To establ1sh administrative procedures for the certification and use of radioactive and other hazardous materials packaging by the Department of Energy (DOE).
Superseded By:
DOE O 460.1, Packaging and Transportation Safety on Sep 27, 1995
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE O 460.1Packaging and Transportation Safety (Sep 27, 1995)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
..
• CI
u.s. Department of Energy ORDER
, r',
I"
Washington, D.C.
DOE 1540.2
9-30-86
I
I
SUBJECT: HAZARDOUS MATERIAL PACKAGING FOR TRANSPORT - ADMINISTRATIVE PROCEOORES
1. PURPOSE. To establ1sh administrative procedures for the certification and use
of radioactive and other hazardous materials packaging by the Department of
Energy (DOE).
2. ~. The proviSions of this Order apply to all Departmental Elements and
contractors performing work for the Department as provided by law and/or
contract, and as impl emented by the appropri ate contracti ng officer.
3. APPLICABILIT~ The prOVisions of this Order apply to DOE employees and
management and operating contractors who are responsible for packaging,
shipping, and transporting radioactive and other hazardous materials in off
s1 te sh 1 pment ope rati ons.
4. EXCLUSIONS. Packaging for the shipment of complete nuclear explosives,
components, and speci al assembl1es 1 s excl uded from the cert1fi cation and
approval requi rements of th is Order. (See DOE 5610.1, PACKAGING AND10··'I
TRN-ISPORTHG OF NJO-EAR EXPLOSIVES, NJO-EAR COMPONENTS, N-ID SPECIALI . ASSEM3LIES. )
I 5. REFERENCES.
i
i
a. DOE 1540.1, MATERIALS TRANSPORTATION AND TRAFFIC MANN3EMENT, of 5-3-82,
which establishes policies and procedures for the management of materials
transportation activities, including traffic managemen~
b. DOE 1900.10, FEDERAL REGISTER MANN3EMENT, of 1-31-86, which outl ines
responsibilities for the administrative management of ~ederal Register"
documents, including approval, promulgation, and certification of all DOE
proposed and final rules, regulations, orders, notices, and official
documents.
c. DOE 5480.3, SAFETY REQUIREMENTS FOR THE PACKAGING AND TRN-ISPORTATION OF
HAZARDWS MATERIALS, HAZARDWS SlBSTANCES, AND HAZARDWS WASTES, of
7-9-85, which establishes safety standards for hazardous materials pack
aging and transportation.
d. DOE 5610.1, PACKAGING N-ID TRN-ISPORTING OF NUO-EAR EXPLOSIVES, NUO-EAR
COMPONENTS, AND SPECIAL ASSEMBLIES, of 9-11-79, which establishes policy
and procedures for packaging and transporting nuclear explosives, nuclear
components, and special assemblies.
o
DISTRIBUTION: INITIATED BY:
All Departmental Elements Assistant Secretary for
Defense Programs
2 DOE 1540.2
9-30-86
e. OOE 5632.1. PHYSICAL PROTECTION OF CLASSIFIED MAnER AND INFORMATION. of
7-18-79, which describes requirements for the handling of classified
information and related matter.
f. OOE 5700.6A, QUAL lTY ASSURANCE. of 8-13-81. which establi shes quality
assurance standards for OOE operation~
g. 'Uepartment of Transportation Specification 7A Packaging Certification
Documen~" of 7-1-85, which provides the certification documentation for
the compliance of 7 A packagi ng tested in accordance w 1th the Department of
Transportation (OOT) standards.
h. Title 10 Code of Federal Regulations, Part 71, '~ackaging of Radioactive
Material for Transport and Transportation of Radioactive Material Under
Certain Conditions," which establishes Nuclear Regulatory Commission (NRC)
safety standards for radioactive mater1 al packagi ng.
1. Title 10 Code of Federal Regulations, Part 871, Air Transportation of
Pl utoni um, which establi shes DOE regulations for ai r shi pments of
pl utoni um.
j. Title 41 Code of Federal Regulations, Parts 109-40, Department of Energy,
"Federal Property Management Regulations," which establi shes regulations
governing transportation and traffic managemen~
Section 2
Jk. Title 49 Code of Federal Regulations, Parts 171-179, ";azardous Mater1 al
Regulations," which prescribe DOT requirements governing the transporta
tion of hazardous materi al sin 1nterstate and foreign canmerce.
1. Army lB DOD 700-2, 'Uepartment of Defense Explosives Hazard Cl assi f1cati on
Procedures," which prescribes the Department of Defense (DOD) explosives
safety requi rement~
m. '![JOE Explosives Safety Manual," w h1ch prescri bes the safety procedures for
handling and transporting explosives (available from EH-34).
n. International Atan1c Energy Agency Safety Series No. 6. 1973 Rev is10n As
Amended, "Regulations For The Safe Transportation of Radioactive
Materials," which prescribes the international regulations for the safe
transportation of radioactive material~
o. "International Civil Aviation Organization Technical Instructions," 1985
Edition, which prescribes the international requirements for the safe
transport of hazardous materi al s by a1 r.
c
3 DOE 1540.2
9-30-86
p. "Dangerous Goods Regul at1 ons," International Ai r Transport Assoc1 at1 on,
which prescribes safety requirements for the transport of hazardous good~
6. DEFINITIONS. Definitions contained in DOE 1540.1 and DOE 5480.3 are incorpo
rated by reference; also see 10 CFR 71 and 49 CFR 100-179 for additional
rel ated def 1n1t1 ons.
a. Centralized Technical Review Office is a corps of specialists in the
necessary engineering disciplines reporting to the Headquarters Certifying
Official (herein after referred to as the Certifying Official) to perform
technical reviews of DOE Safety AnalYSis Reports for Packaging (SARP's). ,
b. DOE and NRC Certif1cate of Comp11ance is a certificate issued by DOE or
NRC, as appropriate, approving for use with specified limitations a
specific packaging for quantities of radioactive materials exceeding AI/A2
quantities as defined in DOE and NRC regulations.
c. DOE Contractor 1 s a contractor manag1 ng or operat1 ng a Government-ow ned
or -leased facility on behalf of the Department of Energy.
d. DOE Alternative is an administrative relief from DOE regulations that
meets and prov1 des equivalent heal th and safety protection.
C e. DOT Specif1cation packaging is general packaging designed to meet
requ1 rements establ1 shed by ooT for hazardous mater1 al s.
f. EQu1yalent protection are those alternate measures which will achieve a
level of safety at least equal to that specified in the regulations from
which the al ternat1ve 1 s sought. will be cons1 stent with the publiC
intent. and will provide adequate protection against the risks to life and
property.
g. Hazardous Materials is a substance or material which has been determined
by the Secretary of Transportation to be capable of posing an unreasonable
risk to health, safety, and property when transported in commerce, and
which has been so des1gnate~ These materials are listed in the Hazardous
Materials Table, 49 CFR 172.101.
h. Hazardous Substance is a material, and its mixtures or solutions, that is
identified by the letter ''E" in column 1 of the Table to 49 CFR 172.101
when offered for transportation in one package, or in one transport
vehicle if not packaged, and when the quantity of the material therein
equals or exceeds the reportable quantity (RQ). This definition does not
apply to petroleum products that are lubricants or fuels or to a mixture
or solution containing a material identified by the letter "E" in column 1
of the Table to 49 CFR 172.101 if it is in a concentration less than that
shown in Figure 1 based on the RQ specified for the materials in column 2
of the tabl e 1 n 172.101.
Section 3
4
o o
DOE 1540.2
9-30-86
RO. Pounds RO. Concentration by weight
kilograms Percent PPM
5000••••••
1000••••••
100•••••••
10...•.•..
1........ .
2270
454
45.4
4.54
0.45
10
2
0.2
0.02
0.002
100,000
20,000
2,000
200
20
Figure 1
Reportable Quantities
i. Hazardous ~ is any material that is subject to the hazardous waste
manifest requirements of the Environmental Protection Agency (EPA) as
spec1 f i ed in 40 CFR 262.
j. Certifying Official is the deSignated Headquarters official responsible for
administering the OOE program for the design review of OOE packagings and
issuance of a cert1ficate of compliance upon approval.
k. package means, for radioactive materials, the packaging together with its
radioactive contents as presented for transport
1. packaging means, for radioactive materi a1 s, the assembly of components
necessary to ensure compliance with the packaging requirements of Title 49
CFR, subpart I. It may consist of one or more receptacles, absorbent
materials, spacing structures, thermal insulation, radiation shielding,
and devices for cooling or absorbing mechanical shocks. The conveyance,
tie-down system, and auxiliary equipment may sometimes be deSignated as
part of the packaging.
m. Radioactive Mater1al is any materi al hav ing a specific activ ity greater
than 0.002 microcuries per gram ( Ci/g).
n. Safety Analysis Report for packaging is a document that provides a
comprehensive techni cal eva1 uation and revi ew of the desi gn, testi ng,
operational procedures, maintenance procedures, and quality assurance
program to demonstrate compliance with the NRC regulatory safety
standards, or equivalent standards established by the OOE for approving
packagings and issuing certificates of comp1ianc&
DOE 1540.2 5
9-30-86
7. BACKGROUND. This Order standardizes the current approval procedures to ensure
that DOE packaging designs and transportation operations provide for public
health and safety in accordance with regulations of the DOT and in accordance
with standards that are equivalent to the standards prescribed by NRC.
8. POLICY. It is Departmental policy to ensure that all packagings approved for
use in transporting radioactive and other hazardous materials meet all
appl1cabl e safety requi rements.
9. RESPONSTBILITIES.
a. Assistant Secretary for Defense programs (Dp-l).
'1) Through the D1rector of Security Eyaluations (Dp-4).
(a) Serves as the Certifying Official responsible for administering
the program for the review of DOE Safety Analysis Reports for
Radioactive Material Packagings for compliance with safety
standards and upon confirmation, issues DOE Certificates of
Canpliance.
(b) Administers the program for DOT Specification 7A certifications.
! :'" (c) Reviews applications for NRC Certificates of Canpl1ance and
I
t
(I. forwards applications to NRC as appropriate.
(d) Reviews requests for International Atan1c Energy Agency (IAEA)
Certificates of Competent Authority and forwards such requests
to the DOT.l
I
1
(e) Maintains a central records system at Headquarters for DOE and
NRC Certificates of Canpliance and lAEA Certificates of
Competent Authority.
1 (f) Develops and promulgates DOE policies and procedures for DOE
radioactive materi al s packaging certification.I .
(g) Terminates the Certificate of Compliance for a specific
packaging for any deficiency that warrants such action.
(h) Provides a central point of coordination between DOE Office of
Operational Safety (EH-34h DOT, NRC, and lAEA on the
1 nterpretat1 on of standa rds.
Section 4
(1) Assists public affairs in responding to inquiries related to
radioactive material packaging certification and serves as lead
in representing and defending DOE before other agencies on
6
o
DOE 1540.2
9-30-86 Jissues related to radioactive material packaging certifi~tion
policies.
(j) Develops and coordinates a training program for packaging
certifi cations.
(k) Distributes DOE, NRC, and IAEA certificates to Headquarters
Elements and operations offices.
(1) Maintains the Directory of DOE Certificates of Compliance for
Radioactive Material Packagings and the compliance documentation
for DOT Spec1fication 7A Type A packagings.
(2) Through the D1rectotJPf Defense Waste and Transportat1on Manage.tnt
(DP=lZ) •
(a) Provides a central pOint of coordination between OOE and
operations offices with OOT, NRC, IAEA, and other Federal
agencies concerning packaging operational matters.
(b) Develops and promulgates administrative procedures for hazardous
material packagings for transpor~
(c) Administers the classification and registration program for
explosives including the registration progr.am interface with
OOL .
(d) Assists line program managers in interpreting standards and
regulations (DOE, OOT, NRC, and IAEA) for purposes of
clarification, including interfacing with these organizations;
eval uating the need for new packaging requirementsJ and
providing guidance in the preparation of SARP's.
(e) In conjunction with responsible line program managers,
administers a program to ensure adequate documentation of
procedures and implementation of regulations involving
radioactive materials packagings; the explosives classification
and registration program interface with OOT; and coordination of
program packaging activities.
(f) Conducts appraisals involving packaging operational functions
administered by the operations offices.
(g) Plans, develops, and manages the Department-wide program for
transportation packaging operations to assure compliance with
applicable Federal and international packaging regu1at10n&
http:progr.am
7
CI
DOE 1540.2
9-30-86
(h) Provides leadership, technical guidance, and advice to other
offices of the Department regarding compliance with radioactive
and hazardous materials technical packaging standards and
regulatory requirements.
(i) Assists public affairs and DOE programs in responding to
packaging and transportation-related pub1i c or medi a i nqui ries.
(3) Through the Director of Safeguards and Security (DP-34), provides
assistance in ensuring that classified matter relating to the
packaging and transportation operations is administered in accordance
with applicable policy, Orders, and procedures.
b. Assistant Secretary for Enyironment, Safety and Health (EH-l) Through the
Director of Operational Safety (EH-~.
(1) Develops and interprets standards for radioactive and other hazardous
materials packaging.
(2) Ensures that adequate procedures consistent with applicable regula
tions, standards, and DOE Orders are developed for conducting
independent packaging design reviews.
o (3) Provides a safety and compliance overview for certification and com
pliance actions that includes a technical review and analysis of
safety considerations for the packaging and transportation of hazar
dous materi a1 s, hazardous substances, and hazardous wastes.
(4) Approves or disapproves requests for alternatives to DOE packaging
safety regul ations as requi red by DOE 5480.3
Section 5
(5) Reviews DOE requests for DOT exemptions, exemption renewals, and
party-to-exemptions (PTE), for submittal to DOT.
(6) Participates in program planning activ1ties, as requested.
(7) Conducts safety overviews covering the imp1ementat1on of DOE
packaging safety requirements, 1nc1uding NRC packaging actions; DOT
exemptions, renewals, and PTE requests; lAEA packaging actions; inde
pen,dent technical reviews for packaging compliance and certificat10n
aCtions; DOT Type 7A packaging certifications; and special form
materials certifications and related actions.
(8) Maintains central Headquarters records system for DOE alternative
actions; specification packaging actions; and DOT exemptions,
renewal s, and PTE requests.
8 DOE 1540.2
9-30-86
(9) Provides a central point of coordination with OOT, NRC, IAEA, and
other Federal agencies concerning
transportati on safety standards.
new or revised packaging and
(10) Has final authority to terminate the use of a specific packaging
based on safety deficiencies.
c. Heads of Headquarters Elements.
(1) Provide program technical guidance and assistance and resources in
ensuring that safe packaging systems are available for the transpor
tation of radioactive materials, explosives, and other hazardous
materi a1 s.
(2) Ensure that operations offices and their contractors are in com
pliance with OOEts transportation packaging policy, applicable
Orders, and regul ati ons.
d. Managers of Operations Offices.
(1) Formally implement this Order and assign staff responsibility as
necessary to accomplish its objectives.
(2) Take actions necessary to assure themselves that each SARP supports
the application for a OOE Certificate of Compliance, and so state in
the operations office transmittal letter to the Certifying Official.
(3) Provi de prelimi nary desi gn information for a proposed new packaging
design to Headquarters and other operations offices in order to give
them an opportunity to assess the potential for their us~
(4) Recommend and provide complete and accurate documentation to
designated Headquarters Elements in support of requests for the
follow ing approval s:
(a) Defense Programs (DP-4) or appropriate Headquarters program
element if serving as the applicant:
1 OOE Certificates of Compliance;
Z NRC Certificates of Compliance; and
3. IN:.A Competent Authority Certificates.
(b) Defense Programs (oP-12) with copies to EH-34: Explosives C1 ass
ft ica ti ons.
J
I o
DOE 1540.2 9
9-30-86
~ :~
Ic··1.,.
I
\
(c) Environment, Safety and Health (EH-34) with copies to OP-I2: DOT
Exemptions, Renewal s, and PTE requests.
I (5) Request EH-34 approval for alternatives to DOE regulations and
procedures, and provide to EH-34 a detailed report of the reasons why
the al ternative shoul d be granted.I
1
l
I (6) Provide documentation to OP-4 in support of OOT Specification Type
i ~ 7A actions and special form materials activities, and ensure that DOE
i, contractors comply with the applicable regulations governing these
actions and activities.
I .
I
(7) Ensure that contracts under their cognizance which involve the
packaging and transportation of radioactive materials and other
hazardous materi al s contai n prov isi ons that requi re compliance with
this Order.
(a) Suspend the use of specific packagings, when directed by EH-34,
l OP-I2, or OP-4, as appropriate.
Section 6
(9) Ensure that contractors provide documentation to the responsible
operations office verifying compliance with applicable OOT Spec1fica
tion Type 7A and Type B requi rements, and compliance with applicabl e
sped al form materi al requirements.
(10) Ensure that contractors maintain those master records of SARP's for
packagings which the contractor submits for certification, and main
tain on file copies of operating procedures for purposes of distribu
tion to other DOE users upon request.
(II) Ensure that contractors maintain complete documentation files for
each Specifi cation Type 7A, Type B, and special form materi al actions
for those packagi ngs bei ng used by the contractor.
e. Manager of Chicago Operations Office, in addition to the requirements in
subparagraph 9d, above, contracts on behalf of the Certifying Official for
establishing centralized technical support in the review and evaluation
of SARP's for DOE.
f. Managers of AlbYQuerQue and San francisco Operations Offices, in addition
to the requirements in subparagraph 9d, above:
(I) Examine, classify, and approve shipping descriptions and the hazard
cl ass for new explosives.
(2) Provide documentation to Headquarters (OP-I2) verifying that
explosive classifications conform to OOT guidelines.
o
o o
10 DOE 1540.2
9-30-86 Jg. General Counsel (GC-l) provides advice and assistance relating to
Federal, State, and local laws and regulations.
h. Aa~tant Secretary for Nuclear Energy (NE-I) Through the Deputy Assistant
Secretary for Naval Reactors (NE-60).
(1) Assume the responsibilities of operations office managers for the
Naval Reactors program.
(2) Assume the responsibilities assigned to officials in subparagraph
9a through b,above, for the Naval Reactors program as del i neated
be1C1fI :
(a) Admi ni ster a program for Naval Reactors (NE-60) packagi ngs
including the design review and issuance of DOE Certificates of
Compl hnce, approval or di sapproval of requests for al terna
tives, termi nation of the use of a spec1fi c packaging for any
deficiency that warrants such action, and interaction with other
Federal agencies as appropriat~
(b) Ensure adequate documentation of procedures, regulations, and
requirements involving NE-60 packaging.
(c) Conduct appraisals and safety overviews and audits contractor
performance in programs related to NE-60 packaging activities.
(d) Maintain a central records system for NE-60 packagings and
provides copies of Naval Reactors DOE Certificates of Compliance
to the Certifying Official (DP-4) for the Headquarters central
records system.
i. Director of CiVilian Radioactiye Waste Management (RW-l) Through the
Director of Transportation and Waste (RW-33).
(1) Administers a program to develop packagings certified by the NRC
through RW contractors in accordance with Title 10 CFR Part 71 and
the requi rements of page 1-2, pa ragraph 3M 2) of th i s Order.
(2) Administers a program to ensure adequate documentation of procedures
and regulations involving RW-33 packagings.
(3) Provides technical guidance and assistance to operations offices for
the development of packagi ng systems for RW-33.
(4) Develops and maintains a quality assurance program in compliance with
Titl e 10 CFR Part 71, subpart H.
j
11 (and 12)DOE 1540.2
9-30-86
(5) Ensures that RW packaging design contractors have completed and
documented objective and independent eval uations for SARP's prior to
the contractor's submission to the NR~
Section 7
(6) Provides design information and briefings relative to the development
of new RW packagi ng desi gns to Headquarters and operati ons offices;
coordinates potential cask designs with other DOE requirements; and
evaluates potential packaging applications by other operations office& i
(7) Maintains central records system for RW-33 packagings and provides
I . copies of NRC Certificates of Compliance to the Certifying Official
for the Headquarter's Central records system. I . ,
10. IMPLEMENTING ADMINISTRATIVE PROCEDURES AND INSTRUCTIONS.
a. Chapters I through XII provide detailed administrative procedures and
instructions relating to hazardous materials packagin~
b. OOE 54803 i ncl udes the techni cal procedures appl1 cabl e to the preparation
of safety anal ysi s reports for packagi ng (SARP's).
BY ORDER OF THE SECRETARY OF ENERGY:
~ HARRY L. PEEBLES
~ Director of Administration
c
o 0
J
•
i
I
I
~ o
~
1
I
I
1
j
I
I
I
i 0
i
DOE 1540.2
9-30-86
TABLE OF CONTENTS
CHAPTER I - GENERAL
1. Purpose•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
2. Applicability•••••••••••••••••••••••••••••••••••••••••••••••••••••••••
3. Use of DOE, NRC, and DOT Approved Packaging•••••••••••••••••••••••••••
a. DOE-Approved Packag1ng••••••••••••••••••••••••••••••••••••••••••••
b. NRC-Approved Packagi ng••••••••••••••••••••••••••••••••••••••••••••
c. DOT Specification Containers••••••••••••••••••••••••••••••••••••••
d. OOE Orders••••••••••••••••••••••••••••••••••••••••••••••••••••••••
CHArTER II - DEPARTMENT OF ENERGY CERTIFICATES OF COMPLIANCE
1. Pu rpose••.......••••.••....•••••••.....••••••••.....•.••.•......•.••..
2. Procedures••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
a. Preparation of Safety Analys1s Report for Packaging
by Contract.o r ••••••.•.•••••••••••••••••••••••..••••••••••.••.
Figure 11-1 - DOE Certificate of Compliance••••••••••••••••••
Figure 11-2 - Sample DOE Cert1ficate of Compliance•••••••••••
b. Internal Review of SASP by Contractor•••••••••••••••••••••••••••••
C. Submittal of SASP to Operations Office••••••••••••••••••••••••••••
d. Submittal of SASP to DOE Headquarters•••••••••••••••••••••••••••••
e. Review of SASP by the Certifying Official •••••••••••••••••••••••••
f. Preparation and Issuance of Cert1ficate of Compliance•••••••••••••
g. Distribut10n of Certificates of Compliance and Supporting
Documents••••••••••••••••••••••••••••••••••••••••••••••••••••
h. Expiration Date•••••••••••••••••••••••••••••••••••••••••••••••••••
i. DOE Certificate of Comp11ance Processing Times ••••••••••••••••••••
j. Renewal of Certificates of Comp11ance•••••••••••••••••••••••••••••
k. Cancellation of Certificates of Compliance••••••••••••••••••••••••
1. Packaging Documentat1on Revisions •••••••••••••••••••••••••••••••••
m. Packaging D1rectory •••••••••••••••••••••••••••••••••••••••••••••••
CHAPTER III - DEPARTMENT OF TRANSPORWION EXEMPTIONS
1. Purpose•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
2. Procedures••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
a. Requ1rements for Use of DOT Exemptions••••••••••••••••••••••••••••
b. Requests for Exemptions, Renewals, and Party-to-Exemptions ••••••••
(1) Exemptions Requests ••••••••••••••••••••••••••••••••••••••••••
(2) Renewal Requests•••••••••••••••••••••••••••••••••••••••••••••
(3) Party-to-Exempt1ons Requests •••••••••••••••••••••••••••••••••
Section 8
c. Expiration Date Requirements ••••••••••••••••••••••••••••••••••••••
d. Records•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
I-I
1-1
1-2
1-2
1-2
1-3
1-3
II-I
II-I
II-I
II-2
II-3
II-4
II-4
II-4
II-4
II-S
II-a
II-9
II-9
II-9
II-10
II-10
II-I0
I II-I
III-1
III-1
II1-1
III-1
III-2
1II-2
II1-2
II1-2
o
ii DOE 1540.2
9-30-86
e. DOT Exemption Processing Times••••••••••••••••••••••••••••••••••••
f. Make, Mark, and Manufacturer's Exemptions •••••••••••••••••••••••••
CHAPTER IV - DEPARTMENT OF ENERGY ALTERNATIVES
I. Purpose•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
2. Procedu res...•••..........•••••••.•...••.•••........••••.•.....•..••••
a. Requirements for Use of DOE Alternatives••••••••••••••••••••••••••
b. Requesting Offices••••••••••••••••••••••••••••••••••••••••••••••••
c. Submittal of Requests•••••••••••••••••••••••••••••••••••••••••••••
d. Reports•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
e. Documentation Requirements ••••••••••••••••••••••••••••••••••••••••
CHAPTER V - NUCLEAR REGULATORY COMMISSION CERTIFICATES OF COMPLIANCE
1. Purpose.••... 4It;.••••••••••••••••••••••••••••••••••••••••••••••••••••••••
2. Procedures••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
a. Requirements for Use of NRC-Certified Packagings ••••••••••••••••••
b. Requests for NRC Certificates of Compliance •••••••••••••••••••••••
c. NRC Licensee Use of DOE-Certified Packagings ••••••••••••••••••••••
d. Requests for Renewal of NRC Certificates of Compliance••••••••••••
CHAPTER VI - INTERNATIONAL ATOMIC ENERGY AGENCY CERTIFICATES OF COMPETENT
AUTHORIU
1. Purpose...•.....•.••...•....•.••••.•....•..•••••.....•...•••..........
2. Procedures••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
a. Req u 1 rernents ••••••••••••••••••••••••••••••••••••••••••••••••••••••
(1) Degrees of Approval ••••••••••••••••••••••••••••••••••••••••••
(a) Multilateral Approval ••••••••••••••••••••••••••••••••••••
(b) Unilateral Approval ••••••••••••••••••••••••••••••••••••••
(2) Type B Packaging Categories ••••••••••••••••••••••••••••••••••
(a) Type B(M) Packaging••••••••••••••••••••••••••••••••••••••
(b) Type B(U) Packaging••••••••••••••••••••••••••••••••••••••
(3) Types of Certificates••••••••••••••••••••••••••••••••••••••••
(a) IAEA Certificate of Competent Authority ••••••••••••••••••
(b) U.S. Certificate of Competent Authority••••••••••••••••••
(c) Validation Certificate•••••••••••••••••••••••••••••••••••
(4) Functions Requiring Certification••••••••••••••••••••••••••••
(a) Packaging Design Approval ••••••••••••••••••••••••••••••••
(b) Export Shipment Approval and Notification••••••••••••••••
b. Competent Authority Approvals •••••••••••••••••••••••••••••••••••••
c. International Approvals •••••••••••••••••••••••••••••••••••••••••••
(I) General Import/Export Requirements •••••••••••••••••••••••••••
(2) DOE Use of IAEA-Certified Packaging ••••••••••••••••••••••••••
(3) IAEA Certificate Requirements••••••••••••••••••••••••••••••••
111-2
111-2
IV-I
IV-I
IV-I
IV-I
IV-I
IV-I
IV-I
V-I
V-I
V-I
V-I
V-2
V-2
VI-I
VI-l
VI-I
VI-l
VI-I
VI-I
VI-I
VI-I
VI-l
VI-2
VI-2
V 1-2
V 1-2
VI-2
VI-2
V 1-2
VI-2
V1-3
V1-3
V1-3
VI-4
J
J
DOE 1540.2 iii
9-30-86
(a) Design Approval - Export••••••••••••••••••••••••••••••••• VI-4
(b) Design Approval - Import/Export•••••••••••••••••••••••••• VI-4
(c) Export Shipment Approvals for Type B Packagings •••••••••• VI-S
(d) Export Shipment Notifications•••••••••••••••••••••••••••• VI-S
(e) Special Form Certifications•••••••••••••••••••••••••••••• VI-S
Section 9
CHAPTER VII - DEPARTMENT OF TRANSPORTATION SPECIFICATION 7A PACKAGING
CERTIFICATION
1. Purpose.............................................................. . VII-l
I
I
2. Procedures•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• VII-l
a. Ef fact1ve Dates .................................................. . VII-l
b. Certification Documents••••••••••••••••••••••••••••••••••••••••••• VII-l
c. Documentation for New DOT Specification 7A Packaging Procurements. VII-l
d. Records••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• VII-l
I CHarTER VIII - DEPARTMENT OF TRANSPORTATION TYPE B SPECIFICATION PACKAGING
1. Purpose••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• VIII-l
2. Procedures•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• VI II-I
a. Requ1 rernents •••••••••••••••••••••••••••••••••••••••••••••••••••••• VI II-I
b. Records ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• VIII-I
c. References •••••••••••••••••••••••••••••••••••••••••••••••••••••••• VI II-I
CHAPTER IX - SPECIAL FORM CERTIFICATION
1. Purpose••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• IX-l
2. Procedures•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• IX-l
a. Requi rernents •••••••••••••••••••••••••••••••••••••••••••••••••••••• IX-l
b. Preparation Procedures •••••••••••••••••••••••••••••••••••••••••••• IX-l
(1) Effective Dates•••••••••••••••••••••••••••••••••••••••••••••• IX-l
(2) Dissemination of Documentation ••••••••••••••••••••••••••••••• IX-l
(3) Compliance Certificate••••••••••••••••••••••••••••••••••••••• IX-2
(4) Records•••••••••••••••••••••••••••••••••••••••••••••••••••••• IX-2
CHAPTER X - PACKAGING FOR NOH-RADIOACTIVE HAZARDOUS MATERIALS, HAZARDOUS
SUBSTANCES AND HAZARDOUS WASTES
1. Pu rpose••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• X-I
2. Proced u res•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• X-I
a. DOT Packaging Specifications •••••••••••••••••••••••••••••••••••••• X-I
b. Requirements•••••••••••••••••••••••••••••••••••••••••••••••••••••• X-I
iv DOE 1540.2
9-30-86
CHAPTER XI - EXPLOSIVES CLASSIFICATIONS
L Purpose••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• XI-l
2. Procedures•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• XI-l
a.
b.
New Explosives Requirements •••••••••••••••••••••••••••••••••••••••
Classification of a New Explosive•••••••••••••••••••••••••••••••••
(1) Req uests.....................................•...............
(2) Criteria•••••••••••••••••••••••••••••••••••••••••••••••••••••
(3) Admin1strative Flow••••••••••••••••••••••••••••••••••••••••••
XI-l
XI-l
XI-l
XI-l
XI-2
c. Shipment of Laboratory Samples••••••••••••••••••••••••••••••••••••
(1) Req uests................•....................................
XI-3
XI-3
d.
(2) Criteria•••••••••••••••••••••••••••••••••••••••••••••••••••••
Shipment of Materials for Testing•••••••••••••••••••••••••••••••••
XI-3
XI-3
(1)
(2)
Written Statement ••••••••••..•••••••••••..••••••••.•••.••.•••
Criteria•••••••••••••••••••••••••••••••••••••••••••••••••••••
XI-3
XI-3
(3) Adin1n1 strat1on••••••••••••••••••••••••••••••••••••••••••••••• XI-4
CHAPTER XII - RULEMAKING REQUESTS FOR HAZARDOUS MATERIAL pACKAGING
L Purpose••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• XII-l
2. Procedures•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• XII-l
a.
b.
Section 10
Changes Initiated Outside DOE•••••••••••••••••••••••••••••••••••••
Changes Initiated Within DOE••••••••••••••••••••••••••••••••••••••
XII-l
XII-l
J
DOE 1540.2 I-I
9-30-86
QiAPTER I
GENERAL
1. PURPOSE. The administrative procedures prescribed in Chapter II through
Chapter XII of this Order summarize the actions associated with the review and
approval of packagings for the transportion of radioactive and other hazardous
material s.
2. APPLICABILITY.
a. The provisions of this Order are applicable to packagings used for
transporting radioactive and other hazardous materials. Specifically
these procedures cover:
(1) DOE Certificates of Compliance;
(2) DOT exempti ons;
(3) DOE alternatives;
(4) NRC Certificates of Compli ance;
0 (5) IAEA Certificates of Competent Authority;
(6) DOT Specification 7A Packaging Certification;
(7) DOT Type B Specification Packaging;
(8) Special form certification;
(9) Other hazardous materials packaging;
(10) Explosives Classifications; andII .
(11) Rulemaking requests. I
!
t b. This Order also includes the procedures to be followed in performing
reviews based on DOE safety evaluations and certificates of complianc~
The Order detal1 s the review and approval procedure that provides a basi s I for DOE to continue to assure DOT, NRC, and others not only that DOE
packaging designs meet the regulations, but that the certification processI is equivalent to that of NRC.
I
c
1-2 DOE 1540.2
9-30-86
3. USE OF DOE, NRC, AND DOT APPROVED PACKAGING
a. DOE-Approved paCkaging. Operations offices and DOE contractors may use
any packaging whose design has been cert1f1ed by DOE, provided the user
shall:
(1) Possess a copy of the latest DOE Certificate of Compliance;
(2) Possess a copy of the SARP or at a minimum a copy of the drawings and
operating and maintenance instructions for the specific packaging;
(3) Comply with all actions and restrictions specified in the documents
descr1 bed above;
(4) Ensure that the organization is registered as a user of the packaging
with the Certifying Official; and
(5) Ensure that a quality assurance program is established to meet the
requirements of the packaging. All contractors must be required to
establish and ma1 ntai n an appropriate quality assurance and
maintenance program to ensure that DOE-certified packagings in use
continue to meet the provisions of the certification and SARP.
b. NRC-Approved paCkaging.
J(1) DOE contractors may use any NRC-certified packaging provided:
(a) The packaging is used in accordance with the limitations
specified in the certificate of compliance.
(b) The use of the packaging is not prohibited by DOE 5480.3.
(c) The contractor complies with the requi rements of page V-I,
paragraph 2a.
(d) The DOE is registered as a user, and the contractor possesses a
copy of the latest NRC Certificate of Comp11ance.
(2) All requests for NRC Certificates of Compliance by operations offices
and/or their contractors shall be directed to DP-4 in accordance w1th
Chapter V. If any of the above organizations contract with an out
side contractor to develop and obtain an NRC-cert1f1ed packaging, the
request for the certificate of compliance need not be coordinated
through DP-4 provided that the operat10ns off1ce or DOE contractor
does not part1cipate in obtaining the NRC cert1f1cat1on. However,
DP-4 should be furnished preliminary design information so as to
avoid any duplication of effort and for distribution to other
Section 11
• • DOE 1540.2 1-3 (and 1-4)
9-30-86
o
Departmental Elements having a potential interest. All requests for
the registering Departmental Elements as a user of a NRC-certified
packaging must be through DP-4.
(3) Each operations office shall ensure that their contractors establish
and maintain an appropriate quality assurance and maintenance program
to ensure that NRC-certified packagings in use continue to meet the
provisions of the certification and SAR~ Each operations office
will be eval uated on its contractor's transportation quality
assurance and maintenance program as part of the Headquarters
packaging and transportation appraisal.
c. DOT Spec1f1cat10n Conta1ners. Packaging designs which have been published
10 the OOT Hazardous Materials Regulations (Title 49 CFR, Parts 171-178)
as specification packagings may be used by operations offices and
contractors provided that all provisions of the OOT specification and
applicab1 e quality assurance requirements (equivalent to those defi ned in
Title 49 CFR, Part 173) are met, and provided that use of the packaging is
not prohi bited by OOE 54803.
d. DOE Orders. OOE 1540.1 and 54803 requi re that all packagi ng systems meet
safety standards that meet OOT packaging standards and are equivalent to
the applicable NRC packaging standards. The administrative requirements
in OOE 1540.1 and technical requirements in OOE 54803 will provide
Departmental evaluators with a consistent policy, established safety stan
dards, and interpretations consistent with applicable Orders;
Title 49 CFR, Parts 171-199; and Title 10 CFR, Part 71.
I
I
II 0"'"
'.
I
J
DOE 1540.2 II-I
() 9-30-86
CHAPTER II
DEPARTMENT OF ENERGY CERTIFICATES OF COMPLIANCE
1. PURPOSE. The foll ow i ng procedures are to be foll ow ed in i ssui ng DOE Certi fi
cates of Compliance for packaging used to transport those radioactive
mater1als for which packaging des1gn approval is required by DOE regulation~
DOE F 5822.1 "Cert1f1cate of Comp11ance" (Figure II-l> is the form used for
certi fy i ng that a packagi ng desi gn complies with applicabl e DOE requi rements
and packagi ng standards.
2. PROCEDURES. Prior to the 1ssuance of a Cert1f1cate of Comp11ance, a SARP
shall have been prepared by the packag1ng des1gner 1n the format descr1bed 1n
the NRC Regulatory Gu1de 7.9 (Figure 11-2). The following procedures apply to
the preparation of the SABP, its subm1ssion to DOE for review and approval,
and the preparat10n and distribut10n of the result1ng certificate of
canpl iance.
a. Preparation of Safety Analysis Report for Packaging by Contractor.
()
(1) All Type B and fissile material packag1ng designs certified by DOE
must be supported by a SARP whi ch demonstrates that the packagi ng
desi gn meets the packaging standards specified by DOE 54803.
(2) The SABP must include a description "of the proposed packaging in
sufficient detail to identify the packaging accurately and provide
the basi s for eval uati ng the packagi ng.
(3) Detailed 1nstruct10ns for operat10ns and maintenance shall be
incl uded.
(4) The SABP shall a1 so:
(a) Include a descript10n of the quality assurance program for the
desi gn, fabri cati on, assembly, testi ng, mai ntenance, repai r,
mod1 ficati on, and use of the proposed packaging;
(b) Identify established codes and standards proposed for use in
package design, fabrication, assembly, testing, maintenance, and
use. In the absence of any codes and standards, the applicant
shall describe the basis and rationale used to formulate the
packaging quality assurance program; and
Section 12
(c) Identify any specific proviSions of the quality assurance
program which are applicable to the part1cular packaging design
under cons1deration, including a descr1pt10n of the leak test
procedure.
II-2 DOE 1540.2
9-30-86
DOE F 5822.1 U,S. DEPARTMENT OF ENERGY
(5-85) CERTIFICATE OF COMPLIANCE OMB Approval
(Formerly EV-1I181 For Radioactive Materials Packages No. 1910·2000
la. Certificate Number 1b. Revision No. lC. Package Identification No. Ie. Total No. Pages.
0000 o USA/OOOO/B( ) DOE 00
2. PREAMBLE
2a. This certificate is issued under the authority 01 49CFR Part 173.7 (d).
2b. The packaging and contents described in item 5 below, meets the salety standards set lorlh in sub pall E, "Package Approval
Standards" and aubpan F, "Package and Special Form Tests" Title 10. Code of Federal Regulations. Part 71,
2c. This certificate does not relieve the consignor Irom compliance with any requirement 01 the regulations of the U.S. Department
01 Transportation or other applicable regulatory agencies. including the government 01 any country through or into which the
package will be transported.
3. This cerliflcate is Issued on the baSis of a salety analysis report 01 the package design or application
(1) Prepared by (Hame and addrtlss): (21 Title and Identification 01 report or application: (3) Date:
Safety Analysis Report for Packagina-_M_O...;./_D-,ay::..;/_Y_e_ar_DOE Operations Office
(Address) XYZ Company
4. CONDITIONS
This certificate is conditional upon the fulfilling 01 the applicable Operational and Quality Assurance requirements of 49CFR parts
100·199 and IOCFR Pari 71, and the conditions sPeCified in item 5 below.
5. Description 01 Packaging and Authorized COntenls, Model Number, Fissile Class, Other COndilions, and References:
(a) Packaging
(1) Model No.:
(2) Description
(3) Drawings
(b) Contents
(1) Type and form of materia 1
(2) Maximum quantity of material per package
(c) Fissile Class
(d) Conditions
(1) Limitations
(2) Restrictions
REFERENCES
!Ia.Daleo'lssuance: MOnth/oay/Vear leb. Expiralion Date: Month/Day/Year
FOR THE U.S. DEPARTMENT OF ENERGY
7a. Addreis (of DOE Issuing Office) 7b. Signature, Name, and Title (of DOE Approving Official)
US Department of Energy
Washington. DC 20545
lsI Headquarters Certifying Official
Attention: DP-4
Figure II-I J
DOE CERTIFICATE OF COMPLIANCE
11-3
o •
DOE 1540.2
9-30-86
INTRODUCTION
GENERAL INFORMATION
Introduction
Package Description
STRUCTUfW.. EVAlUATION
Structural Design
Weights and Centers of Gravity
Mec~anical Properties of Materials
General Standards for All Packages
Standards for Type B and Large Quantity Packaging
Normal Conditions of Transport
~pothetical Accident Cond1tions
Sped a 1 Form
Fuel Rods
THERMN.. EVAlUATION
Discussion
SummarY of Thermal Properties of Materials
Technical Specifications of Components
Thermal Evaluation for Normal Conditions of Transport
Hypothetical Accident Thermal Evaluation
CONTAIN~T
Containment Boundary
Requirements for Normal Conditions of Transport
Containment Requirements for the Hypothetical Accident Conditions
Io
SHIELDItE EVAlUATION
Discussion and Results
Source Specification
Model Specification
Shielding Evaluation
aUTlCAl. m EVAlUATION
Discussion and Results
Packa~ Fuel Loading
Model Specification
Criticali~ Calculation
Critical Benchmark Experiments
Fi ssl1 e Cl ass
OPERATItE ~DURES
Procedures for Loading the Package
Procedures for Unloadfng the PacKage
Preparation of an Empty Package for Transport
Section 13
AaEPTANa:: TESTS AND MAINTENANa:: f'ROORAM
Acceptance Tests
Maintenance Program
Fi gure II-2
SARP Format
II-4 DOE 1540.2
9-30-86
b. Internal Review of SARP by Contractor.
(1) DOE contractors shall be required to conduct a formal internal review
of the SARP prior to submission to the operations office.
(2) Each contractor may make use of outside consultants or other
contractors as necessary for a SARP review. A report concerning the
review parti ci pants, procedures and methods of rev 1ew, comments and
resolutions shall be prepared and available for audit by the
responsible operations office.
c. Submittal of SARP to Operations Office.
(1) After the internal eval uation has been completed and necessary
changes have been made to the SARP, the contractor shall be required
to submit the final draft of the SARP along with the internal review
report to the appropriate operations office.
(2) The operations office shall take all actions necessary to assure
themselves that the SARP is complete and supports the application for
a OOE Certificate of Compliance.
d. Submittal of SARP to DOE Headquarters. E1 ght copies of the SARP shall be J
submitted by the operations office or the Headquarters program element, as
appropriate, to the CertHyi ng Offi c1 al (DP-4) with a supporting memoran
dum as to the completeness and adequacy of the SARP.
e. Review of SASP by the CertifYing Official. The Certifying Official shall:
(1) Establish in advance, when necessary, procedures to witness any field
performance tests on which the determination of packaging adequacy is
based.
(2) Formally conduct centralized technical review s of each SARP and
ensure that all technical concerns have been addressed and that all
corrections resulting from the review are made prior to final
publication and distributio~
(3) Ensure that all fabrication inspections and procedures required by
qua1i~ assurance plans are identified and include provisions that
ensure they will be followed. Inspections during fabrication will be
the responsibili~ of the contractor, and the documentation should be
available for review by OOE. The vendor's qual i~ assurance records
will be subject to review, and the quali~ assurance plan shall be
documented in the SARP.
J
•
DOE 1540.2 II-5
o 9-30-86
(4) Ensure that the regul atory requi rements are documented in adequate
depth and clarity.
(5) At any time require additional information in order to determine if a
certificate of compliance should be granted, denied, mod1f1ed,
suspended, or revoked.
(6) Maintain an auditable record of the review process, procedures used
for review, definition of all issues raised, findings, and criteria
by which the packag1 ng desi gn was eval uated.
f. preparation and Issuance of Certificate of Compliance.
(1) Upon com pl eti on of a sat1 sfactory DOE rev iew of the SARP by the
Certifying Official, the Official shall prepare and issue a DOE
Certificate of Compliance using DOE F 5822.1 (F1gure II-1). Each
certificate shall be Signed by the Cert1fy1ng Off1c1al or a formally
deSignated representative and shall conta1n at a m1n1mum the
information described below. To av01d adm1n1strat1ve problems, the
cert1f1cate should not reference any documents that contain
classified information or other informat10n that 1s not available to
the public.
(a) Certificate Number (Block la). A four-d1g1t number w1ll be
aSSigned for new cert1f1cates from the follOWing blocks of
m.mbers:
Section 14
NRC: 9001-9500 NR: tJ781-9840
Al..: 9501-9560 NY: 9841-9850
0-1: 9560-9595 OR: 9851-9900
GJ: 9596-9600 R.: 9901-9930
li1: 9601-9760 SAN: 9931-9960
IO: 9761-9780 SR: 9961-9999
, (b) Reyision Number (Block lb). Certificate revisions must be
identified 1n block lb. Revisions and revision numbers may be
1ssued only by the Certifying Official. The revised portion
shall be highlighted by a "change indicator" mark cons1st1ng of
a bold vertical line drawn in the margin opposite the binding
marg1n. The 11ne shall be the same length as the portion
actually changed.
(c) Package Identification (Block lc). This is the ~mbo1 that is
marked on the packaging and in the shipping papers in accordance
with DOT regul ati ons. The packag1 ng does not need to be
remarked for certificate rev1sions 1nvo1v1ng changes 1n
authorized contents, exp1rat10n dates, reference document~ or
other changes not 1nvolv1ng packaging deSign changes. A
o
II-6 DOE 1540.2
9-30-86 J
significant modification affecting the design and contents may
require a revision marking on the packaging exterio~ This
number inc1 udes a prefix, a unique identification number, a type
code, and a suffix:
1 Prefix. The letters "USA".
Z Identification Numbe~ Identical to four-digit number in the
block la.
1 Iype Code. A single- or multi-letter deSignation of the type
..of proposed use of the package as follows:
A A - Type A package desi gn. (Only used for Type A
fi sslle packagi ng.)
.b BW) - Type B packagi ng desi gn that fully complies with
all regulatory requirements and IPCA regulations. The
letter (U) is for IPCA use and means that only unilateral
approval by the originating country is required.
~ B(M) - Type B package design that contains some exceptions
but meets type B(M) requirements. The letter (M) is for
IPCA use and means that mu1 til atera1 approval is requi red '\
between the ori gi nati ng country and the receivi ng country .....,
as well as other countries that might be affected by
shipments through their territory•
.d F - Fissile materials package design.
Jl B( ) - Packaging for domestic use (usually 01 der
packagings) that have not been evaluated against B(U) or
B(M) cri teri a.
! Suffi~ The certificate shall designate that it is for DOE
use on1 y.
S. Example. USA/9860/B(U)F (DOE).
(d) Page Number (Blocks Id and Ie), The cover (si gnature) page 1 s
always page 1. The total number of pages in the cert1ficate is
noted in block Ie. All pages must be numbered, dated, and
identified by the certificate of compliance number.
(e) SAaP Identification (Block 3). This identifies the operations
office responsi bl e for submittal of the SAAP and to whom the
certifi cate shoul d be issued.
• •
DOE 1540.2 11-7
o 9-30-86
(f) Description of Packaging and Authorized Contents, Model Number,
F1ss1le Class, Other Conditions, and References (Block 5).
1 packaging or Vehicle Containment System. A description of
the materials of construction, gross weight, general external
and internal dimensions, appearance, method of closing, and
model number.
Z Authorized Contents. A brief description of the physical and
chemical forms; the approximate quantities (including radio
nuclides, if appropriate), in curies; amounts, in grams (for
Section 15
.. fissile materials); criticality transport index number for
fissile materials packages; expected heat removal capacity
(in Btu/hr); and any restrictions on the contents that might
not be obvious from the nature of the packaging. If appro
priate, International System (SI) units may be provided par
enthetically, in addition to English units. Additional pages
may be added for additionally authorized contents. Comi n
gling restrictions for contents should be identified if
appropriate.
l Limitat10ns and Restr1ctions. This shall include:
o £ Any areas in wh1ch the packaging design is not fully in
compliance with the DOE regulations; and
b Any restrictions on the use of the packaging with regard
to modes of transport, types of vehicles, freight
containers, or supplementary operational requirement~
Such restrictions may require the issuance of a DOT
exemption from some part of the DOT regulation~
! Other References. Used as required.
(g) Dates (Block 6). These dates are the date of issue and the
expiration date. The expiration date will be 5 years after
approval or less if appropriat~
(h) Approval Signature (Block 7). This Signature shall be the
Certifying Official or the Deputy Assistant Secretary for Naval
Reactors, as appropriate, or their deSignated representativ~
( 1) Appendices. Al ternative package contents, other necessary
technical data or information, and modifications and amendments
shall be li sted in an appendix. The above documents must al so
be available for adequate understanding of the limits and use of
more complex packaging.
c
II-8 DOE 1540.2
9-30-86
(2) The Certifying Official shall maintain a master packaging file for
each certificate of compliance, containing as a minimum:
(a) The final SARPj
(b) The operations office application;
(c) The latest approved certificate of compliance;
(d) Reproducible drawings of packaging showing the general makeup of
the packaging and an arti st's concept; ...
(e) Applicable operations and maintenance instructions;
(f) Quality assurance plan; and
(g) Other pertinent information, as appropriate.
(3) Each master packaging file shall also contain:
(a) Any subseq uent amendments or rev 15i ons to the SARP or
certificate of compliance;
(b) Results of any subsequent reviews of any amendments or
revisions; J
(c) Updated list of users for the specific packaging; and
(d) Any subsequent modification to the packaging.
g. D1stribut1on of certificates of Compliance and Supporting Documents.
(1) The Certifying Official shall provide the follOWing distribution:
(a) Assistant Secretary for Enyironment. Safety, and Health (EH=34).
One copy of the/certificate of compliance.
(b) Heads of Headquarters Organizations. One copy of the
certificate of compliance.
(c) Qperation Offices. One copy of the certificate of compliance.
(d) Nayal Reactors. One copy of the certificate of compliance to
the Pittsburgh Naval Reactors Office, and one copy to
Schenectady Naval Reactors Offic~
II-9DOE 1540.2
9-30-86
(2) The operations office to whom the certificate is issued shall, upon
request by other users, be responsible for providing additional
documentati on (i.e(' operati ons and mai ntenance procedures, and
qual ity assurance pl ans).
(3) If an NRC Certificate of Compliance or an IAEA Certificate of
Competent Authority is also required, the distribution reqUirements
set forth in Chapters V and VI must be followed.
Section 16
(4) Copies of the SARP or operating and maintenance and drawings normally
will be distributed directly by the operations office to their
contractors.
(5) Classified SARP's shall be forwarded through the cognizant operations
office in accordance with applicable security procedures.
o
h. Exp1ration Date. An expiration date shall be aSSigned to each certificate
of compliance. The expiration date shall provide no more than 5 years of
validity and should be less if conditions warrant. A blank expiration
date will invalidate the cert1ficate. The Certifying Official will
reissue within a prescribed period of time to be determined those active
certificates of compliance which do not have an expiration date, and
otherwise meet the proviSions of this Order.
i. DOE Certificate of Compliance processing Time~ The application for a DOE
Certificate of Compl iance shall be made on a timely basis. A response to
the applicant by the Certifying Official will be provided within 60-90
days from receipt. If additional information is required, timing wl1l
depend upon the applicant's response to the Certifying Official's request
for information and to subsequent questions which may evolve.
.. j. Renewal of Certificates of Compliance •
(1) Ninety days prior to the expiration date of a certificate the
contractor requesting the renewal shall submit documentation to the
Certifying Official through the responsible operations office
justifying renewal of the certificate. Such documentation shall
include, but not be limited to:
(a) The necessity for renewing the certificate;
(b) That the SARP has been reviewed and complies with applicable
requirements and standards: and
(c) A slll'lmary of the history of past usage.
(2) Upon review and approval by the Certifying Official a revised
certificate with a new expiration date shall be issued. A copy of o
(,,)o
11-10 OOE 1540.2
9-30-86
the certificate shall be provided to EH-34. each operations office.
and to each user of the certificate (see paragraph 2f(l».
(3) Operations offices which do not intend to request renewal of a
cert1ficate issued to their organization should notify all other
operations offices 120 days prior to the expiration date of the
certificate. If another operations office requires the continued use
of the packagi ng. that office may request a renewal from the
Certifying Official. The request should follow the requirements set
forth in subparagraph Hi) above. for renewal of OOE Certificates of
Compliance. The new issuing office w111 be designated on the revised
certificate.
k. Cancellat10n of Certificates of Compl1ance. The use of any certified
packaging will be terminated when it is no longer approved by a valid
certificate of compliance. Cancellation of OOE Certificates of Compliance
shall be made only by the Certifying Official. Recommendations for can
cellation may be made by any program or operations office. Notification
of the reason(s) for cancellation must be provided to the Certifying
Official (telephone immediately with follow-up in writing within 10 days).
All OOE Elements w1l1 be given 60 days to show cause why the certificate
shou1 d not be cancell ed.
1. Packaging Documentation Revisions.
(1) Certificate Rev1s10ns. The issuance of a revised OOE certificate is
required only for substantive changes to approved packaging design~
Changes in existing certificates of compliance can only be made by
the Certifying Official. Requests for revisions may be made by
operations offices who must submit the supporti ng documentation
required for the Certifying Official to evaluate and to process any
authorized revision~ Revisions to certificates shall be highlighted
by vertical lines in the right hand margin. ..
Section 17
(2) SASP Revisions. If changes are made to the approved packaging
design. the SASP must be reviewed for possible modification prior to
initiating changes to the OOE Certificate of Compliance. These
revisions may be implemented through supplements. amendments. or in
the case of extensive changes, complete revisions to the SARP. All
mod1fi cati ons to the SARP requi re internal revi ew by the contractor
and OOE review. Issuance of a revised OOE certificate is required
only for substantive changes to approved packaging design~
m. packaging Directory. DP-4 will maintain a directory of OOE Certificates
of Compliance for radioactive material packaging~
•
III-1DOE 1540.2
9-30-86
CHAPTER III
DEPARTMENT OF TRANSPORTATION EXEMPTIONS
1. PURpOSE. The procedures set forth in this chapter are to be used in obtaining
DOT exemptions, renewals, and party-to-exemptions (PTE) pursant to Title 49
CFR of the DOT Hazardous Materi al s Regul ati ons.
2. PROCEDURES.
a. Requirements for Use of DOT Exemptions. DOT exemptions may be used by DOE
and its contractors provided the exemption is either fssued to DOE or DOE
is a party to an exemption. The user must possess a copy of the
exemption. The user must provide usage data to the operations offfce
responsible for maintafning the exemption.
b. Requests for Exemptions, Renewals, and Party-to-Exemptions. All requests
for DOT exemptions, renewals, and/or PTE's will be made by the originating
operations office to EH-34 for review and submission to DOT with a copy to
DP-12.
o (1) Exemption ReQyests. The conditions under which DOT will issue an
exemption are set forth in Title 49 CFR Part 107 of the DOT Hazardous
Materials Regulations. All requests for DOT exemptions w111 be
submitted in the format required in Part 107. The format for sub
paragraphs a - d show n below must be used.
(a) Submitted to: Office of Hazardous Materials
U.S. Department of Transportation
Washington, DC 20590
.. ATTN: Exemptions Branch (DMT-231)
(b) Regulation Affected: Title 49 CFR Part 173.206. This is a
request for an exempti on from the "packag1 ng requi rements of
Ii tl e 49 CFR Part 173.206" w hi ch •••
(c) Applicant: U.S. Department of Energy
Washington, DC 20545
ATTN: Director of Transportation and Facility
Safety, EH-34
Contact: Packaging and Transportation
Safety Program Manager, EH-34
(Telephone Number)
(d) Proposed Packaging: (a complete description of the proposed
packaging)
c
o
111-2 DOE 1540.2
9-30-86
(2) Renewal Requests. The conditions under which DOT will issue an
exemption renewal is set forth in Title 49 CFR Part 107. Requests
for renewals should be reviewed by users to determine if an exemption
should be renewed. The operations office shall justify the continued
need for an exempti on.
(a) If the decision is made for renewal, a written summary of usage
(number of shipments and shipping experience) will be obtained
from all users. The i nformati on w111 be consol idated by the
operations office and formatted for submission to EH-34.
(b) If an exemption is not to be renewed, written notification must
be made to EH-34 and all regi stered users.
(3) party-ta-Exempt10ns Requests. The conditions under which an organi
zation may request to be a party to an exemption are set forth in
Titl e 49 CFR Part 107.
c. Expiration Date Requirements. Normally exemptions are issued for 2 years.
If there is a continuing need for the exemption beyond the expiration
Section 18
date, a formal renewal of the exemption must be submitted to DOT through
EH-34 at 1east 60 days pri or to the expi ration date. PTE's must be
renewed every 2 years al so.
d. Records. EH-34 maintains a master file of exemptions used by DOE. Each J
operations office maintains records of usage for each exemption for which
they are responsi bl e.
e. DOT Exemption Processing Times.
(1) DOE operations office processing: 30 days.
(2) DOE Headquarters processi ng: 30 days.
(3) DOT processing.
(a) New exemption: 120 days.
(b) Timely renewal: 60 days. (Timely renewal requires appl ication
to DOT at least 60 days prior to the expiration date.)
(c) Party-to-exemption: 30 days.
f. Make, Mark, and Manufacturer's Exemptions. These are DOT exempt10ns
granted to packaging manufacturers and related to specific packagings and
camtodities.
o DOE 1540.2 111-3 (and 111-4)
9-30-86
(1) Anyone may use packagi ngs covered under these exemptions; however, it
may be necessary that a copy of the exemption accanpany a shipment.
(2) Users should be alert to the specific restrictions outlined in the
exemption.
(3) The administrative procedures for renewal of an exemption include
publication in the Federal Register only. DOE users should contact
the exemption holder or EH-34 to determine that the exemption is
still valid. If the exemption to the manufacturer expires that
packagf ng cannot be used.
o
J
DOE 1540.2 IV-1
I
I 9-30-86
_ 1'0""I
CHAPTER IV
DEPARTMENT OF ENERGY ALTERNATIVES
1. PURPOSE. The procedures prescr1bed in this chapter are to be followed in
granti ng al ternat1ves to req u1 raments set forth in DOE 54803 for shi pments
made via government-ow ned conveyances operated by DOE employees or authorized
DOE contractor personnel.
2. PROCEDURES.
a. Requirements for use of DOE Alternatives. The DOE alternative must be
issued to the operations office applying for the alternative to support a
shipment or series of shipments by designated DOE contractor(s). The user
must have a copy of the DOE al ternative.
b. Requesting Offices. The operations office requesting an alternative is
responsible for meeting the requirements set forth in DOE 54803. Such
alternatives must provide for protection equivalent to those prescribed by
DOT regulations.
c. Submittal of Requests. All requests for new DOE alternat1ves must be
submitted to EH-34 at least 120 days prior to the need date. Each request
for an alternative must specify an expiration date not to exceed 2 years.
If there is a need for the DOE alternative beyond the expiration date a
formal renewal request must be submitted to EH-34 at least 90 days prior
to the expiration date. EH-34 shall review the request and approve or
di sapprove an al ternative. Upon approval the DOE a1 ternative w111 be
assigned a sequential identifying number and the requestor notified that
the alternative is approved. A copy of the approval and backup data will
be provi ded to DP-12. An alternative is consi dered under timely renew al
and remains in effect provided the renewal request is received by EH-34 at
least 60 days prior to the expiration date.
d. Reports. Within 30 days after granting or denying an alternative, EH-34
shall provide in accordance with sub-paragraph a, above, a detailed report
of the reasons for granting the alternative.
e. DQCumentation Requirements. The DOE alternative shall:
(1) Set forth the text or substance of the regulation from which the DOE
a1 ternative is sought.
Section 19
(2) State the name, address, and telephone number of the applicant.
(3) Include a detailed description of the proposal, including when
appropriate: drawings; plans; calculations; procedures; test results; o
o
IV-2 DOE 1540.2
9-30-86
previous alternatives; approvals or permits; a list of specification
containers; a list of modified specification containers to be used;
a description of the modifications; and a~ other supporting
i nformati on.
(4) State the chemical name, common name, hazard cl assification, form,
quantity, properties, and characteristics of the material covered by
the proposal, including composition and percentage (specified by
volume or weight) of each chemical, if a solution or mixtur~
(5) Oescribe all relevant shipping and accident experience.
(6) Specify the proposed mode of transportation, identify a~ increased
risks that are likely to result if the DOE alternative is granted,
and specify the safety control measures which the applicant considers
necessary or appropriate to compensate for those increased risks.
(7) Specify the proposed duration or describe the proposed schedule of
events for which the DOE alternative is sough~
(8) State why the applicant believes the proposal and safety control
measures specified therein by the applicant will achieve a level of
safety which:
(a) Is at least equal to that specified in the regulation from which .J
the DOE alternative is sought; or
(b) If the regulations do not contain a specified level of safety,
will be consistent with the public interest and will adequately
protect against the risks to life and property which are inher
ent in the transportation of hazardous materials in commerce.
(9) The DOE alternative must conta in the statement, ''Shi pments must be
made via public vehicles or aircraft operated by DOE employees or
authorized DOE contractor personnel."
DOE 1540.2 V-1
o 9-30-86
CHAPTER V
NUCLEAR REGULATORY COMMISSION CERTIFICATES OF COMPLIANCE
1. PURpoSE. These procedures are to be followed by DOE in obtaining an NRC
Certificate of Compliance for DOE packagings.
2. PROCEDURES.
a. Reguirements for Use of NRC-Certified Packagings. Packaging for which the
NRC has issued a certificate of compliance may be used by DOE and DOE
contractors without further review and certification, provided that the
Department is registered as a user or the certificate is issued to DOE,
and that all of the conditions of the NRC certificate are met, and the use
of the packaging is not prohibited by DOE 54803. Specifically, the using
contractor shall:
(1) Possess a copy of the latest NRC Certificate of Compliance;
(2) Possess a copy of the operating and maintenance instructions as
specified in the license application for the packaging; and
o (3) Have an established quality assurance program equivalent to 10 CFR
Pa rt 71, subpa rt H.
b. Requests for NRC Certificates of Compliance.
(1) Applications for an NRC Certificate of Compliance shall comply with
the requi rements of Titl e 10 CFR, subpart D and be in the format
described in the NRC Regulatory Guide 7.9.
(2) Upon completion of the DOE packaging review and approval process, the
request, eight copies of the SARP (in addition to the eight copies of
the SARP required for DOE certification), DOE certificate of
compliance, applicable draw ings, and the DOE eval uation report. shall
be forwarded to the Certifying Official for til ing with the NRC.
Section 20
(3) All formal communications between operations offices or their
contractors and NRC or DOT regarding certifications will be
transmitted through DP-4.
(4) Headquarters processing times for requests for NRC certificates range
from 14 to 30 days, depending upon the complexity and the issues
associ ated with the packagi ng. NRC processi ng ti mes for new
applications are 3 to 4 months to identify issues and 1 to 1 1/2
years for approval if there are issues to be resolved. Amendments
require apprOXimately 1 to 2 months to identify issues. o
o
V-2 DOE 1540.2
9-30-86 J
c. NRC Licensee Use of DOE-Certified Packagings. Traffic between NRC
li censees and DOE contractors req ui res NRC certHi ed packagi ngs.
d. Requests for Renewal of NRC Certificates of Compliance.
(1) Appl1cations for the renewal of NRC Certificates of Compliance issued
to DOE or its contractors shall be sent to the Certifying Official 60
days prior to the expriration date. Several certificates issued to
contractors that are currently valid w1l1 be revised when a renewal
is requested. The applications should provide the same information
as required for the renewal of DOE Certificates of Compliance (See
page II-9, paragraph 2j). DOE cannot request the renewal of an NRC
Certificate of Compliance issued to a non-DOE organization unless
that organization provides to NRC in wrtting their intent to rel1n
quish their responsibility as the organization to which the certifi
cate was issued.
(2) NRC must receive renewal requests 30 days prior to the expi ration
date to ensure timely renewal.
J
o
DOE 1540.2 VI-1
9-30-86 o
CHAPTER VI
INTERNATIONAL ATOMIC ENERGY AGENCY
CERTIfICATES Of COMPETENT AUTHORITY
1. PURPOSE. These procedures are to be used to obtain appropriate IAEA approvals
for the export/import of radioactive materials shipments.
2. PROCEDURES.
a. Requirements. Radioactive material packaging approved for use within the
United States (DOE and NRC certificates, and DOT specification packagings)
must receive additional approval in the form of a U.S. Competent Authority
Certificate for shipments into foreign countries. Similarly, any foreign
packaging requires an IAEA certificate and domestic revalidation by the
U.S. Competent Authority for sh1 pments into or from the United States.
These approval s are in the form of lAEA Certificates of Competent
Authority.
(1) Degrees of Approval.
(a) Multilateral Approval. Approval by both the appropriate
competent authority of the country of origin and of each country
through or into which the shipment is to be transported.
(b) Unilateral Approval. Approval by the competent authority of the
country of origin only.
(2) Type B Packaging Categories.
(a) Type B(M) paCkaging. For international shipments, Type SCM)
packaging requires multilateral approval of the packaging design
and may require approval of the conditions of shipment. Type
SCM) packagings are those Type S packaging designs that have a
maximum normal operating pressure of more than 700 kPa (100 psi)
guage or a reli ef device that woul d all ow the rel ease of
material under accident conditions. Certain countries generally
require multilateral approval of most Type B packagings.
(b) Type sew packaging. For international shipments, Type S(W
packagi ng requi res unll ateral approval onl y (by the country of
origin) of the packaging design and of any stowage provisions
that may be necessary for heat di ssi pation. The Type SW}
package destination will usually require that the packaging
meets the IAEA regulations (Safety Series No.6, 1973 Edition,
as amended) in all respects.
Section 21
VI-2
o o
DOE 1540.2
9-30-86
(3) Types of Cert1ficates.
(a) IAEA Certificate of Competent Author1ty is issued by national
competent authorities to certHy packaging suitability and com
pliance to other authoritie~
(b) u.s. Certificate of Competent Author1ty is issued by the U.S.
DOT (the competent authority for the United States) and used by
domestfc shfppers to certffy the suitability and compliance of
domestic packagfng to forefgn competent authorftfe~
(c) Va11dat1on Cert1f1cate is the multilateral approval for accept
fng a packagfng approved by a natfonal competent authority.
This generally takes the form of an endorsement on the original
certificate or the issuance of a separate endorsement. annex. or
supplement. A certificate is typically fssued by OOT to certify
acceptance of an lAEA certificate received from a foreign compe
tent authori ty.
(4) funct10ns ReQu1ring Certification.
(a) packag1ng Design Approyal. A copy of the current U.S. Competent
Author1ty Cert1ficate cover1ng the approval of a packaging
des1gn 1s sent prior to shipment to the competent authority of .J.
each country into or through which the package will be
transported (see Titl e 49 CFR Part 172).
(b) Export Sh1pment Approval and Not1ficat1o~ The approval and
notification defines shipment dates and periods of time for
wh1 ch the aproval is sought, contents. i dent1f1 cati on. modes of
transportation. type of conveyance, routes, and special controls
in effect. This should be delivered to the foreign competent
authorities at least 15 days before a shipment is dispatched.
If it is a multflateral-approval packaging or one requiring
special arrangements because the package does not comply with
the lAEA regulations, foreign approvals shall be obtained before
the shipment departs the point of origin.
b. Competent Authority Approyal s.. Requests for lAEA Certifi cates of
Competent Authority should be forwarded to Headquarters (OP-4) with four
copies of the supporting documentation 60 days prior to the effective
date. (The OOT requires at least 45 days prior to the requested effective
date to process the req uest.)
J
DOE 1540.2 VI-3
9-30-86
c. International A~provals. The DOT is the authorized agency to administer
the issuance of international approvals. Foreign packaging of origin may
only be used for import/export shipments provided that an IAEA certificate
has been issued and a U.S. endorsement has been granted.
(1) General Import/Export ReQui rements. Import/Export Shi pm ent s,
Domestic or Foreign Packaging (see Title 49 CFR Part 171>. Any
radioactive material scheduled for either import into the United
States, or export from the United States in the course of being
shipped between locations outside the United States may be
transported in accordance with IAEA regulations if:
(a) U.S. regulations pertaining to shipping papers and placarding
are followed;
(b) IAEA Competent Authority Certificates and necessary reval ida
tions are obtained and the requirements of these certification
documents are met (Type Band fi ssl1 e packages);
(c) Type A packaging is limited to Type A (AI or A2) quantities (see
Titl e 49 CFR Part 173); and
(d) The country of origin has adopted current IAEA regulations, as
amended, and the certificate of compliance states that the
packagi ng meets these requi rements.
(2) DOE Use of IAEA-Cert1f1ed Packag1n~ Each DOE contractor using a
packag1 ng for export whose desi gn has an IAEA cert1ficati on shall be
requi red to:
Section 22
(a) Have a copy of the current U.S. Cert1ficate of Competent
Authority (for domestic packaging) or a copy of the U.S.
Certification Revalidation (for foreign packaging);
(b) Have a copy of the drawings and operating and maintenance
instructions for the specific packaging;
(c) Comply with the requirements and limitations in the
subparagraphs above;
(d) Have the package marked with, and the shipping paper contain,
the package identification marking indicated on the DOE and NRC
approval, or as otherwise indicated by the IAEA certificate; and
(e) Prior to first use, ascertain that the DOE is a registered user
of the certificate. If DOE is not registered as a user, the
appropriate operations office should submit a request to DP-4 to
register DOE as a user.
o
o
V I - 4 DO E 1 540 .2
9-30-86
(3) IAfA Certificate ReQuirements.
(a) Design Approval - Export. Design Approval for Export of DOE/NRC
Approved Packagings (see Title 49 CfR Part 173):
1 To become a user of an existing certificate, DOE shall
register as a user of the U.S. Certificate of Competent
Authority prior to the first export shipment. All requests
w111 be forwarded through DOE Headquarters (oP-4) to DOT.
This provision also applies to DOT specification containers
for shi pments of radi oactive materi al.
2. Requests for a new U.S. Competent Authority Certificate shall
be submitted at least 60 days in advance of a need for a
certificate via the responsible operations office to
Headquarters (oP-4). Requests shall include four copies of
the applfcabl e DOE/NRC Certificate of Compliance and repro
ducible drawings not larger than 8-1/2 x 11 inches that
depict the make-up of the packaging. DP-4 shall forward two
copies of the request to the DOT, in such time that it w111
be received 45 days prior to the effective date.
1 The consi gnor shall ensure that a copy of the U.S. Certifi- J
cate of Competent Authority has been forwarded to the
national competent authori ty for each country into or through
which the Type B(M) package will be transported prior to
di spatchi ng the shi pment.
(b) Des1gn Approval - Import/Export. Desi gn Approval for
import/export shipments, including all foreign-made packaging
(Type B and fissile materials) must have the IAEA Certificate of
Competent Authority revali dated by the DOT before U.s. entry or
export is permitted. Thi s may be done at the request of the
forei gn competent authority for the country of ori gi n or it may
be at the request of a consignee receiving a foreign shipment.
The DOE contractor must determine that DOE is registered as a
user of a foreign competent authority certificate and the cert1
fi cates reval1 dati on pri or to export. Normal 1y, thi s regi stra
t10n w11l automatically occur with the initial request.
foreign packagings used for domestic shipments will require the
issuance of either a DOE or NRC Certificate of Compliance prior
to us~ All correspondence should be routed via the responsible
operations office to DP-4. Copies of the certificate and
revali dation shoul d be furni shed to the carrier.
DOE 1540.2 VI-5
o 9-30-86
o
Section 23
(c) Export Shipment Approvals for TYpe S Packag1ngs. Any export
shipment (domestic and/or foreign packaging) involving vented
Type SCM); Type SCM) with highway route controlled quantities;
Fissile Class III; or special shipping arrangements requires an
applicati on for shi ppi ng approval to be forwarded by DOE
Headquarters (in cooperation with DOT) to the foreign competent
authority. The notification of approval must be delivered prior
to maki ng a shi pment. These requi raments reflect the various
independent requi rements of the individual countries that may
require additional documentation. The packaging and shipping
approvals may be combined into a single approval. Each
application for shi pment approval shall incl ude:
1 The period of time for which the approval is requested;
Z The description of contents, expected modes of transport,
type of vehicle, and proposed route; and
1 The special procedures and administrative/operational
controls being implemented in accordance with the deSign
certificate.
(d) Export Shipment Notificat10ns. Any export shipment of a domes
tic or foreign packaging involving Type SW) packaging with
highway route controlled quantities (see Title 49 CFR Part 173);
Type SCM) packaging; Fissile Class III; or special arrangements,
requires a notification of shipment initiation to the competent
authority of each country involved. Notification must be de
livered at 1east 15 days before a shi pment starts. The
packaging approval, shipping approval, and notification may be
included in the same request. The shipper notification in
cludes:
1 Informati on req ui red for packagi ng i dent1ficati on; and
2 Date of shipment, expected date of arrival, and proposed
routing.
(e) Special Form Certifications. Under the DOT regulations (see
Title 49 CFR Part 173) and the lAEA regulations, radioactive
material shipped as "special form" must have been first certi
fied by a national competent authority as meeting the lAEA
requirements for special form based on encapsulation or physical
characteristics. This cert1fication is not required for u.s.
domestic shipments, but is required for import and export ship
ments. The DOT issues cert1fi cates upon req uest. Such
requests must contai n the i nformati on req ui red by lAEA
regulations and shall be submitted to DOT through the
o
o
VI-6 DOE 1540.2
9-30-86 Jappropriate operations office and Headquarters (OP-4). As a
minimum, the request shall contain information as follows:
1 A detailed description of the material or, if a capsule, the
contents. Particular reference must be made to both physical
and chemi cal forms;
Z A detailed statement of the design of any capsule to be used,
including complete engineering drawings and schedules of
material and methods of construction; and
1 A statement of the tests that have been completed and their
results, evidence based on calculative methods to show that
the material is capable of meeting the tests, or other
evidence that the spec1al form radioactive mater1al meets the
requirements of Title 49 CFR Part 173.
VII-l (and VII-2)
DOE 1540.2 o 9-30-86
CHAPTER VII
DEPARTMENT OF TRANSPORTATION SPECIFICATION 7A PACKAGING CERTIFICATIONS
I
I
1. PURPOSE. These procedures are to be followed in certifying that packagings
used for Type Aquantities of radioactive material meet DOT Specification 7A
requi rements. I .
i
~
Section 24
2. PROCEDURES. Shippers using Type 7A packagings must maintain on file for at
least 1 year after the last shipment, a complete documentation of tests, an
engineering evaluation, or comparative data demonstrating that the construc
tion methods, packaging desi gn, and materi al s of construction comply with the
specification. Procedures for the preparation of this documentation are as
follows:
a. Effective Dates. Type 7A packagings constructed in accordance with the
requirements in effect 6-30-83 and prior to 7-1-85 may continue to be
used. Packaging deSigned or constructed after 6-30-85 shall meet the
requirements then in effecL
o
b. Certification Documents. Compliance documentation for existing Type A
packagings meeting DOT requirements shall be routinely maintained by DP-4
and published in the DOE Certification document for DOT Specification 7A
packagi ngs.
c. Documentation for New DOT Spec1fication 7A Packaging procurements. It is
the responsibility of the contractor to provide to DP-4, through the
operations office, any new DOT Specification 7A packaging being developed.
DP-4 will provide test results and required documentation for inclusion in
the DOE Certification document for DOT Specification 7A packagings.
d. Records. The complete documentation file for all Type A packagings,
including quality control procedures and documentation shall be maintained
by the responsi bl e contractor. The Ty pe A packagi ng records mai ntai ned by
DOE operations offices shall include the DOE Certification document for
DOT Specification 7A packagings and verification documentation from the
supplie~ This documentation shall be used as required to support re
quests for export/import approval s and exemptions.
J
J
DOE 1540.2 VIII-1 (and VIII-2)
9-30-86
CHAPTER YIII
DEPARTMENT OF TRANSpoRTATION TYPE B SPECIFICATION PACKAGING
1. PURpoSE. These procedures are to be followed to assure that DOT Type B
specification packagings authorized for Type B quantities of radioactive
materials are approved for use by DOE and its contractor~
2. PROCEDURES
a. Requirements. Users of Type B specification packagings must comply with
the following provisions of Title 49 CFR:
(1) Section 113.413, "Req ui rements for Ty pe B package~"
(2) Section 173.416, "Authorized Ty pe B packages."
(3) Secti on 113.417, "Authorized Package - Fi ssil e (Type B quantiti es)."
(4) Section 173.472, ''Requirements for Exporting OOT Specification Type B
and fissile Package~" c b. Records. Appropriate procurement, use, and maintenance files must be
maintained by OOE and its contractors who use Type B specification
packagings under special conditions, such as:
(1) DOT Specification 20WC;
(2) DOT Specification 21WC; and
f (3) DOT Specification 6M.
c. References. Title 49 CFR, Sections 173.413, 173.416, 173.411, 113.474,
and 173.475 for Type B requirements, authorized packaging's, and quality
control requi rements.
o
J
•
J
IX-lDOE 1540.2
9-30-86
CHAPTER IX
SPECIAL FORM CERTIFICATION
1. PURpoSE. The following procedures are to be used in certifying that special
form materials comply with the requirements set forth in Title 49 CFR Part
173, of the DOT regulations.
" 2. PROCEDURES.
a. Requirements. Each shi pper of speci al form radi oactive materi al shall
maintain on flle for at least 1 year after the last shipment is made, a
complete safety analysis, including documentation of any tests demonstra
ting the material meets the requirements for special form. In addition,
prior to the first shipment of this material outside of the United States,
a certificate of competent authority is required (see Chapter VI>.
Section 25
(1) "Special Form" radioactive material, is defined in Title 49 CFR
Part 173.
(2) To qualify as a special form material:
o (a) The material must be a single solid piece or contained 1n a
sealed capsule that can be opened only by destroying .the
capsul e;
(b) Have at 1east one di mensi on not 1ess than 5 mi" imeters; and
(c) It must meet appl i cabl e test req ui rements.
<Title 49 CFR Part 173.)
b. preparation procedures. Procedures for preparation of the required
documentati on are as follows:
(1) Effectiye Dates. Special form encapsulations designed in accordance
with 6-30-83 requirements and fabricated prior to 7-1-85 may
continue to be used for each type. These encapsulations deSigned
and/or fabri cated after 6-30-85 must comply with the appl i cabl e
requi rements then in effect.
(2) Dissemination of Documentation. It is the responsibility of the
procuring contractor to ensure that procurements of special form
materials and packagings (capsules) include adequate proviSions for
documentation of test results and engineering evaluations. All
documentation should be readily available for use by any operations
offi ce or contractor.
o
IX-2 DOE 1540.2
9-30-86
J(3) Compliance Cert1f1cate. Although th1s spec1f1c document is no longer
required by OOT, the certificates for existing special form material s
or encapsu1 at1 ons will conti nue to be used by OOE. Future
encapsulation designs or materials to be used by operations offices
or contractors must have a similar level of summary documentation to
assist in the administration of applicable design records.
(4) Records. The master records for special form materials or
encapsulations shall be maintained by the responsible contractor.
Records required to support the administration of export/import
activities shall be maintained by the responsible DOE operations
office and available for overview by appropriate Headquarter's
offices. A copy of each record shall be forwarded to the Cert1fying
Off1 c1 al (OP-4).
J
J
DOE 1540.2 X-I (and X-2)
o 9-30-86
CHAPTER X
PACKAGING FOR NON-RADIOACTIVE HAZARDOUS MATERIALS,
HAZARDOUS SUBSTANCES, AND HAZARDOUS WASTES
1. PURPOSE. These procedures are to be followed in the selection and use of
~ packaging approved by the Department of Transportation <Title 49 CER Parts
100-179) for hazardous mater1 al s, 1ncl ud1 ng hazardous substances and wastes.
2. PROCEDURES.
a. DOT packaging Specifications. Packaging speCifications approved and
published by the DOT are authorized for use by Departmental Elements and
contractors for transporting hazardous materials other than radioactive
materials in accordance with applicable requirements. Procedures for the
use of Type A and Type B specification packaging for radioactive materials
are provided in Chapters VII and VIII of this Order.
b. Requirements. Users shall ensure that packag1ngs constructed in
accordance with the DOT specifications meet the current requirements.
o (1) Packagings procured from commercial sources must be certified by the
manufacturer that the packagi ng meets all appli cabl e specifi cations.
(2) It is the responsibility of the user to ensure that adequate
documentation is developed and maintained for new spec1f1cat1on
packag1ngs constructed for their use. All documentation should be
available for audit.
c
J
fl.
J
J
DOE 1540.2 XI-1
9-30-86
CHAPTER XI
EXPLOSIVES CLASSIFICATIONS
Section 26
1. PURpoSE. These procedures are to be followed in assigning DOT hazard
classifications for DOE explosive materials, and subsequent DOT registration
actions.
2. PROCEDURES.
a. New Explosives Reqyirements. New explosives, including explosive com
pounds, mixtures, or devices (hereinafter referred to as explosives) may
be transported if they have been examined, classified, and approved for
sh1 pment by DOE. This applies to new explosives made by or under the
direction or supervision of DOE. A copy of the approval along with
supporting documentation shall be provided to OP-12 for registration with
DOT prior to making a shipment. A shipment may be made when the DOE
classification has been filed (malled to) with DOT. New explosives that
have not been permanently cl assi f1ed may be sh1 pped subj act to the
follOWing conditions:
(1) To a laboratory for examination, if the requirements of paragraph 2c,
below, are met (see Title 49 CFR paragraph 173.86(d».
(2) To a testing facility if the requirements of paragraph 2d, below, are
met (see Ti tl e 49 CFR paragraph 173.86(e».
b. Classification of a New Explosixe. The procedure for apprOVing new
explosives or explosive items for transportation in interstate commerce
shall be as follows:
(1) Reqyests. A written request for a classification action must be
prepared stating the proposed classification, method of packaging, .. marking, labeling, and mode of transportation, plus:
(a) The request must include the results of the classification
tests.
(b) If the classification is by analogy, a statement must be
included descr1b1ng how the new explos1ve complies w1th the five
conditions descr1bed under subparagraph b(2), below.
(2) Criteria. Tests are to be conducted accord1ng to the Army DOD TB
700-2 (al ternate tests may be used with j ustificati on) or may be
analogous to a previously approved explosive. Analogy data must
'\...'-'
XI-2 DOE 1540.2
9-30-86
clearly support that the new explosive or explosive item is at least
as safe as the previously approved material or item. Specifically,
the explosive and package must meet all of the following criteria:
(a) The new material does not significantly exceed the previous
standard of sensitivity to heat, shock, and energy output;
(b) The total quantity is not greater than that contained in the
previously classified explosive and is within 3 grams per item;
(c) There is no significant change in the configuration in terms of
directional energy output or shaping effect, and length-to
diameter ratio is equal to or lower than the classified item;
(d) There is no reduction in the containment characteristics of the
outer package, including the container, its latches, banding,
and sharp edges;
(e) There is no significant decrease in the integrity of the packing
material, baffles or separations, orientation, or separation
distance, if more than one item is contained in a package; and
(f) In some cases the explosive may be shi pped ina variety of
specification packaging. If the packaging does not meet DOT
J..
specifications, it may be necessary to obtain a DOT exemption.
(See Chapter lID.
(3) Administrative Flow.
(a) The contractor shall submit the request for a classification
action along with applicable supporting data to the responsible
operations office (either Albuquerque or San Francisco) as
appropri ate.
(b) Upon review and determination that the request is proper and
sufficient, the operations office shall issue a classification
Section 27
approval document to the req uestor.
(c) The operations office shall transmit two copies of the classifi
cation approval document and supporting data to DP-12 for filing
with DOT. DP-12 will advise the operations office when this
filing has been performed via a copy of the transmittal to DOT.
The operations office shall then notify the requestor and other
affected parties.
J
c
•
o XI-3DOE 1540.2
9-30-86
c. Shipment of Laboratory Samples. A new explosive may be shipped via
cOOImerci al carrier for the purpose of exami nation pri or to permanent
classification approval provided the following actions have been taken:
(1) Requests. A written request for tentative classification is prepared
stating the proposed classificationl method of packagingl quantity of
materiall markingl labelingl and mode of transportation. The request
shall incl ude test data or analogy data specified in paragraph 2b(2)
above as available and, when not available, discuss and explain the
safety measures to be taken for packagi ng and transportati on.
(2) Cr1 teri a.
(a) A written request for a tentative classification (one copy) with
supporting data has been submitted by the contractor to the
responsible operations office.
(b) Upon review and determination that the request is proper and
sufficientl the operation office will issue a tentative shipping
descri ption and cl assification ina memorandum to the requestor
with a copy to DP-12.
d. Shipment of Materials for Testing. A new explosive or explosive item may
be shipped via motor vehicle to a test facility prior to having been
classifiedl as follows:
(1) Written Statement. A formal statement of tentative cl assi ficati on
determination shall be prepared stating the proposed classificationl
method of packaging, quantity of material, labeling, mode of
transportation, and escort provisions.
( 2) Criteria.
.. (a) The new explosive is not a forbidden or initiating explosive•
(b) The new explosive is a cOOlpound or mixture. It must be
described as a high explosive or high explosive liquid as
appropriate (other than contained in a device), and packed,
marked, labeled, and described on the shipping documents in
accordance with applicable ooT regulations.
(c) The new explosive is a device. It must be assigned a tentative
description and classification by the responsible contractor and
packaged, marked, labeled, and described on the shipping docu
ments as required for tentative descri ptions and classifications
by applicabl e OOT regul ati ons.
XI-4 DOE 1540.2
9-30-86 J
(d) The new explosive is transported in a Government-owned motor
veh1 cl e operated by DOE or contractor personnel.
(e) The new explosive is accompanied by a person, in addition to the
driver of the vehicle, who is qualified by training and
experience to handl e explosives.
(3) Administration. The written statement shall be prepared and mai n •tained by the contractor and the responsible operations office.
J
•
• •
DOE 1540.2 XII-1
9-30-86
CHAPTER XII
RULEMAKING REQUESTS FOR HAZARDOUS MATERIAL PACKAGING
1. PURpoSE. To provide for a DOE-coordinated position, these procedures are to
be follOfed in:
a. Q:)mmenti ng on Noti ces of Proposed Rul emaki ng publi shed by the Department
of Transportation (Title 49 CFR Part 106) and the Nuclear Regulatory
Q:)mmission <Title 10 CFR Part 2); and the Department of Energy (Title 10
CFR, Chapter lID;
b. Q:)mmenting on proposed revisions to Safety Series No. 6 by the
International Atomic Energy Agency; and
Section 28
c. Requesti ng Changes to DOT, NRC, or lAEA hazardous materi al packagi ng
regulations.
2. PROCEPURES.
a. Cbanges Initiated Outside DOE.
(1) DP-12 and EH-34 shall review the Federal Regi ster for proposed
rul emaki ng i nvol vi ng revi si ons to the hazardous materi al packagi ng
regul ati ons.I
I
(2) DP-12 shall distribute copies of the Notices of Proposed Rulemaking
to the field for review and comment.
(3) DP-12 will coordinate comments and forward to EH-34 for review andI, ' submission to DOT or NRC as appropriate.
(4) DP-12 will coordinate the distribution of proposed IAEA revisions to
Departmental Elements and the field for review and comment.
b. Changes Initfated Wfthin POE.
(1) The originator through the responsible operations office as
appropriate shall submit a draft of the proposed rulemaking to DP-12
and the Directives and Federal Register Branch, MA-213.12.
I
!
f (2) DP-12 shall coordinate with DP-4 and other Departmental Elements as
appropriate in reviewing the proposal.
(3) DP-12 will submit the coordinated proposal to EH-34 for review and
submission to DOT or NRC.
'0
1
http:MA-213.12
XII-2 DOE 1540.2
9-30-86
c. These procedures do not apply to Notices of Proposed Rulemak1ng by the
Interstate Commerce Comm1 ssion. See DOE 1540.1
•
•