DOE O 452.2D, Nuclear Explosive Safety
Functional areas: Defense Nuclear Facility Safety and Health Requirement, Nuclear Weapons Programs, Requires Crosswalk When Revised, Safety and Security
This Order establishes requirements to implement the nuclear explosive safety elements of DOE O 452.1D, Nuclear Explosive and Weapon Surety Program, for routine and planned nuclear explosive operations.
Cancels DOE O 452.2C. Admin Chg 1, 7-10-13
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE O 452.2D Admin Chg 1Nuclear Explosive Safety (Jul 10, 2013)
Related documents
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov National Nuclear Security Administration
U.S. Department of Energy ORDER
Washington, D.C.
Approved: 4-14-09
SUBJECT: NUCLEAR EXPLOSIVE SAFETY
1. PURPOSE. This Department of Energy (DOE) Order establishes requirements to
implement the nuclear explosive safety (NES) elements of DOE O 452.1D, Nuclear
Explosive and Weapon Surety Program, for routine and planned nuclear explosive
operations (NEOs).
2. CANCELLATION. DOE O 452.2C, Nuclear Explosive Safety, dated 06-12-06.
Cancellation of a directive does not, by itself, modify or otherwise affect any contractual
obligation to comply with the directive. Contractor requirements documents (CRDs) that
have been incorporated into or attached to a contract remain in effect until the contract is
modified to either eliminate requirements that are no longer applicable or substitute a
new set of requirements.
3. APPLICABILITY.
a. Departmental Elements. Except for the exclusion in paragraph 3c, this Order
applies to all those Departmental elements that are involved in performing,
managing, overseeing, or directly supporting NEOs or associated activities,
including those created after the Order is issued. (Go to
http://www.directives.doe.gov/pdfs/reftools/org-list.pdf for the most current
listing of Departmental elements.)
The Administrator will ensure that NNSA employees and contractors comply with
their respective responsibilities under this Order. Nothing in this Order shall be
construed to interfere with the NNSA Administrator’s authority under section
3212(d) of Public Law (P.L.) 106-65 to establish Administration-specific policies,
unless disapproved by the Secretary.
b. DOE Contractors.
(1) Except for the exclusions in paragraph 3c, the Contractor Requirements
Document (CRD), Attachment 1, sets forth requirements of this Order that
will apply to contracts that include the CRD.
(2) This CRD must be included in all contracts that involve performing,
managing, overseeing, or directly supporting NEOs or associated
activities.
(3) Site office managers are responsible for notifying contracting officers of
which contracts are affected. Once notified, contracting officers are
responsible for incorporating the CRD into each affected contract.
DOE O 452.2D
https://www.directives.doe.gov/references/DOEDepartmentalElements.pdf
2 DOE O 452.2D
4-14-09
c. Exclusions.
(1) This Order does not apply to unplanned events. DOE M 231.1-2,
Occurrence Reporting and Processing of Operations Information, dated
8-19-03, provides requirements for categorizing and reporting
non-emergency NES occurrences. DOE O 151.1C, Comprehensive
Emergency Management, dated 11-02-05, provides requirements for
categorizing and reporting emergency NES occurrences. The senior
energy official, or higher authority, will determine when to transition from
emergency management directives to this Order.
(2) The following Departmental elements are excluded: Office of the Chief
Financial Officer, Office of the Chief Information Officer, Office of
Civilian Radioactive Waste Management, Office of Congressional and
Intergovernmental Affairs, Office of Economic Impact and Diversity,
Energy Information Administration, Office of Electricity Delivery and
Energy Reliability, Office of Energy Efficiency and Renewable Energy,
Office of Environmental Management, Office of Fossil Energy, Office of
Hearings and Appeals, Office of Human Capital Management, Office of
Section 2
Intelligence and Counterintelligence, Office of Legacy Management,
Office of Management, Office of Nuclear Energy, Office of Policy and
International Affairs, Office of Public Affairs, Office of Science,
Bonneville Power Administration, Southeastern Power Administration,
Southwestern Power Administration, and Western Area Power
Administration.
(3) In accordance with the responsibilities and authorities assigned by
Executive Order 12344, codified at 50 USC sections 2406 and 2511 and to
ensure consistency through the joint Navy/DOE Naval Nuclear Propulsion
Program, the Deputy Administrator for Naval Reactors (Director) will
implement and oversee requirements and practices pertaining to this
Directive for activities under the Director's cognizance, as deemed
appropriate.
4. REQUIREMENTS
a. Nuclear Explosive Safety Program. NEOs require special consideration because
of the potentially unacceptable consequences of an accident or unauthorized act.
The NES program outlined in this section supports the requirement that NEOs
must be designed and conducted in a manner that meets the NES Standards of
DOE O 452.1D or successor directive. It includes the following: NES Rules
(general and supplemental NESRs), formal NES evaluations, fundamental NEO
process requirements (procedures, facilities, equipment, and people),
requirements for onsite and offsite transportation (mobile NEOs), sustaining
requirements (positive verification, change control and configuration
management), requirements for nuclear explosive-like assemblies (NELAs), and
permanent marking of nuclear explosives and NELAs.
DOE O 452.2D 3
4-14-09
(1) General Nuclear Explosive Safety Rules (NESRs). The general NESRs set
forth in this paragraph are mandatory for all NEOs.
(a) Nuclear Explosive Safety Evaluation. NEOs must not be
performed until a NES study (NESS) has been conducted, the
NESS has been approved, and approved pre-start findings have
been closed.
(b) Nuclear Explosive Operating Procedures. NEOs must be
performed in accordance with approved written procedures.
(c) One-Point Safety.
1 NEOs involving a nuclear explosive not certified to be
one-point safe must be conducted only at Nevada Test Site
(NTS), except as authorized in accordance with paragraph
4a(1)(c)2, below.
2 If it is determined that a nuclear explosive no longer meets
the one-point safety criteria, all assembly/disassembly
production plant operations (including onsite
transportation) and offsite transportation with that nuclear
explosive must be discontinued in a safe manner. Before
operations with that nuclear explosive can be resumed, a
path forward must be developed, a NES evaluation must be
conducted, the NES evaluation report must be approved,
and approved pre-start findings must be closed.
3 Tooling and equipment must be evaluated as required to
ensure that their use does not cause a one-point safety
violation of a nuclear explosive certified to be one-point
safe.
(d) Nuclear Explosive Areas (NEAs).
1 Authorized energy sources must be identified and
documented. Unauthorized energy sources must not be
available in an NEA during NEOs.
2 Ignition sources in NEAs must be identified and eliminated
or minimized and controlled to prevent adverse interaction
with combustible/flammable materials and the nuclear
explosive.
3 Combustible and flammable materials in NEAs must be
identified and eliminated or minimized and controlled to
Section 3
prevent adverse interaction with the nuclear explosive.
4 DOE O 452.2D
4-14-09
(e) Electrical Testing. Except as authorized in accordance with
paragraph 4a(1)(f), Anomalous Units, nuclear explosives must not
be subjected to—
1 redundant electrical tests or
2 electrical troubleshooting (i.e., to confirm the existence of a
fault or aid in fault isolation) except with authorized test
equipment and procedures that have been subjected to a
NES evaluation and found to be acceptable for the specific
application.
(f) Anomalous Units.
1 If it is determined that a nuclear explosive is no longer in a
condition covered by a NES evaluation, all operations with
that nuclear explosive and in the associated facility must be
discontinued in a safe manner, resulting in a safe and stable
nuclear explosive configuration.
2 Before operations with the anomalous unit can be resumed,
a design agency special instruction engineering release
(SIER) must be developed, and the NEO change control
process must be completed in accordance with paragraph
4a(13).
a The responsible design agencies must specifically
review the SIER for impact on NES.
b Transportation operations, if applicable, must be
specifically addressed in the SIER, and offsite
transportation operations are subject to the Office of
Secure Transportation (OST) NEO change control
process.
3 A decision to resume other activities in the facility must
include consideration of possible interactions with the
anomalous unit.
(2) Supplemental Nuclear Explosive Safety Rules. Supplemental NESRs may
be developed as needed to support specific tests, operations, or
characteristics of a nuclear explosive.
(3) Nuclear Explosive Safety Evaluations. NES evaluations are required
before a NEO is authorized; periodically for ongoing NEOs; and when
proposed changes or emerging information affect an approved NEO. NES
DOE O 452.2D 5
4-14-09
evaluations must be performed in accordance with DOE M 452.2-2,
Nuclear Explosive Safety Evaluation Processes, or successor directive.
(4) Procedures. Written procedures (paper or electronic) control the
interactions among the nuclear explosive, the operating facility,
equipment, and personnel.
(a) Design agencies must review and concur with original issues of
procedures for NEOs and associated activities.
(b) All written procedures for NEOs must place proper emphasis on
preventing accidents and detecting abnormal conditions by
accomplishing the following.
1 Comply with design specifications and technical
requirements.
2 Clearly state cautions and warnings.
3 Identify appropriate points to interrupt work safely.
4 Include generic contingency procedures directed toward
quickly achieving a safe and stable nuclear explosive
configuration to be applied in response to all unexpected
situations not covered by other written procedures.
5 Incorporate human factors considerations.
(5) Two-Person Concept. DOE M 452.2-1A, Nuclear Explosive Safety
Manual, requires organizations responsible for NEOs and associated
activities and facilities to establish and implement the two-person concept.
(6) Facilities. Facilities used for nuclear explosive operations must be
characterized, evaluated, and specifically approved for that use.
(7) Equipment. Organizations responsible for NEOs and associated activities
and facilities must verify that all equipment used in NEOs (including
tooling, testers, and other mechanical and electrical equipment) meet the
Section 4
following requirements. DOE M 452.2-1A, Nuclear Explosive Safety
Manual, or successor directive, specifies additional requirements for
electrical equipment used in NEAs.
(a) Design specifications and technical requirements must be
documented.
(b) Designs must ensure nuclear explosives will remain in a safe
condition should a system or component of the tool/equipment fail.
6 DOE O 452.2D
4-14-09
(c) Each item used in an NEO must be specifically approved for that
operation. Unapproved movable items must be excluded from the
NEA. Positive measures must be used to preclude use of facility
equipment that is not approved for the NEO and impracticable to
remove.
(d) Equipment intended to apply energy to a nuclear explosive must
incorporate features that limit energy to a known safe level.
(8) Maintenance of Facilities, Tooling, and Other Equipment. Organizations
responsible for NEOs and associated activities and facilities must review
maintenance programs and activities for impact on NES. Maintenance
implementation plans must include a detailed description of maintenance
activity control and approval, including limitations on materials that are
allowed in NEAs.
(9) Personnel. Each organization responsible for and/or involved in NEOs and
associated activities must implement training, qualification, and
certification programs for personnel that manage, oversee, perform, or
directly support these operations and activities.
In addition to the requirements in 10 CFR Part 712, Human Reliability
Program, and DOE O 5480.20A, Personnel Selection, Qualification, and
Training Requirements for DOE Nuclear Facilities, annual training for
personnel assigned to nuclear explosive duty must include the following
NES-specific topics.
(a) Responsibilities associated with custody of nuclear explosives.
(b) Use of general and supplemental NESRs, site/facility and
program-specific Technical Safety Requirements, and other
controls associated with NEOs.
(c) The purpose, objective, and responsibilities of the two-person
concept for operations.
(d) Explosive safety appropriate for assigned responsibilities.
(10) Transportation of Nuclear Explosives.
(a) Organizations responsible for NEOs and associated activities and
facilities must establish requirements and procedures to ensure safe
onsite transportation of nuclear explosives.
(b) Offsite transportation of nuclear explosives is performed by OST
and begins when the loaded conveyance is closed and ends with
the opening of the conveyance at its destination.
DOE O 452.2D 7
4-14-09
(c) Transportation operations and shipping configurations, including
all items in the conveyance, are subject to the NES evaluation
requirements of paragraph 4a(1)(a) and 4a(3).
1 Nuclear explosives must be transported in conveyances
specifically reviewed and approved through the NES
evaluation process.
2 Criteria must be established for protecting nuclear
explosives during transportation. The criteria and tie-down
designs for specific nuclear explosive configurations must
be reviewed and approved through the NES evaluation
process.
(11) Mixed Venues. Nuclear explosives must not be transported or staged with
any other assembly that could be mistaken for a nuclear explosive.
(12) Positive Verification.
(a) Organizations responsible for NEOs and associated activities and
facilities must develop and implement a verification process to
ensure use of qualified personnel who are fit for duty,
Section 5
operationally ready facilities, correct equipment that is current in
any required calibration and preventive maintenance, and current
approved procedures.
(b) The configuration and condition of a nuclear explosive and its
safety features must be known or determined as early as practical
during any planned NEO.
(13) Change Control. Organizations responsible for NEOs and associated
activities and facilities must establish and implement a NES change
evaluation process in accordance with DOE M 452.2-2, Nuclear Explosive
Safety Evaluation Processes, or successor directive. This NES evaluation
is separate and independent from the unreviewed safety question process
required by 10 CFR Part 830, Nuclear Safety Management, and must be
completed before approval and implementation of the change.
All proposed changes to authorized NEOs, including the following, are
subject to the NEO change control process.
(a) Proposals that may have direct NES implications (e.g., procedural,
equipment, or facility changes to an approved NEO).
(b) Proposals that may have indirect NES implications (e.g., changes
or new activities that could impact the foundation established by
previous NES Master Studies).
8 DOE O 452.2D
4-14-09
(c) Changes in knowledge affecting an approved NEO (e.g., new
understanding of a potential threat to NES or new data regarding
the response of a nuclear explosive to a stimulus).
(14) Configuration Management.
(a) Organizations responsible for NEOs and associated activities and
facilities must develop and implement a configuration management
program incorporating elements applicable to NEOs and associated
activities and facilities.
(b) To ensure consistency with design requirements and the safety
basis, the configuration management program must specifically
include the following:
1 control of the physical configuration of a nuclear explosive
and its components; the tooling, equipment, and procedures
used in NEOs and associated activities; and the interface
with the facilities in which these operations and activities
are conducted;
2 unique identification of special tooling and equipment used
in NEOs;
3 positive identification of tooling and equipment requiring
calibration/testing within a calibration/testing control
program; and
4 incorporation of approved changes into all affected
documents (including design documents, drawings,
procedures, and safety basis documents) and programs
(including maintenance and training).
(15) Nuclear Explosive-Like Assemblies (NELAs).
(a) Nuclear Explosive-Like Assembly Standards. All NELA
operations must meet the following qualitative NELA standards.
1 There must be controls to minimize the possibility of
accidental/inadvertent, or deliberate unauthorized assembly
of a nuclear explosive in place of a NELA configuration.
2 There must be controls to minimize the possibility of
accidental/inadvertent, or deliberate unauthorized transfer
of a nuclear explosive in place of a NELA configuration.
(b) Nuclear Explosive-Like Assembly Requirements. Organizations
responsible for NELA operations must implement the NELA
DOE O 452.2D 9
4-14-09
requirements in accordance with DOE M 452.2-1A, Nuclear
Explosive Safety Manual, or successor directive.
(16) Marking Instructions. Nuclear explosives and NELAs must be marked to
distinguish configurations capable of a nuclear detonation from those that
are not. Organizations responsible for NEOs or NELA operations must
Section 6
implement marking requirements in accordance with DOE M 452.2-1A,
Nuclear Explosive Safety Manual, or successor directive.
b. Independent Oversight. The Office of Safety provides independent oversight of
the implementation of this Order and associated Manuals by NNSA personnel.
This oversight may be carried out through observation of NES evaluations,
independent assessments, or other appropriate mechanisms. On an annual basis,
the Office of Safety will summarize its oversight activities, along with any
recommendations for changes in the NES program in a report to the Assistant
Deputy Administrator for Nuclear Safety Operations and the Assistant Deputy
Administrator for Science, Engineering and Production Programs. A copy of this
report will be provided to the NNSA CTA and CDNS for information.
c. Exemptions. Exemptions must be requested when release is sought from a
requirement in this Order, DOE M 452.2-1A or DOE M 452.2-2, or their
successor directives. The exemption process is outlined in DOE O 251.1C,
Departmental Directives Program, dated 1-15-09, or successor directive. The
approval authority is the Deputy Administrator for Defense Programs with
concurrence from the Central Technical Authority.
d. Records. Records (documentation) must be maintained in accordance with
National Archives and Records Administration-approved DOE or site-specific
records retention and disposition schedules in accordance with DOE O 243.1,
Records Management Program, dated 2-3-06.
e. Implementation. This revision involves administrative or programmatic changes
from the previous directive, DOE O 452.2C, and an implementation plan is
required. This revision is effective upon issuance.
5. RESPONSIBILITIES.
a. Deputy Administrator for Defense Programs.
(1) Ensures implementation of NES Programs.
(2) Approves exemptions to this Order.
b. NNSA Site Office Manager. Provides oversight of the NNSA M&O Contractor.
c. Director, Office of Safety. Provides independent oversight of the implementation
of this Order and associated Manuals by NNSA personnel.
10 DOE O 452.2D
4-14-09
d. Director, Nuclear Weapons Stockpile Division.
(1) Provides federal leadership for project teams formed to develop nuclear
explosive operations at NNSA production agencies.
(2) Ensures that NNSA nuclear explosive operations are designed in a manner
that satisfies the NES Program requirements.
e. Director, Nuclear Weapon Surety and Quality Division.
(1) Manages the NNSA NES evaluation processes.
(2) Provides support to NNSA Site Offices as needed for NES oversight of the
NNSA M&O Contractors.
6. DEFINITIONS. Definitions from DOE O 452.1D, or successor directive are not repeated
here.
a. Access. The proximity to a nuclear explosive that allows the opportunity to divert,
steal, tamper with, and/or damage the nuclear explosive in spite of any controls
that have been established to prevent such unauthorized actions.
b. Custody of Nuclear Explosives. Responsibility for access to and control of
nuclear explosives.
c. Electrical Equipment. Includes items that contain or use an electrical energy
source and the interface (if any) with the nuclear explosive (NE). For Category 1
electrical equipment (as defined in DOE M 452.2-1A), this includes associated
adapters, test cables, switch boxes, etc. For some Category 2 electrical equipment
(as defined in DOE M 452.2-1A), this includes a mechanical connection to the
NE and associated electrical isolation feature.
Section 7
d. Facility. Any equipment, structure, system, process, or activity that fulfills a
specific purpose.
e. Main Charge. The high explosive whose explosive energy implodes the pit.
f. Nuclear Explosive Duty. Work assignments that allow custody of a nuclear
explosive or access to a nuclear explosive device or area.
g. Nuclear Explosive-Like Assembly (NELA). An assembly with components
representing the main charge HE and pit that has the potential for component
substitution resulting in accidental/inadvertent, or deliberate unauthorized
assembly or transfer of a nuclear explosive may be considered a NELA. A NELA
represents a nuclear explosive in the U.S. Nuclear weapons program, including
assemblies for development, testing, training, or other purposes.
DOE O 452.2D 11
4-14-09
h. Nuclear Explosive Operation Associated Activities. Activities directly associated
with a specific nuclear explosive operation, such as work on a bomb nose or tail
subassembly, even when physically separated from the bomb’s nuclear explosive
subassembly.
i. Nuclear Explosive Safety Rules (NESRs). Requirements that significantly
contribute to minimizing the possibility of nuclear detonation or high explosive
detonation/deflagration in nuclear explosive operations.
j. One-Point Safe Nuclear Explosive. A nuclear explosive that, in the event a
detonation is initiated at any one point in the high explosive system, presents no
greater probability than one in a million of producing a nuclear detonation.
k. Safety Basis. A safety basis for a DOE nuclear facility is documented in a
documented safety analysis and the hazards controls for the nuclear facility.
7. REFERENCES. The following list contains references that are relevant to this Order.
a. DOE O 151.1C, Comprehensive Emergency Management System, dated 11-2-05,
which addresses responses to unplanned events.
b. DOE O 243.1, Records Management Program, dated 2-3-06, which provides a
framework for managing information in accordance with Department policy and
National Archives and Records Administration-approved DOE record schedules.
c. DOE O 226.1A, Implementation of Department of Energy Oversight Policy, dated
7-31-07, which provides direction for implementing DOE P 226.1A, Department
of Energy Oversight Policy, dated 5-25-07, which establishes DOE policy for
assurance systems and processes established by DOE contractors and oversight
programs performed by DOE line management and independent oversight
organizations.
d. DOE M 231.1-2, Occurrence Reporting and Processing of Operations
Information, dated 8-19-03, which provides detailed requirements to supplement.
e. DOE O 231.1A, Environment, Safety, and Health Reporting, dated 8-19-03, sets
forth a minimum set of occurrence reporting requirements for DOE/NNSA
elements and contractors and includes categorizing occurrences related to safety,
environment, health, or operations; notifying DOE; and developing follow-up
reports.
f. DOE O 251.1C, Departmental Directives Program, dated 1-15-09, which details
the process for requesting exemptions from directives requirements.
g. DOE O 360.1B, Federal Employee Training, dated 10-11-01, which establishes
requirements and assigns responsibilities for DOE Federal employee training,
education, and development under the Government Employees Training Act of
1958, as amended.
12 DOE O 452.2D
4-14-09
h. DOE O 414.1C, Quality Assurance, dated 6-17-05, which ensures that the quality
Section 8
of DOE/NNSA products and services meets or exceeds the customers'
expectations.
i. DOE O 420.1B, Facility Safety, dated 12-22-05, which establishes the
DOE/NNSA facility safety for nuclear safety design, criticality safety, fire
protection, and natural phenomena hazards mitigation.
j. DOE M 440.1-1A, DOE Explosives Safety Manual, dated 1-9-06, which describes
DOE’s explosives safety requirements applicable to operations involving the
development, testing, handling, and processing of explosives or assemblies
containing explosives.
k. DOE O 452.1D, Nuclear Explosive and Weapon Surety Program, dated 4-14-09,
which establishes requirements and responsibilities for the DOE Nuclear
Explosive and Weapon Surety Program.
l. DOE M 452.2-1A, Nuclear Explosive Safety Manual, dated 4-14-09, which
establishes mandatory procedures in selected topical areas to ensure the nuclear
explosive safety of all nuclear explosive operations conducted by DOE/NNSA
and its contractors.
m. DOE M 452.2-2, Nuclear Explosive Safety Study Processes, dated 4-14-09, which
provides requirements and guidance for nuclear explosive safety studies,
operational safety reviews, and nuclear explosive safety change evaluations.
n. DOE O 5480.20A Chg 1, Personnel Selection, Qualification, and Training
Requirements for DOE Nuclear Facilities, dated 07-12-01, which establishes
selection, qualification, and training requirements for management and operating
contractor personnel involved in the operation, maintenance, and technical
support of DOE/NNSA Category A and B reactors and nonreactor nuclear
facilities.
o. DOE-STD-1073-2003, Configuration Management Program, dated October
2003, which defines the objectives of a configuration management process for
DOE nuclear facilities (including activities and operations) and provides detailed
examples and supplementary guidance on methods to achieve those objectives.
p. DOE-STD-1104-96, Review and Approval of Nuclear Facility Safety Basis
Documents (Documented Safety Analyses and Technical Safety Requirements),
dated February 1996, which describes DOE review and approval of documented
safety analyses and Technical Safety Requirements for existing Hazard Category
1, 2, and 3 nuclear facilities that document their safety basis in accordance with
10 CFR 830.
q. DOE-STD-3009-94, Preparation Guide for U.S. Department of Energy
Nonreactor Nuclear Facility Documented Safety Analyses, dated July 1994,
DOE O 452.2D 13 (and 14)
4-14-09
which describes a Safety Analysis Report preparation method that satisfies 10
CFR 830 requirements.
r. DOE-DP-STD-3016-2006, Hazard Analysis Reports for Nuclear Explosive
Operations, dated May 2006, which clarifies the requirements and provides
guidance for conducting hazard analyses and preparing Hazard Analysis Reports
for nuclear explosive operations and associated activities.
s. 10 CFR Part 712, Human Reliability Program, which establishes the policies and
procedures for the DOE, including NNSA, human reliability program (HRP). The
HRP is a security and safety reliability program designed to ensure that
individuals who occupy positions affording access to certain materials, nuclear
explosive devices, facilities, and programs meet the highest standards of
reliability and physical and mental suitability.
t. 10 CFR Part 820, Procedural Rules for DOE Nuclear Activities, which sets forth
procedures to govern the conduct of persons involved in DOE nuclear activities
Section 9
and, in particular, to achieve compliance with the DOE Nuclear Safety
Requirements by all persons subject to those requirements.
u. 10 CFR Part 830, Nuclear Safety Management, which governs the conduct of
DOE contractors, DOE personnel, and other persons conducting activities
(including providing items and services) that affect, or may affect, the safety of
DOE nuclear facilities. v. Title 32 of P.L. 106-65, the National Nuclear Security
Administration Act, dated October 5, 1999, as amended, which established a
separately organized agency within the Department of Energy.
v. Joint Department of Energy/Department of Defense (DOE/DoD) Technical
Publication 20-7, Nuclear Safety Criteria, dated 01-02-02.
w. Joint DOE/DoD Technical Publication 35-51 Chg. 10, General Instructions
Applicable to Nuclear Weapons, dated 08-14-08.
x. Joint DOE/DoD Technical Publication 45-51 Chg. 2, Transportation of Nuclear
Weapons Materiel, General Shipping and Limited Life Component Data (LLC),
dated 08-01-07.
y. Joint DOE/DoD Technical Publication 45-51A Chg. 5, Transportation of Nuclear
Weapons Materiel (Supplement), Shipping and Identification Data for Stockpile
Major Assemblies, dated 03/20/2007.
8. CONTACT. Questions concerning this Order should be addressed to the Nuclear Weapon
Surety and Quality Division, 202-586-5624.
STEVEN CHU
Secretary of Energy
DOE O 452.2D Attachment 1
4-14-09 Page 1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE O 452.2D, NUCLEAR EXPLOSIVE SAFETY
This Contractor Requirements Document (CRD) establishes the requirements for Department of
Energy (DOE) contractors, including National Nuclear Security Administration (NNSA)
contractors, whose contracts involve the performance, management, oversight, or direct support
of DOE/NNSA nuclear explosive operations (NEOs) or associated activities.
Regardless of the performer of the work, the contractor is responsible for complying with the
requirements of this CRD. The contractor is responsible for flowing down the requirements of
this CRD to subcontractors at any tier to the extent necessary to ensure the contractor’s
compliance with the requirements.
All contractors with this CRD incorporated in their contracts must comply with the following
requirements.
Nuclear Explosive Safety Program.
1. General Nuclear Explosive Safety Rules (NESRs). Contractors must ensure that NEOs
under their purview are designed and performed in a manner that satisfies the following
General NESRs.
a. Nuclear Explosive Safety Evaluation. NEOs must not be performed until a NES
study (NESS) has been conducted, the NESS report has been approved, and
approved pre-start findings have been closed.
b. Nuclear Explosive Operating Procedures. NEOs must be performed in accordance
with approved written procedures.
c. One-Point Safety.
(1) NEOs involving nuclear explosives not certified to be one-point safe must
be performed only at the Nevada Test Site (NTS), except as authorized in
accordance with paragraph 1a(3)(b) below.
(2) If it is determined that a nuclear explosive no longer meets the one-point
safety criteria, all assembly/disassembly production plant operations
(including onsite transportation) with that nuclear explosive must be
discontinued in a safe manner. Before operations with that nuclear
explosive can be resumed, a NES evaluation report must be approved, and
approved pre-start findings must be closed.
(3) Tooling and equipment must be evaluated as required to ensure that their
Section 10
use does not cause a one-point safety violation of a nuclear explosive
certified to be one-point safe.
Attachment 1 DOE O 452.2D
Page 2 4-14-09
d. Nuclear Explosive Areas (NEAs).
(a) Authorized energy sources must be identified and documented.
Unauthorized energy sources must not be available in an NEA
during NEOs.
(b) Ignition sources in NEAs must be identified and eliminated or
minimized and controlled to prevent adverse interaction with
combustible/flammable materials and the nuclear explosive.
(c) Combustible and flammable materials in NEAs must be identified
and eliminated or minimized and controlled to prevent adverse
interaction with the nuclear explosive.
e. Electrical Testing. Except as authorized in accordance with paragraph 1a(6),
Anomalous Units, nuclear explosives must not be subjected to —
(1) redundant electrical tests, or
(2) electrical troubleshooting (i.e., to confirm the existence of a fault or aid in
fault isolation) except with authorized test equipment and procedures that
have been subjected to a NES evaluation and found to be acceptable for
the specific application.
f. Anomalous Units.
(1) If it is determined that a nuclear explosive is no longer in a condition
covered by a NES evaluation, all operations with that nuclear explosive
and in the associated facility must be discontinued in a safe manner,
resulting in a safe and stable nuclear explosive configuration.
(2) Before operations with the anomalous unit can be resumed, a design
agency special instruction engineering release (SIER) must be developed
and the NEO change control process must be completed in accordance
with paragraph 1m.
(a) The responsible design agencies must specifically review the SIER
for impact on NES.
(b) Transportation operations, if applicable, must be specifically
addressed in the SIER, and offsite transportation operations are
subject to the Office of Secure Transportation (OST) NEO change
control process.
(3) A decision to resume other activities in the facility must include
consideration of possible interactions with the anomalous unit.
DOE O 452.2D Attachment 1
4-14-09 Page 3
2. Supplemental Nuclear Explosive Safety Rules. Contractors may propose supplemental
NESRs to support specific tests, operations, or characteristics of a nuclear explosive.
3. Nuclear Explosive Safety Evaluations. Contractors must ensure that all NEOs under their
purview are covered by an approved NES evaluation and request and support NES
evaluations as needed. NES evaluation requirements are specified in DOE M 452.2-2,
Nuclear Explosive Safety Evaluation Processes, or successor directive.
4. Procedures.
a. Contractors responsible for NEOs and associated activities and facilities must
follow approved written procedures (paper or electronic) for all NEOs to control
interactions among the nuclear explosive, the operating facility, equipment, and
personnel.
b. Contractors must ensure design agency concurrence with original issues of
procedures for NEOs and associated activities.
c. Proposed changes to procedures must be assessed by the contractor NEO change
control process.
d. Contractors must ensure NEO procedures place the proper emphasis on
preventing accidents and detecting abnormal conditions by accomplishing the
following—
(1) comply with design specifications and technical requirements,
(2) clearly state cautions and warnings,
(3) identify appropriate points to safely interrupt work,
Section 11
(4) include generic contingency procedures directed toward quickly achieving
a safe and stable nuclear explosive configuration to be applied in response
to all unexpected situations not covered by other written procedures, and
(5) incorporate human factors considerations.
5. Two-Person Concept. Contractors responsible for NEOs and associated activities and
facilities must establish and implement the two-person concept in accordance with DOE
M 452.2-1A, Nuclear Explosive Safety Manual, or successor directive, to ensure no lone
individual has access to a nuclear explosive.
6. Facilities. Contractors must ensure that facilities used for nuclear explosive operations are
characterized, evaluated, and specifically approved for that use.
7. Equipment. Contractors responsible for NEOs and associated activities and facilities must
ensure that all equipment used in NEOs (including tooling, testers, and other mechanical
and electrical equipment) meet the following requirements. DOE M 452.2-1A, Nuclear
Attachment 1 DOE O 452.2D
Page 4 4-14-09
Explosive Safety Manual, or successor directive, specifies additional requirements for
electrical equipment used in NEAs.
a. Design specifications and technical requirements are documented.
b. Designs must ensure that the nuclear explosive remains in a safe condition should
a system or component of the equipment fail.
c. Each item used in an NEO must be specifically approved for that operation.
Unapproved movable items must be excluded from the NEA. Positive measures
must be used to preclude use of facility equipment that is not approved for the
NEO and impracticable to remove.
d. Equipment intended to apply energy to a nuclear explosive must incorporate
features that limit energy to a known safe level.
8. Maintenance of Facilities, Tooling, and Other Equipment. Contractors responsible for
NEOs and associated activities and facilities must review maintenance programs and
activities for impact on NES. Maintenance implementation plans must include a detailed
description of maintenance activity control and approval, including limitations on
materials that are allowed in NEAs.
9. Personnel. Contractors responsible for and/or involved in NEOs and associated activities
must implement training, qualification, and certification programs for personnel that
manage, oversee, perform, or directly support these operations and activities.
In addition to the requirements referenced in 10 CFR 712 and DOE O 5480.20,
contractors must provide annual training for personnel assigned to nuclear explosive duty
that includes the following NES-specific topics.
a. Responsibilities associated with custody of nuclear explosives.
b. Use of general and supplemental NESRs, site/facility and program specific
Technical Safety Requirements, and other controls associated with NEOs.
c. The purpose, objective, and responsibilities of the two-person concept for
operations.
d. Explosive safety appropriate for assigned responsibilities.
10. Transportation of Nuclear Explosives.
a. Contractors responsible for NEOs and associated activities and facilities must
establish requirements and procedures to ensure safe onsite transportation of
nuclear explosives.
DOE O 452.2D Attachment 1
4-14-09 Page 5
b. Transportation operations and shipping configurations, including all items in a
conveyance, are subject to the NES evaluation requirements of paragraph 1a(1)
and 1c of this CRD.
Section 12
(1) Contractors must ensure nuclear explosives are transported in conveyances
specifically reviewed and approved through the NES evaluation process.
(2) Contractors must ensure appropriate criteria are established for protecting
nuclear explosives during transportation. Contractors must ensure the
criteria and tie-down designs for specific nuclear explosive configurations
are reviewed and approved through the NES evaluation process.
11. Mixed Venues. Contractors responsible for NEOs must not transport or stage nuclear
explosives with any other assembly that could be mistaken for a nuclear explosive.
12. Positive Verification.
a. Contractors responsible for NEOs and associated activities and facilities must
develop and implement a verification process to ensure use of qualified personnel
who are fit for duty, operationally ready facilities, correct equipment that is
current in any required calibration and preventive maintenance, and current
approved procedures.
b. Contractors must ensure the configuration and condition of a nuclear explosive
and its safety features are known or determined as early as practical during any
planned NEO.
13. Change Control. Contractors responsible for NEOs and associated activities and facilities
must establish and implement a NES change evaluation process in accordance with DOE
M 452.2-2, or successor directive. This NES evaluation is separate and independent from
the USQ process required by 10 CFR Part 830, Nuclear Safety Management, and must be
completed before approval and implementation of the change.
Contractors must ensure that their change control process captures all proposed changes
to approved NEOs including the following:
a. Proposals that may have direct NES implications (e.g., procedural, equipment, or
facility changes to an approved NEO).
b. Proposals that may have indirect NES implications (e.g., changes or new activities
that could impact the foundation established by previous NES Master Studies).
c. Changes in knowledge affecting an approved NEO (e.g., new understanding of a
potential threat to NES or new data regarding the response of a nuclear explosive
to a stimulus).
14. Configuration Management. Contractors responsible for NEOs and associated activities
and facilities must develop and implement a configuration management program
Attachment 1 DOE O 452.2D
Page 6 4-14-09
incorporating elements applicable to NEOs and associated activities and facilities. To
ensure consistency with design requirements and the safety basis, the configuration
management program must specifically include the following:
a. control of the physical configuration of a nuclear explosive and its components;
the tooling, equipment, and procedures used in NEOs and associated activities;
and the interface with the facilities in which these operations and activities are
conducted;
b. unique identification of special tooling and equipment used in NEOs;
c. positive identification of tooling and equipment requiring calibration/testing
within a calibration/testing control program; and
d. incorporation of approved changes into all affected documents (including design
documents, drawings, procedures, and safety basis documents) and programs
(including maintenance and training).
15. Nuclear Explosive-Like Assemblies (NELAs).
a. Nuclear Explosive-Like Assembly Standards. Contractors responsible for NELA
operations must ensure those operations meet the following qualitative NELA
Section 13
standards.
(1) There must be controls to minimize the possibility of
accidental/inadvertent, or deliberate unauthorized assembly of a nuclear
explosive in place of a NELA configuration.
(2) There must be controls to minimize the possibility of
accidental/inadvertent, or deliberate unauthorized transfer of a nuclear
explosive in place of a NELA configuration.
b. Contractors responsible for NELA operations must implement the NELA
requirements in accordance with DOE M 452.2-1A, Nuclear Explosive Safety
Manual, or successor directive.
16. Marking Instructions. Nuclear explosives and NELAs must be marked to distinguish
configurations capable of a nuclear detonation from those that are not. Contractors
responsible for NEOs or NELA operations must permanently mark nuclear explosives
and NELAs in accordance with the instructions in DOE M 452.2-1A, Nuclear Explosive
Safety Manual or successor directive.
17. Records. Contractors must maintain records (documentation) in accordance with National
Archives and Records Administration-approved DOE or site-specific records retention
and disposition schedules (See CRD to DOE O 243.1, Records Management Program,
dated 2-3-06 or successor directive).