DOE O 433.1C, Maintenance Management Program for DOE Nuclear Facilities
The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1 2 and 3
Supersedes:
Version history and related documents
Supersedes
Earlier documents this one replaced.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov Office of Environment, Health, Safety and Security
U.S. Department of Energy ORDER
Washington, D.C.
Approved: 08-05-2026
SUBJECT: MAINTENANCE MANAGEMENT PROGRAM FOR DOE
NUCLEAR FACILITIES
1. PURPOSE. Federal Regulations (CFR) § 830.204(b)(5) for maintenance and the reliable
performance of structures, systems, and components (SSCs) that are part of the safety
basis required by 10 CFR § 830.202, Safety Basis, at Hazard Category 1, 2 and 3
Department of Energy (DOE) nuclear facilities.
2. CANCELS/SUPERSEDES. DOE O 433.1B, Maintenance Management Program for
DOE Nuclear Facilities, dated March 12, 2013. Cancellation of a directive does not, by
itself, modify or otherwise affect any contractual or regulatory obligation to comply with
the Directive. Contractor Requirements Documents (CRDs) that have been incorporated
into a contract remain in effect throughout the term of the contract unless and until the
contract or regulatory commitment is modified to either eliminate requirements that are
no longer applicable or substitute a new set of requirements.
3. APPLICABILITY.
a. Departmental Applicability. This Order applies to all DOE elements involved in
the maintenance of DOE Hazard Category 1, 2, and 3 nuclear facilities and
automatically applies to DOE elements created after it is issued. This includes
both government-owned and government-operated (GOGO) and
government-owned and contractor-operated (GOCO) nuclear facilities.
The Administrator of the National Nuclear Security Administration (NNSA) must
ensure that NNSA employees comply with their respective responsibilities under
this Directive. Nothing in this Directive will be construed to interfere with the
NNSA Administrator’s authority under section 3212(d) of Public Law
(P.L.) 106-65, National Defense Authorization Act for Fiscal Year 2000, to
establish Administration-specific policies, unless disapproved by the Secretary.
b. DOE Contractors. Except for the equivalencies/exemptions in paragraph 3.c., the
CRD, Attachment 1, sets forth requirements of this Order that will apply to
contracts that include the CRD. The CRD requirements apply to all contractors
responsible for managing and maintaining DOE-owned or -leased Hazard
Category 1, 2, and 3 nuclear facilities. Contractors must comply with the
requirements listed in the CRD to the extent set forth in their contracts.
DOE O 433.1C
2 DOE O 433.1C
08-05-2026
c. Equivalencies/Exemptions for DOE O 433.1C. Equivalencies and exemptions to
this Order are processed in accordance with DOE O 251.1, Departmental
Directives Program, current version. Concurrence by the Central Technical
Authority (CTA) or designee is required for both exemptions and equivalencies to
this Order for nuclear facilities.
(1) Equivalency. In accordance with the responsibilities and authorities
assigned by Executive Order 12344, Naval Nuclear Propulsion Program,
codified at 50 U.S.C. §§ 2406, Deputy Administrator for Naval Reactors,
and 2511, Naval Nuclear Propulsion Program, and to ensure consistency
through the joint Navy/DOE Naval Nuclear Propulsion Program, the
Deputy Administrator for Naval Reactors (Director) will implement and
oversee requirements and practices pertaining to this Directive for
activities under the Director’s cognizance, as deemed appropriate.
(2) Exemption. This Order does not apply to those portions of the
nuclear facility maintenance programs that are subject to regulation by
other federal agencies such as the United States (U.S.) Nuclear
Regulatory Commission.
Section 2
(3) Exemption. This Order does not apply to the Bonneville Power
Administration (BPA), in accordance with S1-DEL-BPA1-2016,
Delegation to the Administrator and Chief Executive Officer of
Bonneville Power Administration, dated August 12, 2016, to the BPA
Administrator and Chief Executive Officer.
4. REQUIREMENTS. DOE Guide (G) 433.1-1, Nuclear Facility Maintenance
Management Program Guide for Use with DOE O 433.1, current version, provides
acceptable examples of approaches for meeting the requirements of this Order.
DOE G 433.1-1 references federal regulations, DOE Directives, and industry best
practices using a graded approach regarding implementation of requirements for
maintaining DOE-owned government property. Graded approach is defined in
10 CFR § 830.3, Definitions, and guidance for applying it is provided in DOE G 433.1-1.
a. All Hazard Category 1, 2, or 3 nuclear facilities, as defined in DOE-Standard
(STD)-1027-2018, Chg. 1, dated January 2019, must conduct all maintenance of
SSCs that are part of the safety basis in compliance with a Nuclear Maintenance
Management Program (NMMP) through tailored application (e.g., graded
approach) of the requirements.
b. NMMPs for GOCO facilities must demonstrate compliance with the requirements
contained in the CRD of this Order (Attachment 1). NMMPs for GOGO facilities
must demonstrate compliance with the requirements contained in Attachment 2.
DOE O 433.1C 3
08-05-2026
c. Changes to NMMPs must be reviewed under the unreviewed safety question
(USQ) process to ensure that SSCs are maintained and operated within the
approved safety basis, as required by 10 CFR § 830, Subpart B, Safety Basis
Requirements. Changes that would result in a USQ must be approved prior to the
change taking effect.
d. Assessments of NMMP implementation should be conducted in accordance with
DOE O 226.1, Implementation of Department of Energy Oversight Policy, current
version, to evaluate whether all CRD requirements are appropriately
implemented. Periodic self-assessments in accordance with DOE O 226.1 should
be conducted to evaluate the effectiveness of oversight of NMMPs.
e. A single maintenance program may be used to address the requirements of this
Order and the requirements of DOE O 430.1, Real Property Asset Management,
current version.
f. Full implementation of the requirements in this Order must be accomplished
within 1 year of its issuance, unless a different implementation schedule is
approved by the Secretarial Officer with concurrence of the CTAs.
5. RESPONSIBILITIES.
a. Secretarial Officers, including NNSA Administrator and Deputy Administrator
for Defense Programs.
(1) Ensure that the requirements of this Order are implemented for facilities,
activities, or programs under their cognizance.
(2) For GOGO activities under their cognizance, approve or designate the
approval authority for NMMP documentation prepared in accordance with
the CRD (Attachment 1).
(3) Ensure that contractors conduct maintenance of SSCs in accordance with a
DOE/NNSA-approved NMMP.
(4) Review and approve requests for equivalencies and exemptions from
requirements of this Order after resolving comments in accordance with
DOE O 251.1, current version.
(5) Ensure that Field Office Managers notify Contracting Officers when
contracts are affected by this Order.
b. Central Technical Authorities.
(1) Concur with decisions regarding applicability of CRDs related to this
Order, in accordance with DOE O 410.1, Central Technical Authority
Responsibilities Regarding Nuclear Safety Requirements, current version.
Section 3
4 DOE O 433.1C
08-05-2026
(2) Concur with exemptions and equivalencies to this Order for
nuclear facilities.
c. Field Office Managers (including NNSA).
(1) Ensure that maintenance activities and programs at Hazard Category 1, 2,
and 3 nuclear facilities under their purview are conducted in compliance
with the requirements of this Order.
(2) Ensure that sufficient resources are requested to meet the requirements of
this Order and to ensure that safety SSCs are sufficiently maintained to
perform their assigned safety function.
(3) Ensure that the requirements of this Order are incorporated into contracts,
subcontracts, and support services contracts for Hazard Category 1, 2, and
3 nuclear facilities, as appropriate.
(4) Notify Contracting Officers when contracts are affected by this Order.
(5) Review and approve NMMP program description documentation that
demonstrates compliance with the CRD, Attachment 1, with Specific
Requirements found in the sources listed in section 7, below.
(6) Conduct comprehensive self-assessments and assessments of contractor
maintenance management programs as specified in section 4.
d. Contracting Officers.
(1) For all applicable contracts and upon notification that a site/facility
management contract is affected by this Order, the Contracting Officers
shall incorporate the requirements into the affected contract(s) via the
“Laws, Regulations, and DOE Directives” clause of the contract, or
through negotiation and modification, as appropriate.
6. INVOKED STANDARDS. This Order does not invoke any DOE technical standards or
industry standards as required methods. Any technical standard or industry standard that
is mentioned in or referenced by this Order is not invoked by this Order. Note:
DOE 251.1D, Appendix J, provides a definition for “invoked technical standard.”
7. REFERENCES.
a. Title XXXII, National Nuclear Security Administration Act, of P.L. 106-65,
as amended, established a separately organized agency within the Department
of Energy.
b. 10 CFR § 830, Nuclear Safety Management; Subpart A, “Quality
Assurance Requirements.”
DOE O 433.1C 5
08-05-2026
c. 10 CFR § 830, Nuclear Safety Management; Subpart B, “Safety
Basis Requirements.”
d. 10 CFR § 835, Occupational Radiation Protection.
e. 10 CFR § 850, Chronic Beryllium Disease Prevention Program.
f. 10 CFR § 851, Worker Safety and Health Program.
g. 48 CFR § 970.5223-1, “Integration of Environment, Safety and Health into Work
Planning and Execution.”
h. Executive Order 12344, “Naval Nuclear Propulsion Program.”
i. DOE O 226.1, Implementation of Department of Energy Oversight Policy,
current version.
j. DOE O 227.1, Independent Oversight Program, current version.
k. DOE O 251.1, Departmental Directives Program, current version.
l. DOE O 410.1, Central Technical Authority Responsibilities Regarding Nuclear
Safety Requirements, current version.
m. DOE O 414.1, Quality Assurance, current version.
n. DOE O 420.1, Facility Safety, current version.
o. DOE O 422.1, Conduct of Operations, current version.
p. DOE O 426.2, Personnel Selection, Training, Qualification, and Certification
Requirements for DOE Nuclear Facilities, current version.
q. DOE G 424.1-1, Implementation Guide for Use in Addressing Unreviewed Safety
Question Requirements, current version.
r. DOE O 430.1, Real Property Asset Management, current version.
s. DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for
Use with DOE O 433.1B, current version.
Section 4
t. DOE O 440.1, Worker Protection Program for DOE (Including the National
Nuclear Security Administration) Federal Employees, current version.
u. DOE G 450.4-1, Integrated Safety Management System Guide, current version.
v. DOE O 450.2, Integrated Safety Management, current version.
6 DOE O 433.1C
08-05-2026
w. DOE O 458.1, Radiation Protection of the Public and the Environment, current
version.
x. DOE-STD-1027-2018, Chg 1, Hazard Categorization of DOE Nuclear Facilities,
dated January 2019.
8. CONTACT. Questions concerning this Directive should be addressed to the Office of
Nuclear Safety, Quality Assurance and Environment at 202-586-5680.
BY ORDER OF THE SECRETARY OF ENERGY:
JAMES P. DANLY
Deputy Secretary
DOE O 433.1C Attachment 1 – CRD, Contractors Only
08-05-2026 Page 1-1
ATTACHMENT 1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE O 433.1C, MAINTENANCE MANAGEMENT PROGRAM FOR
DOE NUCLEAR FACILITIES
Contractors at Hazard Category 1, 2, and 3 nuclear facilities must comply with the requirements
listed in this Contractor Requirements Document (CRD) to the extent set forth in their contracts.
Maintenance Management Program requirements applicable to this CRD are provided in
Attachment 2. Regardless of the performer of the work, the contractor is responsible for
complying with the requirements of this CRD and flowing down CRD requirements to
subcontractors at any tier to the extent necessary to ensure contractor compliance.
The provisions of this CRD apply to Department of Energy (DOE) and National Nuclear
Security Administration (NNSA) contractors.
DOE O 433.1C Attachment 2 – Federal Employees and Contractors
08-05-2026 Page 2-1
ATTACHMENT 2
MAINTENANCE MANAGEMENT PROGRAM REQUIREMENTS FOR DOE
NUCLEAR FACILITIES
1. GENERAL REQUIREMENTS.
a. Federal and contractor organizations responsible for Hazard Category 1, 2, or 3
nuclear facilities, as defined by Department of Energy (DOE) Standard (STD)
1027-2018 Chg1, Hazard Categorization of DOE Nuclear Facilities, dated
January 2019, must develop and implement a Nuclear Maintenance Management
Program (NMMP) through tailored application (e.g., graded approach) of the
Specific Requirements in this Attachment. The definition of graded approach is
provided in Title 10 Code of Federal Regulations (CFR) § 830.3, Definitions.
The NMMP must describe the Safety Management Program for maintenance and
the reliable performance of structures, systems and components (SSCs) that are
part of the safety basis at Hazard Category 1, 2 and 3 DOE nuclear facilities.
b. Federal and contractor organizations must conduct all maintenance of SSCs that
are part of the safety basis in compliance with an approved NMMP.
c. Federal and contractor organizations must ensure that equivalencies and
exemptions from the Maintenance Management Program elements of this
Attachment are identified, formally documented with supporting justification,
and approved.
d. Federal and contractor organizations must implement the NMMP through federal
or contractor-approved documents, respectively.
e. Federal and contractor organizations must submit NMMP description
documentation to DOE/NNSA for review prior to the startup of new Hazard
Category 1, 2, and 3 nuclear facilities. NMMP description documentation must
be, at a minimum, an applicability matrix or a combination of multiple
documents. The following elements must be covered:
(1) Correlation of the Specific Requirements in this Attachment to the
applicable facilities;
Section 5
(2) Correlation of the implementing documents (procedures, work
instructions, etc.) to the Specific Requirements in this Attachment; and
(3) Documentation of the basis for applying a graded approach, if applicable.
f. Federal and contractor organizations must conduct assessments of NMMP
implementation, in accordance with DOE Policy (P) 226.1, Implementation of
Department of Energy Oversight Policy, current version and 10 CFR § 830,
Nuclear Safety Management, Subpart A, Quality Assurance Requirements.
Attachment 2 – Federal Employees and Contractors DOE O 433.1C
Page 2-2 08-05-2026
g. Federal and contractor organizations must ensure that NMMPs are identified in
the applicable documented safety analysis in accordance with 10 CFR § 830.204,
Documented Safety Analysis.
h. Federal and contractor organizations must review proposed changes to the
NMMP, which could affect the performance of safety SSCs, as part of the
ongoing unreviewed safety question (USQ) process. This review is intended to
evaluate whether safety SSCs are maintained and operated within the approved
safety basis, as required by 10 CFR § 830.203, Unreviewed Safety Question
Process. Changes that would result in a positive USQ must be submitted to the
Secretarial Officer for approval prior to the change taking effect.
2. SPECIFIC REQUIREMENTS. The NMMP must clearly address the following:
a. The NMMP must be integrated with applicable federal regulations and DOE
Directives governing nuclear safety, quality assurance, worker protection,
radiation protection, conduct of operations, and integrated safety management.
Integration requirements are determined through the facility’s safety
basis documentation.
Implementation shall be integrated with applicable documents identified in
section 7, References.
b. Maintenance Organization and Administration. The management structure that
applies sufficient resources (e.g., oversight and independent assessment,
management involvement, funding, assignment of personnel roles and
responsibilities, facilities, tools, and equipment) necessary to support the
requirements described in this Attachment and ensure integration with
other programs.
c. Planning, Scheduling, and Coordination of Maintenance. The process for
planning, scheduling, coordination, and control of maintenance activities, and
properly emphasizing equipment availability. The process must describe the
application of a System Engineer Program in the planning and execution of
maintenance activities.
d. Types of Maintenance. The process for utilization of appropriate types of
maintenance (e.g., preventive maintenance, predictive maintenance, reliability-
centered maintenance, surveillance and testing, and corrective maintenance) to
provide for safe, efficient, and reliable operation of safety SSCs.
e. Maintenance Procedures. The process for developing and implementing
documented and approved work instructions for work on safety SSCs (e.g., work
packages, procedures, work instructions, and drawings).
f. Training and Qualification. The Training and Qualification Program for
maintenance positions specified in DOE O 426.2, Personnel Selection, Training,
Qualification, and Certification Requirements for DOE Nuclear Facilities,
current version.
DOE O 433.1C Attachment 2 – Federal Employees and Contractors
08-05-2026 Page 2-3
g. Configuration Management. The incorporation of the Configuration Management
Program to control approved modifications and to prevent unauthorized
modifications to safety SSCs.
Section 6
h. Suspect and Counterfeit Items. The incorporation of the process to prevent the use
of suspect and counterfeit items into maintenance procedures and
work instructions.
i. Maintenance Tool and Equipment Control. The process for control of
maintenance tools including calibration of measuring and test equipment.
j. Maintenance History. The process for developing and maintaining documented
and retrievable maintenance history (e.g., cost data, system availability data, and
failure data) to support work planning, performance trending, analysis of
problems to determine root causes of unplanned occurrences related to
maintenance, and continuous program improvement. Tracking and trending of
deferred maintenance on safety SSCs, including aging of deferred items and risk
significance, to support resource planning and priority setting.
k. Performance Measures. Establishment and use of performance measures to assess
NMMP effectiveness, identify adverse trends, and drive corrective action.
l. Facility Condition Inspection. The process for conducting and implementing
routine assessment of facilities to identify issues related to operability,
and reliability.
m. Post-Maintenance Testing. The process for conducting post-maintenance testing
to verify that safety SSCs can perform their intended function when returned
to service.