11. Transportation of Nuclear Explosives. Nuclear explosive transportation is a mobile NEO
and involves a mobile NEA. Requirements specified for NEOs and NEAs elsewhere in
this CRD apply.
a. Contractors responsible for NEOs and associated activities and facilities must
establish requirements and procedures to ensure safe onsite transportation of
nuclear explosives.
b. Transportation operations and shipping configurations, including all items in a
conveyance, are subject to the NES evaluation requirements of paragraphs 1a and
3 of this CRD.
(1) Contractors must ensure nuclear explosives are transported in conveyances
specifically reviewed and approved through the NES evaluation process.
(2) Contractors must ensure appropriate criteria are established for protecting
nuclear explosives during transportation. Contractors must ensure the
criteria and restraint designs for specific nuclear explosive configurations
are reviewed and approved through the NES evaluation process.
12. Mixed Venues. Contractors responsible for NEOs must not transport or stage nuclear
explosives with any other assembly that could be mistaken for a nuclear explosive.
If operational constraints require nuclear explosives and NELAs to be collocated, the
operations must comply with the NELA standards in paragraph 17 of this attachment
and must be evaluated by a NESSG. The operational justification for collocation of
the nuclear explosives and NELAs will be provided to the NESSG during the
evaluation.
13. Positive Verification.
a. Contractors responsible for NEOs and associated activities and facilities must
develop and implement a verification process to ensure use of qualified personnel
who are fit for duty, operationally ready facilities, correct equipment that is
current in any required calibration and preventive maintenance, and current
approved procedures.
b. Contractors must ensure the configuration and condition of a nuclear explosive
and its safety features are known or determined as early as practical during any
planned NEO.
Attachment 1 DOE O 452.2E
Page 6 1-26-2015
14. Change Control. Contractors responsible for NEOs and associated activities and facilities
must establish and implement a NES change evaluation process in accordance with NA
SD 452.2, or successor directive. This NES evaluation is separate and independent from
the USQ process required by 10 CFR Part 830, Nuclear Safety Management, and must be
completed before approval and implementation of the change.
Contractors must ensure that their change control process captures all proposed changes
to approved NEOs including the following:
Section 15
a. Proposals that may have direct NES implications (e.g., procedural, equipment, or
facility changes to an approved NEO).
b. Proposals that may have indirect NES implications (e.g., changes or new
activities that could impact the foundation established by previous NES
Master Studies).
c. Changes in knowledge affecting an approved NEO (e.g., new understanding of a
potential threat to NES or new data regarding the response of a nuclear explosive
to a stimulus).
15. Anomalous Unit Determination and Processing. An anomalous unit might be created or
discovered in the course of NEOs performed by NNSA or its contractors, or might be
received from the Department of Defense (DoD) in a known anomalous condition.
Contractors must support the OST NEO change control process to ensure anomalous
units accepted for transport are safe to ship and that any special handling, receiving, or
staging requirements are known and accepted in advance by the receiving organization.
The following apply to anomalous units at the production agency
a. The production agency Process Engineer, production agency NES representative,
and design agency System Engineer collectively have the authority to declare a
unit anomalous. If the three cannot agree that the unit in question is not
anomalous, then the unit will be treated as anomalous. The design agency System
Engineer may solicit input from their respective design agency NESSG
member(s) prior to making an anomalous unit determination.
b. Before operations with the anomalous unit can be resumed, the NEO change
control process must be completed in accordance with paragraph 14. A design
agency engineering release must be developed as input to the change control
process.
(1) The responsible design agencies must specifically review the engineering
release for impact on NES. A NESSG-certified member from the design
agency must be involved in the review. This review must be documented
in the engineering release.
DOE O 452.2E Attachment 1
1-26-2015 Page 7
(2) Transportation operations, if applicable, must be specifically addressed in
the engineering release. Offsite transportation operations are subject to the
Office of Secure Transportation NEO change control process.
c. A decision to resume other activities in the facility must include consideration of
possible interactions with the anomalous unit.
d. If additional information is obtained after a unit has been declared anomalous
(e.g. from a radiograph), the new information shall be evaluated to determine if
the unit should remain anomalous.
16. Configuration Management. Contractors responsible for NEOs and associated activities
and facilities must develop and implement a configuration management program
incorporating elements applicable to NEOs and associated activities and facilities. To
ensure consistency with design requirements and the safety basis, the configuration
management program must specifically include the following:
a. control of the physical configuration of a nuclear explosive and its components;
the tooling, equipment, and procedures used in NEOs and associated activities;
and the interface with the facilities in which these operations and activities are
conducted;
b. unique identification of special tooling and equipment used in NEOs;
c. positive identification of tooling and equipment requiring calibration/testing
within a calibration/testing control program; and
Section 16
d. incorporation of approved changes into all affected documents (including design
documents, drawings, procedures, and safety basis documents) and programs
(including maintenance and training).
17. Nuclear Explosive-Like Assemblies (NELAs).
a. Nuclear Explosive-Like Assembly Standards. Contractors responsible for NELA
operations must ensure those operations meet the following qualitative NELA
standards.
(1) There must be positive measures to prevent accidental/inadvertent, or
deliberate unauthorized assembly of a nuclear explosive in place of a
NELA configuration.
(2) There must be positive measures to prevent accidental/inadvertent, or
deliberate unauthorized transfer of a nuclear explosive in place of a NELA
configuration.
In the context of these NELA Standards, the term “prevent” is applied as
described for the Nuclear Explosive Surety Standards in DOE O 452.1E.
Attachment 1 DOE O 452.2E
Page 8 1-26-2015
b. Contractors responsible for NELA operations must implement the NELA
requirements in accordance with Attachment 4 of this directive.
18. Marking Instructions. Nuclear explosives and NELAs must be marked to distinguish
configurations capable of a nuclear explosive detonation from those that are not.
Contractors responsible for NEOs or NELA operations must permanently mark nuclear
explosives and NELAs in accordance with the instructions in Attachment 5 of DOE O
452.2E or successor directive.
19. Records. Contractors must maintain records (documentation) in accordance with National
Archives and Records Administration-approved DOE or site-specific records retention
and disposition schedules (See CRD to DOE O 243.1B, Records Management Program,
dated 7-8-13 or successor directive).
DOE O 452.2E Attachment 2
1-26-2015 Page 1
TWO-PERSON CONCEPT REQUIREMENTS
This Attachment applies to both Federal and contractor organizations.
1. BASIC REQUIREMENTS.
The two-person concept (TPC) is implemented to ensure no lone individual has
unrestricted access to a nuclear explosive. A TPC team must be in the nuclear
explosive area (NEA) when a nuclear explosive is not protected by a dual-lock system
or other NESSG-evaluated security system. The TPC is also required for Category 1
Electrical Equipment as specified in Attachment 3 paragraph 2.c of this Order and for
certain NELA assembly steps as specified in Attachment 4 paragraphs 3 and 4 of this
Order. NNSA Field Element Offices may also require TPC protection for other
operations.
Each person on a two-person concept team must—
a. be certified in the Human Reliability Program,
b. have authorized access to the NEA,
c. have technical knowledge of the task being performed,
d. be knowledgeable of pertinent safety and security requirements, and
e. be in a position to detect incorrect or unauthorized acts and take appropriate
action.
2. IMPLEMENTATION OPTIONS.
The two-person concept may be implemented using either zone coverage or person-to
person coverage.
a. Zone Coverage.
Zone coverage is a term used to identify two-person concept implementation that
meets the basic requirements of paragraph 1 without the additional requirements
specified to protect configurations that require person-to-person coverage.
b. Person-to-Person Coverage.
Person-to-person coverage is the more stringent form of the two-person concept.
Person-to-person coverage is designed to protect configurations that are
particularly vulnerable to inadvertent acts (errors of omission or commission) or
Section 17
deliberate unauthorized acts.
(1) Configurations requiring person-to-person coverage must be determined
based on specific system characteristics. The application of person-to
person coverage allows recognition of the protection provided by design
Attachment 2 DOE O 452.2E
Page 2 1-26-2015
safety features [such as insensitive high explosive (IHE), coded-signal
controlled detonators, and unique-signal-operated strong-link devices] and
physical protection (such as closed shipping and storage containers and
specially designed covers).
(2) Configurations requiring person-to-person coverage include the
following:
(a) Exposed conventional high explosive (CHE) main charge in an
NEA.
(b) Main charge high explosives (HEs), both CHE and IHE, with
accessible detonator cable assemblies in an NEA.
(c) Nuclear explosives connected to Category 1 electrical equipment.
(Category 1 electrical equipment is described in Attachment 3,
paragraph 2, of this Order.)
3. WHEN TO APPLY PERSON-TO-PERSON COVERAGE.
a. Assembly/Disassembly Operations Involving Conventional High Explosive.
(1) For assembly operations involving CHE main charge, person-to-person
coverage of the CHE components must begin when the CHE container is
opened in an NEA.
(2) Coverage continues until the nuclear explosive is in a configuration in
which the application of design-specific environmental stimuli or unique
or coded signals is necessary for nuclear explosive detonation or
detonation of the main charge HE.
(3) For disassembly operations, this requirement applies in reverse.
b. Assembly/Disassembly Operations Involving Insensitive High Explosive.
(1) For assembly operations involving IHE main charge, person-to-person
coverage must be provided for main charge components located in an
NEA, and assemblies containing these components, that have accessible
detonator cables attached.
(2) Coverage must continue until the nuclear explosive is in a configuration in
which the application of design-specified environmental stimuli or unique
or coded signals is necessary for nuclear explosive detonation or
detonation of the main charge HE.
(3) For disassembly operations this requirement applies in reverse.
c. For purposes of person-to-person coverage, systems with installed and unactuated
(safe/reset) mechanical safe and arm detonators are not considered to have
DOE O 452.2E Attachment 2
1-26-2015 Page 3
accessible detonator cables. Configurations with physical protection that
precludes immediate and unrestricted access to the configuration by a lone
individual are not considered to be exposed. When such physical protection is in
place, zone coverage provides adequate protection for configurations that would
otherwise require person-to-person coverage.
4. HOW TO APPLY PERSON-TO-PERSON COVERAGE.
When a configuration requires person-to-person coverage, a qualified two-person concept
team must be either working on or controlling access to the configuration. Specific
person-to-person coverage requirements are as follows.
a. Lone individuals must not be allowed within the immediate vicinity
(approximately 6 feet) of a configuration that requires person-to-person
coverage.
b. The two people providing person-to-person coverage must each be responsible for
the safe conduct of the operations.
c. During the performance of operations on a configuration requiring person-to
person coverage—
(1) the two-person concept team must be in the immediate vicinity of the
Section 18
configuration;
(2) each person on the two-person concept team must observe all operations,
ensure that only authorized operations are performed, and ensure that
operations are performed correctly; and
(3) a reader-worker process that includes the following must be
incorporated.
(a) The procedure must be read aloud, the operation must be
performed, and the completion of the operation must be
documented in the stated sequence.
(b) One of the two people performing the operation may read the
procedure aloud to the other person provided that both people can
move away from the immediate vicinity of the configuration while
the reading is accomplished.
(c) If both people cannot move away from the immediate vicinity of
the configuration while the reading is accomplished, then a third
person must read the procedure aloud to the other people.
(4) Based on an approved NES evaluation, other means to achieve the person-
to-person coverage objective may be authorized.
Attachment 2 DOE O 452.2E
Page 4 1-26-2015
d. When operations are not being performed on a configuration requiring person-to
person coverage—
(1) the two-person concept team must be in the immediate vicinity of the
configuration when another individual is in the immediate vicinity of the
configuration.
(2) the two-person concept team is not required to be in the immediate
vicinity of the configuration when other individuals are not in the
immediate vicinity of the configuration. However, team members must
remain in a position to directly observe the approach of any individual to
the configuration.
e. Only one configuration requiring person-to-person coverage is allowed in a
vacated bay or cell. This requirement does not apply to emergency evacuations.
DOE O 452.2E Attachment 3
1-26-2015 Page 1
ELECTRICAL EQUIPMENT REQUIREMENTS
This Attachment applies to both Federal and contractor organizations.
1. BASIC REQUIREMENTS.
For purposes of defining electrical equipment requirements, this Order categorizes
electrical equipment used in NEAs as Category 1, Category 2, or Category 3. Electrical
equipment categorization is intended to ensure that controls are implemented
commensurate with the various levels of potential electrical threat.
2. CATEGORY 1 ELECTRICAL EQUIPMENT.
Electrical equipment intended for connection to an electrical circuit of a nuclear
explosive or HE subassembly is referred to as “Category 1 electrical equipment.”
Category 1 electrical equipment must be clearly identified and meet the following
minimum requirements.
a. General Requirements.
(1) Category 1 electrical equipment must have a safety requirements
document that identifies the safety features.
(2) Category 1 electrical equipment must use the lowest practical values of
internal and output currents and voltages.
(3) Category 1 electrical equipment must not apply unacceptable stimuli as
the result of a single-point failure.
(4) Each item of Category 1 electrical equipment must have safety
characteristics independent of the nuclear explosive’s safety features.
(5) Each item of Category 1 electrical equipment and its interface with a
nuclear explosive require the performance and documentation of a
comprehensive safety analysis, including consideration of relevant
abnormal environments.
(6) Each drawing issue of Category 1 electrical equipment and its interface
with a nuclear explosive requires a completed NES evaluation.
Section 19
(7) Procedures must be established to operate, control, calibrate, maintain,
and store Category 1 electrical equipment.
(8) A record of approved Category 1 electrical equipment must be
established and maintained. The record must identify each item of
Category 1 electrical equipment by its unique designation and/or part
number and associate it with the nuclear explosives for which it is
authorized and the NES evaluations that examined its specific
applications.
Attachment 3 DOE O 452.2E
Page 2 1-26-2015
b. Computer-Controlled Electrical Equipment.
(1) Software must not be relied upon to assure the safe state of the unit under
test. If software is used to achieve a safe state then a separate means of
verification must also be employed.
(2) Testers must be designed such that software is incapable of causing
safety feature bypass.
(3) Software failure must not compromise the safety attributes of the
equipment or unit under test.
c. Two-Person Concept.
Category 1 electrical equipment requires two-person concept protection. (The
TPC is delineated in Attachment 2 of this Order.)
(1) Person-to-person coverage is required during calibration and all
operations that afford internal access to Category 1 electrical equipment
and associated cables and adapters, and while Category 1 electrical
equipment is connected to a nuclear explosive.
(2) Zone coverage is required for fully assembled Category 1 electrical
equipment and associated cables and adapters when that equipment is not
protected by a dual-lock system or other NESSG-evaluated security
system.
3. CATEGORY 2 ELECTRICAL EQUIPMENT.
Electrical equipment that is not intended for connection to an electrical circuit of a
nuclear explosive or HE subassembly but makes mechanical connection to, or could
come in contact with, a nuclear explosive or HE subassembly is referred to as “Category
2 electrical equipment.” Category 2 electrical equipment must be clearly identified and
meet the following minimum requirements.
a. General Requirements.
(1) Category 2 electrical equipment must not be connected to the electrical
circuitry of a nuclear explosive.
(2) Category 2 electrical equipment must be positioned in a manner to
preclude contact with a nuclear explosive except when a mechanical
connection is required to perform its intended and authorized function.
(3) The potential for inadvertent connection between the Category 2
electrical equipment and the nuclear explosive circuitry must be
minimized.
DOE O 452.2E Attachment 3
1-26-2015 Page 3
b. Positive Electrical Isolation.
Positive electrical isolation must be established and demonstrated for Category 2
electrical equipment that makes a mechanical connection to a nuclear explosive.
Electrical isolation must account for both normal and credible abnormal
conditions (such as equipment faults or lightning strikes). The electrical isolation
scheme used must be clearly identified and documented using one of the
following subcategories, listed in priority order.
(1) Path-on isolation reducing leakage or fault current from electrical energy
sources associated with the equipment to a defined safe value. This must
be verified annually.
(2) Path-off isolation reducing leakage or fault current from electrical energy
sources associated with the equipment to a defined safe value. This must
be verified annually.
(3) An electrical isolation scheme requiring at least two independent failures
before exposing the nuclear explosive to unacceptable leakage or fault
Section 20
current from electrical energy sources associated with the equipment.
Each failure mechanism must be identified.
c. Records.
A record of approved Category 2 electrical equipment must be established and
maintained. The record must identify each item of Category 2 electrical
equipment by its unique designation and/or part number and associate it with the
nuclear explosive operations for which it is authorized.
4. CATEGORY 3 ELECTRICAL EQUIPMENT.
Moveable and facility electrical equipment used in an NEA that is not intended for
connection to an electrical circuit of a nuclear explosive or HE subassembly and does
not make mechanical connection to, and cannot come in contact with, a nuclear
explosive or HE subassembly is referred to as “Category 3 electrical equipment.”
5. NES EVALUATIONS AND CHANGE CONTROL.
Electrical equipment used in NEAs and proposed changes to electrical equipment,
procedures, and interfaces with a nuclear explosive are subject to the NES evaluation
and NEO change control processes required by this Order and detailed in NA SD 452.2,
Nuclear Explosive Safety Evaluation Processes.
Design agency documents which specify general design and process requirements for
Category 1 electrical equipment used on nuclear explosives (e.g. DG10001 and
EP401075) are subject to NES evaluation (i.e. during applicable evaluations such as the
Approved Equipment Program Master Study). Changes to these documents must be
concurred with by each design agency NES organization. This concurrence must be
Attachment 3 DOE O 452.2E
Page 4 1-26-2015
documented in an engineering authorization. However, each change does not require
formal NESSG review.
DOE O 452.2E Attachment 4
1-26-2015 Page 1
NUCLEAR EXPLOSIVE-LIKE ASSEMBLY (NELA) REQUIREMENTS
This Attachment applies to both Federal and contractor organizations. The following
requirements support the NELA standards defined in paragraph 4a(17)(a) of this Order and
paragraph 17a of the CRD (Attachment 1 of this Order).
1. NUCLEAR EXPLOSIVE-LIKE ASSEMBLY DEFINITION.
An assembly with all the following attributes is considered a NELA.
a. Designed or intended to represent a nuclear explosive in the U.S. nuclear weapons
program in its basic configuration (main charge HE and pit) or any higher level of
assembly up to a fully assembled weapon configuration.
b. Lacks an arrangement of high explosive (HE) and fissile material capable of
producing a nuclear explosive detonation.
c. Resembles a nuclear explosive to the degree that it can be mistaken for a nuclear
explosive (without any disassembly).
Note: Availability of a simple visual inspection (such as a viewing port to internal
components) is adequate to assure that an item would not be mistaken for an
actual nuclear explosive, and therefore would not be considered a NELA and
would not have to meet the NELA requirements in this Attachment.
d. Possesses weight such that the NELA cannot be readily distinguished from the
nuclear explosive it represents.
2. NUCLEAR EXPLOSIVE-LIKE ASSEMBLY TYPES.
There are three types of NELAs:
a. A “High Explosive NELA” contains live HE main charge and dummy pit, void,
or other non-nuclear items in place of the live pit.
b. An “Inert-with-Live-Pit NELA” contains a live pit and mock HE, void, or
substitute non-explosive material in place of the main charge.
c. An “Inert NELA” contains mock HE, void, or substitute non-explosive material in
place of the main charge and a dummy pit, void, or other non-nuclear items in
Section 21
place of the live pit.
3. ASSEMBLY/DISASSEMBLY OF NUCLEAR EXPLOSIVE-LIKE ASSEMBLIES.
NELAs must not be assembled or disassembled in close proximity to nuclear explosives
where components may be interchanged. A two-person concept team is required to
perform all assembly/disassembly operations on Inert-with-Live-Pit NELAs.
Attachment 4 DOE O 452.2E
Page 2 1-26-2015
4. VERIFICATION OF NUCLEAR EXPLOSIVE-LIKE ASSEMBLY COMPONENTS
BEFORE ASSEMBLY.
a. High Explosive Nuclear Explosive-Like Assemblies.
High Explosive NELAs and Inert-with-Live-Pit NELAs must not be assembled or
disassembled in close proximity where components may be interchanged.
Verification requirements of this section are not necessary for NELA
configurations for which physical dimensions preclude substitution of a live pit.
(1) High-Fidelity Dummy Pit Verification Requirements.
(a) Before assembly into a High Explosive NELA, the pit must be
verified by radiation detection means to verify the absence of
radioactive material. If radiation is detected, the pit must be
assayed by using gamma spectrometry/multi-channel analyzer to
verify the absence of fissile material. This verification must be
either performed or observed by a two-person concept team.
(b) After dummy pit verification, the pit must be controlled until the
pit is assembled into the basic NELA configuration. This control
must be achieved by a two-person concept team or a dual-lock or
other NESSG-evaluated security system.
(c) An auditable record of radiation detection verification of the high-
fidelity dummy pit must be available.
(2) Main Charge High Explosive Introduction Sequence.
The high-fidelity dummy pit verification must be accomplished before
introduction of the main charge HE and dummy pit into the same
immediate assembly area of the High Explosive NELA.
b. Inert-with-Live-Pit Nuclear Explosive-Like Assemblies.
Inert-with-Live-Pit NELAs and High Explosive NELAs must not be assembled or
disassembled in close proximity where components may be interchanged.
(1) Mock High Explosive Verification Requirements.
(a) All mock HE used in place of live main charge HE must be non-
detonable and must be clear or colored pink. Where possible,
preference must be given to noncombustible formulations. Live
main charge HE must not be colored pink.
(b) Pink mock HE used in place of live main charge HE must be
chemically verified before assembling the NELA. Clear mock HE
DOE O 452.2E Attachment 4
1-26-2015 Page 3
refers to LEXAN or similar inert substance and does not require
chemical verification.
(c) An auditable record of chemical verification of the mock HE must
be available.
(2) Mock High Explosive Two-Person Concept Verification Requirements.
(a) In addition to the mock HE verification requirements, another
chemical verification of all mock HE used in place of live main
charge HE must be accomplished before assembly into an Inert
with-Live-Pit NELA. This verification must be either performed or
observed by a two-person concept team.
(b) After the mock HE two-person concept verification, the mock HE
must be controlled until the mock HE is assembled into the basic
NELA configuration. This control must be achieved by a two-
person concept team or a dual-lock or other NESSG-evaluated
security system.
(c) An auditable record of two-person concept chemical verification of
the mock HE must be available.
(1) Live Pit Introduction Sequence.
Section 22
The mock HE verifications required by paragraphs 4b(1) and 4b(2) must
be accomplished before introduction of the live pit and mock HE into the
same immediate assembly area of the Inert-with-Live-Pit NELA.
c. Inert Nuclear Explosive-Like Assemblies.
Repetition of verification requirements of this section is not necessary for
repeated disassembly and reassembly training operations provided the mock HE
and high-fidelity dummy pit remain in a training area where main charge HE and
live pits are not authorized.
Verification requirements of this section are not necessary for NELA
configurations for which physical dimensions preclude substitution of live main
charge and pit components.
(1) Mock High Explosive Verification Requirements.
(a) All mock HE used in place of live main charge HE must be non-
detonable and must be clear or colored pink. Where possible,
preference must be given to noncombustible formulations. Live
main charge HE must not be colored pink.
(b) Pink mock HE used in place of live main charge HE must be
chemically verified before assembling the NELA. Clear mock HE
Attachment 4 DOE O 452.2E
Page 4 1-26-2015
refers to LEXAN or similar inert substances and does not require
chemical verification.
(c) An auditable record of chemical verification of the pink mock HE
must be available.
(2) High-Fidelity Dummy Pit Verification Requirements.
(a) Before assembly into an Inert NELA, the pit must be verified by
radiation detection means to verify the absence of radioactive
material. If radiation is detected, the pit must be assayed by using
gamma spectrometry/multi-channel analyzer to verify the absence
of fissile material. This verification must be either performed or
observed by a two-person concept team.
(b) After dummy pit verification, the pit must be controlled until the
pit is assembled into the basic NELA configuration or until the pit
is delivered into an assembly area where live pits are not
authorized. This control must be achieved by a two-person concept
team or a dual-lock or other NESSG-evaluated security system.
(c) An auditable record of radiation detection verification of the high-
fidelity dummy pit must be available.
5. OFFSITE TRANSPORTATION OF NUCLEAR EXPLOSIVE-LIKE ASSEMBLIES.
a. Inert-with-Live-Pit NELA Transfer Restriction.
A configuration assembled as an Inert-with-Live-Pit NELA must not be
transferred to the custody of the Department of Defense.
b. Identification Requirements.
NELAs that are shipped between DOE sites must be identified externally (e.g.,
stencil or tag) with the following information.
(1) NELA contents identified as one of the following.
(a) High Explosive NELA.
(b) Inert-with-Live-Pit NELA.
(c) Inert NELA.
(2) Name and agency of responsible person at the shipping location.
(3) Name and agency of person who authorized the shipment at the receiving
location.
DOE O 452.2E Attachment 4
1-26-2015 Page 5 (and Page 6)
c. Permission to Ship Between NNSA Sites.
The shipping agency must obtain permission from the receiving agency to ship
before shipment of a NELA.
d. Nuclear Explosive-Like Assembly Survey Before Transfer.
(1) Before offsite transfer of a NELA, the NELA must be surveyed in its
shipping configuration by radiation detection means to verify the absence
or presence of fissile material. Anomalies or ambiguities detected by
radiation detection means must be resolved before shipment.
Section 23
(2) An auditable record of this survey must be available.
e. Nuclear Explosive-Like Assembly Survey Upon Receipt.
(1) Upon receipt of a NELA, the NELA must be surveyed in its shipping
configuration by a radiation detection means to verify the absence or
presence of fissile material. Anomalies or ambiguities detected by
radiation detection means must be resolved before release.
(2) An auditable record of this survey must be available.
DOE O 452.2E Attachment 5
1-26-2015 Page 1
MARKING REQUIREMENTS
This Attachment applies to both Federal and contractor organizations. Nuclear explosives and
NELAs must be permanently marked in accordance with the following requirements. Additional
markings such as serial numbers and configuration identification may also be required by design
agencies.
1. PERMANENT MARKING LEGENDS.
a. Nuclear Explosives.
A “NUCLEAR” permanent marking legend must be applied to nuclear explosives
(i.e., units containing a live pit and an HE main charge).
b. Nuclear Explosive-Like Assemblies.
(1) High Explosive Nuclear Explosive-Like Assemblies. The “HIGH
EXPLOSIVE” permanent marking is applied to a NELA containing live
main charge HE and a dummy pit, void, or other non-nuclear items in
place of the live pit.
(2) Inert-with-Live-Pit Nuclear Explosive-Like Assemblies. The
“INERT-WITH-LIVE-PIT” permanent marking is applied to a NELA
containing a live pit and mock HE, void, or substitute non-explosive
material in place of the live main charge HE, and a live pit.
(3) Inert Nuclear Explosive-Like Assemblies. The “INERT” permanent
marking is applied to a NELA containing mock HE, void, or substitute
non-explosive material in place of the live main charge HE and a dummy
pit, void, or other non-nuclear items in place of the live pit.
Note: Using the permanent marking “INERT” or “INERT WITH LIVE PIT” does
not preclude the presence of materials that may present a hazard to personnel.
2. PERMANENT MARKING LOCATION.
Nuclear explosives and NELAs must be permanently marked on an external surface.
a. The permanent marking must be on a part that encloses the live main charge or
mock HE.
b. The marking location must be specified by the applicable design agency.
3. PERMANENT MARKINGS.
Nuclear explosives and NELAs must be marked in accordance with the following
requirements. The particular marking method must be specified by the applicable design
agency.
Attachment 5 DOE O 452.2E
Page 2 1-26-2015
a. The permanent marking method must produce the most durable mark possible,
consistent with acceptable deleterious effect on the material to which the marking
is applied.
(1) The preferred marking methods are mechanical engraving (with or without
fill) and impression-die stamping.
(2) Other acceptable methods are impression freehand, impression sandblast,
and surface conversion.
b. The preferred marking size is ¼-inch characters with ¼-inch spacing between
lines, if space permits.
4. PERMANENT MARKING OBLITERATION.
When a nuclear explosive or NELA is altered or disassembled to the point that its
permanent marking is no longer valid, the permanent marking must be obliterated in
accordance with the following requirements.
a. Methodology.
(1) The preferred method of obliteration is overprinting the letter “X” on each
letter of the permanent marking legend using the same permanent marking
method as that used to apply the original marking.
Section 24
(2) If obliteration by overprinting is not feasible for technical reasons, the
permanent marking must be removed using a method specified by the
applicable design agency.
b. Components That Will Be Reassembled.
Permanent marking need not be obliterated on marked components that will be
reassembled into the same configuration in accordance with the following
requirements.
(1) General Requirements.
(a) After the marked component is removed, the disassembled
components must be controlled until the disassembled components
and marked component are reassembled into the same
configuration.
(b) Prior to final assembly of a nuclear explosive or NELA,
verification of the permanent marking(s) shall be performed and
documented by two HRP certified personnel. Dual (or concurrent)
verification is acceptable.
(c) Positive measures must be in place to ensure that NELA
permanently marked components are not inadvertently introduced
DOE O 452.2E
1-26-2015
Attachment 5
Page 3 (and Page 4)
(d) into areas where nuclear explosive assembly or disassembly
operations are ongoing.
(2) Nuclear Explosives.
Nuclear explosive components must not be assembled or disassembled in
close proximity to NELAs, where components may be interchanged.
(3) Nuclear Explosive-Like Assemblies.
NELAs must not be assembled or disassembled in close proximity to
nuclear explosives, where components may be interchanged.
(a) High Explosive Nuclear Explosive-Like Assemblies. High
Explosive NELAs must not be assembled or disassembled in close
proximity to Inert or Inert-with-Live-Pit NELAs, where
components may be interchanged.
(b) Inert-with-Live-Pit Nuclear Explosive-Like Assemblies.
Inert-with-Live-Pit NELAs must not be assembled or disassembled
in close proximity to High Explosive or Inert NELAs, where
components may be interchanged.
(c) Inert Nuclear Explosive-Like Assemblies. Inert NELAs must not
be assembled or disassembled in close proximity to High
Explosive or Inert-with-Live-Pit NELAs, where components may
be interchanged.
Section 25
SUBJECT: NUCLEAR EXPLOSIVE SAFETY
1.PURPOSE.
2.CANCELLATION.
3.APPLICABILITY.
a. Departmental Elements.
b. DOE Contractors.
c. Exclusions.
4. REQUIREMENTS
a. Nuclear Explosive Safety Program.
(1) General Nuclear Explosive Safety Rules (NESRs).
(a)Nuclear Explosive Safety Evaluation.
(b)Nuclear Explosive Operating Procedures.
(c)One-Point Safety.
(d)Nuclear Explosive Areas (NEAs).
(e)Electrical Testing.
(f)Anomalous Units.
(2)Supplemental Nuclear Explosive Safety Rules.
(3)Nuclear Explosive Safety Evaluations.
(4)Human Factors.
(5)Procedures.
(6)Two-Person Concept.
(7)Facilities.
(8)Equipment.
(9)Maintenance of Facilities, Tooling, and Other Equipment.
(10)Personnel.
(11) Transportation of Nuclear Explosives.
(12)Mixed Venues.
(13)Positive Verification.
(14)Change Control.
(15) Anomalous Unit Determination and Processing.
(16)Configuration Management.
(17)Nuclear Explosive-Like Assemblies (NELAs).
(a)Nuclear Explosive-Like Assembly Standards.
(e) Nuclear Explosive-Like Assembly Requirements.
(18) Marking Instructions.
b.Independent Oversight.
c.Exemptions.
d.Records.
e.Implementation.
5. RESPONSIBILITIES.
a.Deputy Administrator for Defense Programs.
b.NNSA Field Element Managers responsible for NEOs.
c.Associate Administrator for Safety and
e.Director, Office of Nuclear Weapon Surety and Quality.
f.Chair, Nuclear Explosive Safety Study Group
6. DEFINITIONS.
a.Access.
b.Anomalous Unit.
c.Custody of Nuclear Explosives.
d.Dummy Pit.
e.Electrical Equipment.
f.Facility.
g.Human Factors.
A program established by 10 CFR Part 712 to ensure
i.Main Charge.
j.Mock High Explosive.
k.Nuclear Explosive Duty.
Nuclear Explosive-Like Assembly (NELA).
Nuclear Explosive Operation Associated Activities.
n.Nuclear Explosive Safety Rules (NESRs).
o.One-Point Safe Nuclear Explosive.
p.Permanent Marking.
q.Safety Basis.
r.Two-Person Concept (TPC).
7. REFERENCES.
8. CONTACT.
ATTACHMENT 1. CONTRACTOR REQUIREMENTS DOCUMENT
1. General Nuclear Explosive Safety Rules (NESRs).
a.Nuclear Explosive Safety Evaluation.
b.Nuclear Explosive Operating Procedures.
c.One-Point Safety.
d.Nuclear Explosive Areas (NEAs).
e.Electrical Testing.
f.Anomalous Units.
2.Supplemental Nuclear Explosive Safety Rules.
3.Nuclear Explosive Safety Evaluations.
4.Human Factors.
5. Procedures.
6.Two-Person Concept.
7.Facilities.
8.Equipment.
9.Maintenance of Facilities, Tooling, and Other Equipment.
10.Personnel.
11. Transportation of Nuclear Explosives.
12.Mixed Venues.
13.Positive Verification.
14.Change Control.
15. Anomalous Unit Determination and Processing.
16. Configuration Management.
17. Nuclear Explosive-Like Assemblies (NELAs).
18.Marking Instructions.
19.Records.
ATTACHMENT 2. TWO-PERSON CONCEPT REQUIREMENTS
1. BASIC REQUIREMENTS.
2.CATEGORY 1 ELECTRICAL EQUIPMENT.
ELECTRICAL EQUIPMENT REQUIREMENTS
1.BASIC REQUIREMENTS.
2.CATEGORY 1 ELECTRICAL EQUIPMENT.
a. General Requirements.
b.Computer-Controlled Electrical Equipment.
c.Two-Person Concept.
3. CATEGORY 2 ELECTRICAL EQUIPMENT.
a.General Requirements.
b.Positive Electrical Isolation.
4. CATEGORY 3 ELECTRICAL EQUIPMENT.
5. NES EVALUATIONS AND CHANGE CONTROL.
ATTACHMENT 4. NUCLEAR EXPLOSIVE-LIKE ASSEMBLY (NELA) REQUIREMENTS
1. NUCLEAR EXPLOSIVE-LIKE ASSEMBLY DEFINITION.
2. NUCLEAR EXPLOSIVE-LIKE ASSEMBLY TYPES.
3.ASSEMBLY/DISASSEMBLY OF NUCLEAR EXPLOSIVE-LIKE ASSEMBLIES.
4.VERIFICATION OF NUCLEAR EXPLOSIVE-LIKE ASSEMBLY COMPONENTSBEFORE ASSEMBLY.
Section 26
a. High Explosive Nuclear Explosive-Like Assemblies.
b. Inert-with-Live-Pit Nuclear Explosive-Like Assemblies.
(1)Mock High Explosive Verification Requirements.
(2)Mock High Explosive Two-Person Concept Verification Requirements.
(1)Live Pit Introduction Sequence.
c. Inert Nuclear Explosive-Like Assemblies.
(1)Mock High Explosive Verification Requirements.
(2)High-Fidelity Dummy Pit Verification Requirements.
(1)Live Pit Introduction Sequence.
c. Inert Nuclear Explosive-Like Assemblies.
(1)Mock High Explosive Verification Requirements.
(2)High-Fidelity Dummy Pit Verification Requirements.
5. OFFSITE TRANSPORTATION OF NUCLEAR EXPLOSIVE-LIKE ASSEMBLIES.
a. Inert-with-Live-Pit NELA Transfer Restriction.
b. Identification Requirements.
c. Permission to Ship Between NNSA Sites.
d.Nuclear Explosive-Like Assembly Survey Before Transfer.
e.Nuclear Explosive-Like Assembly Survey Upon Receipt.
ATTACHMENT 5. MARKING REQUIREMENTS
1. PERMANENT MARKING LEGENDS.
a. Nuclear Explosives.
b. Nuclear Explosive-Like Assemblies.
2. PERMANENT MARKING LOCATION.
3. PERMANENT MARKINGS.
4. PERMANENT MARKING OBLITERATION.
a.Methodology.
b.Components That Will Be Reassembled.