DOE N 481.1A, Reimbursable Work for Department of Homeland Security
Functional areas: Work Processes
This revised Notice contains additional information and direction to cognizant DOE contracting officers and other affected Federal and contractor personnel identifying the processes and requirements to ensure the efficient implementation of the MOA. DOE N 251.62, dated 04-21-05, extends this directive until 4-21-06.
Cancels DOE N 481.1.
Supersedes:
Superseded By:
Version history and related documents
Superseded by
A newer version replaces this document.
Supersedes
Earlier documents this one replaced.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DISTRIBUTION: INITIATED BY:
All Department Elements Office of Management, Budget and Evaluation/CFO
U.S. Department of Energy NOTICE
Washington, D.C.
Approved: 4-21-03
Expires: 4-21-04
SUBJECT: REIMBURSABLE WORK FOR DEPARTMENT OF HOMELAND SECURITY
1. OBJECTIVE. To authorize a modified process for the acceptance, performance, and
administration of work from the Department of Homeland Security (DHS) by
Department of Energy (DOE) contractor and federally operated laboratories, sites, and
other facilities.
2. CANCELLATIONS. DOE N 481.1, Reimbursable Work for Department of Homeland
Security, dated 2-28-03 is cancelled. Cancellation of the above directive does not, by
itself, modify or otherwise affect any contractual obligation to comply with the directive.
Cancelled directives that are incorporated by reference in a contract remain in effect until
the contract is modified to delete the reference to the requirements of the cancelled
directives.
3. APPLICABILITY.
a. DOE Elements. This Notice applies to all DOE elements listed in Attachment 1,
including the National Nuclear Security Administration.
b. Site/Facility Management Contracts.
(1) The Contractor Requirements Document (CRD), Attachment 2, sets forth
requirements of this Notice that, on an interim basis, will apply to
site/facility management contracts that include the CRD.
(2) This Notice does not automatically apply to other than site/facility
management contracts. Any application of any requirements of this
Notice to other than site/facility management contracts will be
communicated separately from this Notice.
(3) Contracting officers are responsible for incorporating the CRD into
site/facility management contracts via the Laws, Regulations, and DOE
Directives clause of the contracts.
(4) As the Laws, Regulations, and DOE Directives clause of site/facility
management contracts states, regardless of the performer of the work, a
site/facility management contractor with the CRD incorporated into its
contract is responsible for compliance with the requirements of the CRD.
c. Exclusions. None.
DOE N 481.1A
CANCELE
D
2 DOE N 481.1A
4-21-03
4. BACKGROUND. DOE O 481.1B, Work for Others (Non-Department of Energy Funded
Work), dated 9-28-01, sets forth the objectives, applicability, requirements, and
responsibilities for DOE Federal employees and DOE contractor personnel performing
work and/or using DOE facilities to perform work that has not been directly funded by
DOE appropriations for non-DOE entities. Among other things, the Order requires
certain determinations be made consistent with the requirements of the Economy Act of
1932, as amended (31 U.S.C. 1535), and the Atomic Energy Act of 1954, as amended (42
U.S.C. 2011 et seq.), and their implementing regulations. The Order also provides
requirements for the reimbursement of costs and payment of other charges.
Section 2
The Homeland Security Act of 2002 (Act) authorizes DHS to access the capabilities of
DOE’s laboratories and other sites to further DHS mission objectives. In order to ensure
the availability of DOE capabilities under the existing site contracts on March 1, 2003,
the Secretary of Energy and the Secretary of Homeland Security entered into a
Memorandum of Agreement (MOA), dated February 28, 2003. This MOA, among other
things, implements provisions of the Act specifying that, notwithstanding any other law
governing the administration, mission, use or operation of any DOE national laboratories
or sites, DOE may accept and perform work for DHS at those laboratories and sites,
consistent with the resources provided, and perform the work on an equal basis with
other missions at the site and not on a non-interference basis with other missions of the
site. The Act further provides that DHS will reimburse DOE for the work performed
through a method under which DOE waives any requirement for DHS to pay
administrative charges or personnel costs of DOE or its contractors in excess of the
amount that DOE pays for work performed by its contractors. Lastly, under the Act,
DHS funds are not to be expended for laboratory directed research and development
unless such activities support the missions of DHS.
5. REQUIREMENTS. Work directly funded by DHS shall be accepted, performed, and
administered in accordance with the terms of the MOA (Attachment 3) and document
entitled “Department of Energy Reimbursable Work Procedures for the Department of
Homeland Security” (Attachment 4). DOE O 481.1B does not apply to such work.
6. CONTACT. For additional information, contact Mary H. Egger, Office of General
Counsel, at 202-586-5246 or A. Scott Geary, Office of Procurement and Assistance
Management, at 202-586-3299.
BY ORDER OF THE SECRETARY OF ENERGY:
KYLE E. McSLARROW
Deputy Secretary
CANCELE
D
DOE N 481.1A Attachment 1
4-21-03 Page 1
DOE ORGANIZATIONS TO WHICH DOE N 481.1A IS APPLICABLE
Office of the Secretary
Chief Information Officer
Office of Civilian Radioactive Waste Management
Office of Congressional and Intergovernmental Affairs
Office of Counterintelligence
Departmental Representative to the Defense Nuclear Facilities Safety Board
Office of Economic Impact and Diversity
Office of Energy Efficiency and Renewable Energy
Energy Information Administration
Office of Environment, Safety and Health
Office of Environmental Management
Office of Fossil Energy
Office of General Counsel
Office of Hearings and Appeals
Office of Independent Oversight and Performance Assurance
Office of the Inspector General
Office of Intelligence
Office of Management, Budget and Evaluation and Chief Financial Officer
National Nuclear Security Administration
Office of Nuclear Energy, Science and Technology
Office of Policy and International Affairs
Office of Public Affairs
Office of Science
Secretary of Energy Advisory Board
Office of Security
Office of Worker and Community Transition
Office of Energy Assurance
CANCELE
D
Attachment 1 DOE N 481.1A
Page 2 4-21-03
Bonneville Power Administration
Southeastern Power Administration
Southwestern Power Administration
Western Area Power Administration
CANCELE
D
DOE N 481.1A Attachment 2
4-21-03 Page 1 (and Page 2)
CONTRACTOR REQUIREMENTS DOCUMENT
DOE N 481.1A, Reimbursable Work for Department of Homeland Security
Section 3
This Contractor Requirements Document (CRD) establishes the requirements for Department of
Energy (DOE) contractors, including National Nuclear Security Administration contractors,
performing work and/or using DOE facilities to perform work directly funded by the Department
of Homeland Security (DHS). Such work shall be accepted, performed, and administered by the
contractor in accordance with the attached MOA and document entitled “Department of Energy
Reimbursable Work Procedures for the Department of Homeland Security.” DOE O 481.1B
does not apply to such work.
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
ATTACHMENT 4. DEPARTMENT OF ENERGY REIMBURSABLE WORK
PROCEDURES FOR THE DEPARTMENT OF HOMELAND SECURITY
CANCELE
D
This page intentionally left blank.
CANCELE
D
DOE N 481.1A Attachment 4
4-21-03 Page iii (and Page iv)
CONTENTS
1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2. Department of Homeland Security Reimbursable Work Process Description . . . . . . . . . 1
Appendix A. DOE-DHS Memorandum of Agreement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1
Appendix B. Department of Energy Federal and Contractor Points of Contact . . . . . . . . . . . . B-1
Appendix C. Laboratory-Directed Research and Development Cost Instructions . . . . . . . . . . C-1
CANCELE
D
DOE N 481.1A Attachment 4
4-21-03 Page 1
DEPARTMENT OF ENERGY REIMBURSABLE WORK PROCEDURES
FOR THE
DEPARTMENT OF HOMELAND SECURITY
1. INTRODUCTION.
The Homeland Security Act of 2002 (Act) authorizes the Department of Energy (DOE) network
of laboratories and sites, including production plants, to be made available to assist the
Department of Homeland Security (DHS) in accomplishing its mission objectives. Specifically,
Section 309 of the Act provides express authority for DHS to utilize DOE capabilities on terms
mutually agreeable to both Departments. On February 28, 2003, the Secretary of Energy and
Secretary of Homeland Security executed a Memorandum of Agreement (MOA) that provides a
framework by which this may occur on an interim basis starting March 1, 2003. On that same
date, Deputy Secretary of Energy McSlarrow issued DOE Notice 481.1, Reimbursable Work for
Department of Homeland Security, and called for the incorporation into site/facility management
contracts of a modified process for the acceptance, performance, and administration of work
from DHS at those facilities (Appendix A).
The purpose of this document is to provide guidance on the modified process established by the
Notice and delineate for DHS and DOE the process by which DHS may place orders for
reimbursable work activities to be performed at DOE laboratories and sites in accordance with
the MOA. This document applies only to work that is directly initiated and funded by DHS, and
programs transferred from DOE to DHS by the Act. This document does not apply to projects
conducted for the private sector or other agencies, whether or not funded by DHS. The work
performed for DHS at DOE laboratories and sites will be conducted at the request of DHS and
performed consistent with the terms and conditions set forth in applicable DOE facility/site
contracts.
Section 4
This document is not intended to address intelligence and intelligence-related work activities for
DHS. Section V of the MOA provides that DHS projects and programs that utilize DOE
laboratory or site intelligence personnel, information, technology, or systems will be conducted
through and administered by the DOE Office of Intelligence. While many of the features,
including the same cost reimbursement principles, that are described in this document apply to
intelligence-related work for DHS, the special nature of these activities and associated
information and technologies require a slightly modified handling. For further information
regarding DOE performance of intelligence work, please contact Mr. Michael C. Mazaleski at
202-586-8718.
2. DEPARTMENT OF HOMELAND SECURITY REIMBURSABLE WORK PROCESS
DESCRIPTION.
The process for the submission and acceptance of a Department of Homeland Security- (DHS-)
initiated nonintelligence-related reimbursable work requirements and the performance and
administration of such work under a DOE laboratory or other site/facility management contract
CANCELE
D
Attachment 4 DOE N 481.1A
Page 2 4-21-03
is described below and is segmented into three steps. (See Figure 1.) The process for
nonintelligence-related reimbursable work requirements at a federally operated laboratory or site
(e.g., National Energy Technology Laboratory) is essentially similar. Work directly funded by
DHS will be accepted, performed, and administered in accordance with this document and the
MOA executed by the Secretary of Energy and the Secretary of Homeland Security, dated
February 28, 2003. DOE O 481.1B, does not apply to work directly funded by DHS. DOE and
DOE contractor points of contact have extensive experience in preparing documentation and
obtaining approvals required to place work at DOE sites. A list of these contact points is
contained in Appendix B. DHS managers will be supported throughout the process by cognizant
DOE staff.
• Step 1—Proposal Development, Review, and Approval
• Step 2—Inter-Agency Agreement Incorporating Funding Terms
• Step 3—Performance of Work and Project Closeout
Step 1—Proposal Development, Review, and Approval
a. Proposal Development.
It is anticipated that prior to the initiation of Step 1, DHS, working with DOE and its contractors,
will identify the DOE laboratory/site appropriate for the conduct of the work. The DOE points
of contact are available to provide assistance, as necessary. Preliminary informal contacts with
contractor personnel are encouraged to facilitate the process. It should be noted, however, that if
DHS decides to pursue a competitive procurement for a requirement, the restriction against
competing with the private sector as prescribed by the Federal Acquisition Regulation, and as
otherwise stated in paragraph 4a of DOE O 481.1B, remain applicable: DOE laboratory or site
contractors are prohibited from responding to a DHS Request for Proposals as offerors, team
members, or subcontractors to offerors. However, DOE laboratory or site contractors are
permitted to respond to a DHS general research or technical assistance request, such as a Broad
Agency Announcement, or similar solicitation.
Section 5
Step 1 begins with discussions between DHS and the identified DOE laboratory site, during
which DHS representatives present their work requirements, and continues as the DOE facility
management contractor prepares a proposal describing the agreed-to statement of work, work
methodology, resources, and schedule. DHS may engage in discussions with contractor
personnel directly or may enlist the direct participation of the DOE business contact identified in
Appendix B and/or other DOE personnel, such as the contracting officer or technical program
staff. As a result of these discussions, the DOE contractor prepares a proposal package for
review by DHS and the DOE contracting officer. The proposal package serves two purposes.
First, it provides DHS a formal response to its requirement that reflects the DOE contractor’s
understanding of the work and how it will be accomplished and the estimated resources
(including cost) needed to accomplish it. Second, the proposal package provides information to
the DOE contracting officer necessary to ensure that the work is within the contract scope; that
CANCELE
D
DOE N 481.1A Attachment 4
4-21-03 Page 3
the work is consistent with contract terms and conditions, as well as applicable laws and
regulations; and that any special circumstances [such as non-intelligence-related special access
programs (SAPs)] are coordinated with cognizant DOE personnel. DOE laboratory or site
contractors are knowledgeable about the information required to develop a complete proposal
package. Unless otherwise noted in this document, contract requirements and applicable DOE
approvals consistent with DOE work must be satisfied. The proposal package will typically
include—
• name of sponsoring organization;
• points of contact at DHS and the laboratory or site contractor;
• detailed technical description of the work (including schedules, milestones, and
deliverables) and reporting requirements;
• total estimated costs developed to ensure full cost recovery, including additional cost
details if requested by DHS and/or DOE ( costs for the Federal administrative charge will
not be assessed for directly funded DHS work and should not be included);
C special security requirements other than those provided under the standard terms of the
DOE contract such as classification guidance for classified activities;
• identification of any required National Environmental Policy Act analysis and
documentation;
• analysis of Environment, Safety and Health (ES&H) and Quality Assurance program
requirements as appropriate;
• provision for reimbursement to DOE of termination and closeout costs including, if
appropriate, removal/disposition of any project-related equipment and waste;
• need to involve other DOE facilities or sites;
C DHS reporting and records management requirements;
• work involving human and/or animal research subjects involved;
• description of any work to be subcontracted;
• identification of any major construction or facility modification associated with the work
to be performed;
• need for domestic/foreign travel or interaction with nondomestic entities; and
• any other special circumstances.
CANCELE
D
Attachment 4 DOE N 481.1A
Page 4 4-21-03
b. Proposal Review and Approval.
Section 6
The contractor submits its draft proposal package for DHS and DOE review. The reviews will
be conducted concurrently. DHS reviews the proposal to ensure that it is consistent with its
requirements and that the work methodology and estimated costs are acceptable. The DOE
contracting officer reviews the package to ensure that the proposed work to be performed is
within contract scope, is otherwise consistent with applicable contract terms and conditions, and
will not create unfunded burdens on DOE facilities and resources. A limited number of
proposals may present circumstances that require coordination with other DOE elements. In that
event, the contracting officer will ensure notification is provided to DHS and the appropriate
DOE elements. The DOE contracting officer will also ensure the necessary documentation is
provided to the appropriate DOE office as early in this stage as possible to maintain an expedited
and concurrent review of the proposal. Examples of circumstances that may require such
coordination include, but may not be limited to, a non-intelligence-related SAP, which requires
approval by the Executive Secretary of DOE’s Special Access Program Oversight Committee,
and construction projects, which require coordination with the cognizant DOE Secretarial
Officer for laboratory or site management. As provided for in the MOA between DOE and DHS,
intelligence work is to be conducted through the Office of Intelligence utilizing procedures
approved by the Director, Office of Intelligence.
DOE also reviews the proposal package to ensure that the estimated total cost of the proposed
work is priced in accordance with DOE pricing policies and the pricing provisions applicable to
DHS work. The costs charged to DHS will be consistent with the cost of similar work
performed for DOE at the laboratory/site. DHS will not be required to pay administrative costs,
including the DOE Federal Administrative Charge, general site safeguard and security costs, or
personnel costs, in excess of the amount that DOE programs incur for their own work
requirements. However, if a DHS proposal calls for safeguards and security requirements
beyond that normally provided by DOE for the conduct of its own activities, DHS will be
charged an amount equal those special requirements which can be directly attributable to the
project. Such costs will be identified in the proposal. Any Laboratory-Directed Research and
Development costs to be charged will be identified to DHS by DOE as part of the cost proposal,
will be consistent with costs charged to DOE for similar activities, and will support DHS
missions. An appropriate acknowledgment by DHS will be included in the proposal for DHS
approval (see Appendix C).
In the event that the proposal raises issues between DOE and DHS on the prioritization of work,
the DOE contracting officer, supported by DOE program personnel, will resolve such issues with
the designated DHS representative. If an issue is not resolved at this level, the issue will be
referred to the cognizant DOE Secretarial Officer for resolution with designated DHS
representatives. We do not expect referrals of this nature to be necessary. As provided for in the
DOE-DHS MOA, the resolution of any work prioritization issues under the contract will be
communicated to the contractor exclusively through the DOE contracting officer.
Upon review and approval by DOE, a copy of the approved proposal or letter of approval will be
provided by DOE to the DHS. DHS funding need not be transferred until after DOE approves
Section 7
CANCELE
D
DOE N 481.1A Attachment 4
4-21-03 Page 5
the proposal, and the contractor shall not initiate work until the actions in step 2 have been
completed. When DOE or the DOE contractor sends the approved proposal to DHS, DHS will
have the opportunity to complete its review of the proposal package and resolve any outstanding
issues.
Step 2—Inter-Agency Agreement Incorporating Funding Terms
Once DHS approves the proposal, a signed DHS inter-Agency agreement incorporating funding
terms (DHS may use its form) will be sent to DOE for contracting officer approval. The inter-
Agency agreement must include the following and any other information deemed necessary.
• A written statement (example below) contained on or attached to the funding document
stating “This agreement is entered into pursuant to the authority of Section 309 of the
Homeland Security Act of 2002, Public Law 107-296 (6 U.S.C. 189).” (Note: The
determinations, certification, and statement normally required by subparagraphs 4c and
4d, of DOE O 481.1B, which implement the Economy Act of 1932 and other
requirements, are neither applicable to nor required for inclusion in the inter-Agency
agreement).
• The name of the DHS technical program manager responsible for technical program
direction.
• The signature of a DHS official authorized to approve inter-Agency agreements. (At
most agencies, these documents are typically signed by a contracting officer or other
official with delegated authority.)
• Billing data, such as the names and mailing addresses of the performing and the DHS
accounting offices and the Agency Location Code.
• A fund citation (DHS appropriation account used to fund the work).
• Description of any statutory or other limits on the use of funds (e.g., expiration of funds).
• Full funding for work to be completed within the current fiscal year or current fiscal year
funding plus first 3 months of following fiscal year if work extends over to the next fiscal
year.
• Identification of any changes from the DOE approved proposal prepared in Step 1 such
as—
—reporting requirements and release of information requirements, including
records/reports distribution;
—disposition of property and equipment at completion of work; or
—security classification requirements.
CANCELE
D
Attachment 4 DOE N 481.1A
Page 6 4-21-03
When DOE completes its review and is satisfied as to the adequacy of the information provided
by DHS, the DOE contracting officer will sign the inter-Agency agreement.
The signing of the inter-Agency agreement obligates DOE to perform the work described in the
proposal package. At this time, DOE notifies the DOE contractor of the acceptance of the
inter-Agency funding agreement and authorizes the contractor to begin work.
Step 3—Performance of Work and Project Closeout
Step 3 begins after DOE authorizes the contractor to start work. DOE and its contractor are
responsible for performing the work described in the statement of work contained in the proposal
package. The contractor is also responsible for ensuring milestones and deliverables are met,
reporting progress to DHS, and ensuring compliance with all DOE ES&H, financial, and other
contract requirements. At DHS’s election, a qualified DHS official may be designated as a
contracting officer’s representative (COR) in relation to the approved DHS work, recognizing
that activities and direction to DOE contractors must be consistent with the COR’s authority and
kept within the approved proposal package statement of work and the terms and conditions of
DOE’s contract. Issues raised during the performance and closeout stages will be addressed by
the DOE contracting officer, supported by DOE program personnel, and the DHS representative.
Any unresolved issues will be referred to the cognizant DOE Secretarial Officer for resolution
with designated DHS representatives.
Section 8
DHS will be responsible for paying monthly invoices and assessing technical work progress,
including contractor compliance with schedule and cost requirements. DOE involvement at this
stage is to provide general management oversight of the activities at its facilities; ensure
compliance with DOE contract, policies, and procedures; perform contract administration duties;
transmit monthly invoices (whether physical or electronic) to the DHS; and resolve issues
between DHS and the contractor. A project will be considered completed once the contractor
provides DHS with the final agreed deliverables. When the final costs, excluding audit and
related adjustments, are known, DOE or its contractor bills the DHS for the final costs. DHS
will be informed if the project involves subcontract costs that will be audited and might result in
later adjustments to those costs.
After the DOE contractor or DHS notifies DOE that the final deliverables have been completed
and accepted, project closeout may begin. Unless DHS has a special interest in an expedited
closeout process, the contractor will begin these procedures as soon as practical. After project
completion, additional costs are not to be incurred by the DOE contractor for additional work,
and only costs incurred to close out the project are allowable. In order to complete the project
closeout, the contractor will identify any remaining unexpended funds. DOE will then provide
DHS the necessary documentation to deobligate the remaining funds. The project will be
officially closed out only after DHS accepts the final DOE-proposed deobligation of funds, if
any. DOE funding will not be used to perform closeout activities.
CANCELE
D
DOE N 481.1A Attachment 4
4-21-03 Page 7 (and Page 8)
Prepares Proposal Package
(SOW, Cost Estimate,
Schedule, Deliverables)
DOEContractor DHS
Presents
Requirements,
Statement of
Work/Objectives
Forwards Proposal
Package
to DOE and DHS
Approves Project
Scope,
Terms & Conditions,
Costs
Notifies DHS of
DOE Approval
Reviews
Proposal
Package
Approves Proposal and
Prepares DHS Interagency
Agreement
Sends Interagency
Agreement
to DOE
DOE CO
Acceptance of Funds,
Authorizes Contractor
to Begin Work
Contractor Begins Work
Figure 1. DOE-DHS reimbursable agreement process.
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
CANCELE
D
DOE N 481.1A Attachment 4, Appendix B
4-21-03 Page B-1
APPENDIX B. DEPARTMENT OF ENERGY
FEDERAL AND CONTRACTOR POINTS OF CONTACT
The following is a list of contacts provided for use by the Department of Homeland Security
(DHS) managers responsible for placing work at Department of Energy (DOE) laboratories and
production facilities. The list includes individuals responsible for various program, policy and
procedural functions. DOE Headquarters program contacts generally provide assistance with
policy and program guidance and are responsible for oversight of DOE facilities. Normally,
these individuals will not be involved in the negotiation, review, and approval of individual DHS
reimbursable agreements. DOE business contacts are local Federal employees who manage
work conducted under management and operating (M&O) contracts. These contacts also
coordinate DOE review and approval of project proposal packages to ensure agreements are fully
compliant with applicable laws, regulations and M&O contracts. Laboratory business contacts
are site contractor personnel who oversee the development of project proposal packages and
other documentation required to meet applicable laws, regulations and DOE polices and
procedures. Additionally, they will coordinate the project proposal packages with DHS and
DOE for review and approval. Laboratory technical contacts are contractor staff involved in
specific research and science and best positioned to discuss technical capabilities available to
DHS.
Section 9
To ensure DOE and its facilities are efficient and responsive to DHS needs, it is strongly
suggested that DHS managers initially contact the laboratory business or technical office points
of contact when requesting DOE assistance.
DOE/NNSA
HEADQUARTERS
PROGRAM OFFICE
CONTACT
NAME OF
CONTACT
TELEPHONE
EMAIL ADDRESS
NATIONAL NUCLEAR SECURITY
ADMINISTRATION (NNSA)
Michael E. Long 202-586-4595 or
301-903-4284
Michael.Long@nnsa.doe.gov
OFFICE OF SCIENCE (SC) John M. LaBarge, Jr. 202-586-9747 John.labarge@science.doe.gov
OFFICE OF FOSSIL ENERGY (FE) William E. Fernald 301-903-9448 William.Fernald@hq.doe.gov
OFFICE OF ENVIRONMENTAL
MANAGEMENT (EM)
Claire H. Sink 301-903-7928 claire.sink@em.doe.gov
OFFICE OF INTELLIGENCE (IN) Michael C. Mazaleski 202-586-8718 mike.mazaleski@hq.doe.gov
CANCELE
D
mailto:Michael.Long@nnsa.doe.gov
mailto:Johm.labarge@science.doe.gov
mailto:William.Fernald@hq.doe.gov
mailto:claire.sink@em.doe.gov
mailto:mike.mazeleski@hq.doe.gov
Important!
For an updated listing of this information please contact A. Scott Geary at andrew.geary@hq.doe.gov or (202) 586-3299.
Attachment 4, Appendix B DOE N 481.1A
Page B-2 4-21-03
LABORATORY/CONTACT
TYPE
NAME OF
CONTACT
TELEPHONE
EMAIL ADDRESS
ALBANY RESEARCH CENTER (ARC)........................................................................................Program Office: (SC)
Lab Technical Contact Richard P. Walters 541-967-5873 walters@alrc.doe.gov
Lab Business Contact Max C. Lewis 541-967-5901 lewis@alrc.doe.gov
DOE/NNSA Business Contact George J. Dooley 541-967-5893 dooley@alrc.doe.gov
AMES (SC).........................................................................................................................................Program Office: (SC)
Lab Technical Contact David P. Baldwin 515-294-2069 dbaldwin@ameslab.gov
Lab Business Contact Debra Covey 515-294-1048 covey@ameslab.gov
DOE/NNSA Business Contact Jean Black 630-252-9015 Jean.Black@ch.doe.gov
ARGONNE NATIONAL LABORATORY (ANL) .........................................................................Program Office: (SC)
Lab Technical Contact Harvey Drucker 630-252-3804 drucker@anl.gov
Lab Business Contact Richard Combs 630-252-6797 Rcombs@anl.gov
DOE/NNSA Business Contact Roberta Dalton 630-252-2229 roberta.dallton@ch.doe.gov
BROOKHAVEN NATIONAL LABORATORY (BNL).................................................................Program Office: (SC)
Lab Technical Contact Paul D. Moskowitz 631-344-5062 moskowit@bnl.gov
Lab Business Contact Michael Sebastino 631-344-3312 Sebastino@bnl.gov
DOE/NNSA Business Contact Robert Gordon 631-344-3346 rgordon@bnl.gov
FERMI NATIONAL ACCELERATOR LABORATORY (FNL) .................................................Program Office: (SC)
Lab Technical Contact Bruce L. Chrisman 630-840-2359 chrisman@fnal.gov
Lab Business Contact Bruce L. Chrisman 630-840-2359 chrisman@fnal.gov
DOE/NNSA Business Contact John Chapman 630-840-4122 john.chapman@ch.doe.gov
IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) .....Program Office: (EM)
Lab Technical Contact Rebecca Winston 208-526-1165 RZW@inel.gov
Lab Business Contact Chuck Briggs 208-526-0441 cwb@inel.gov
DOE/NNSA Business Contact Donald McDonald 208-526-6520 macdondw@id.doe.gov
KANSAS CITY PLANT (KCP)........................................................................................................Program Office: (NNSA)
Lab Technical/Bus Contact Alan Updike 816-997-2605 aupdike@kcp.com
Section 10
Lab Technical/Bus Contact Paul Bartak 816-997-2457 pbartak@kcp.com
DOE/NNSA Business Contact Ken Bauer 816-997-3917 kbauer@kcp.com
LAWRENCE BERKELEY (LBNL) ................................................................................................Program Office: (SC)
Lab Technical Contact William A. Barletta 510-486-5408 wabarletta@lbl.gov
Lab Business Contact Jeffrey Weiner 510-486-7143 Jeff_Weiner@lbl.gov
DOE/NNSA Business Contact Sandie Silva 510-486-4346 sandie.silva@oak.doe.gov
CANCELE
D
mailto:walters@alrc.doe.gov
mailto:lewis@alrc.doe.gov
mailto:dooley@alrc.doe.gov
mailto:dbaldwin@ameslab.gov
mailto:covey@ameslab.gov
mailto:Jean.Black@ch.doe.gov
mailto:drucker@anl.gov
mailto:Rcombs@anl.gov
mailto:roberta.dallton@ch.doe.gov
mailto:moskowit@bnl.gov
mailto:Sebastino@bnl.gov
mailto:rgordon@bnl.gov
mailto:chrisman@fnal.gov
mailto:chrisman@fnal.gov
mailto:john.chapman@ch.doe.gov
mailto:RZW@inel.gov
mailto:cwb@inel.gov
mailto:macdondw@id.doe.gov
mailto:aupdike@kcp.com
mailto:pbartak@kcp.com
mailto:kbauer@kcp.com
mailto:wabarletta@lbl.gov
mailto:Jeff_Weiner@lbl.gov
mailto:sandie.silva@oak.doe.gov
DOE N 481.1A Attachment 4, Appendix B
4-21-03 Page B-3
LABORATORY/CONTACT
TYPE
NAME OF
CONTACT
TELEPHONE
EMAIL ADDRESS
LAWRENCE LIVERMORE NATIONAL LABORATORY (LLNL) .......................................... Program Office: (NNSA)
Lab Technical Contact Donald Prosnitz 925-422-7504 Prosnitz1@llnl.gov
Lab Business Contact Kathy Baker 925-424-5171 Baker51@llnl.gov
DOE/NNSA Business Contact Carol Morreira 925-422-2265 carol.morreira@oak.doe.gov
LOS ALAMOS TECHNICAL NATIONAL LABORATORY (LANL)........................................Program Office: (NNSA)
Lab Technical Contact Tom W. Meyer 505-665-8031 tmeyer@lanl.gov
Lab Business Contact Erika M. Sanchez 505-667-9822 emsanchez@lanl.gov
DOE/NNSA Business Contact Dennis Olona 505-845-4296 dolona@doeal.gov
NATIONAL ENERGY TECHNOLOGY LABORATORY (NETL) ............................................Program Office: (FE)
Lab Technical Contact Leonard Graham 304-285-4714 Leonard.graham@netl.doe.gov
Lab Business Contact Dale Siciliano 412-386-6073 Dale.siciliano@netl.doe.gov
DOE/NNSA Business Contact Dale Siciliano 412-386-6073 Dale.siciliano@netl.doe.gov
NATIONAL RENEWABLE ENERGY LABORATORY..............................................................Program Office: (FE)
Lab Technical Contact John Thornton 303-384-6469 john_thornton@nrel.gov
Lab Business Contact Jennifer Schofield 303-384-7424 Jennifer_schofield@nrel.gov
DOE/NNSA Business Contact Steven L. Scott 303-275-4724 Steve_scott@nrel.gov
NEVADA TEST SITE (NTS)............................................................................................................Program Office: (NNSA)
Lab Technical Contact Mike Canavan 702-295-5442 canavama@nv.doe.gov
Lab Business Contact Mike Canavan 702-295-5442 canavama@nv.doe.gov
DOE/NNSA Business Contact Cynthia Miyashiro 702-295-1497 Miyashiro@nv.doe.gov
OAK RIDGE INSTITUTE OF SCIENCE AND EDUCATION (ORISE) ....................................Program Office: (SC)
Lab Technical Contact Rebecca Kennard 865-576-8533 kennardb@orau.gov
Lab Business Contact Rebecca Kennard 865-576-8533 kennardb@orau.gov
DOE/NNSA Business Contact James A. Reafsnyder 865-241-4670 reafsnyderja@oro.doe.gov
OAK RIDGE NATIONAL LABORATORY (ORNL) ...................................................................Program Office: (SC)
Lab Technical Contact Michael Kuliasha 865-574-4169 kuliashama@ornl.gov
Section 11
Lab Business Contact Ed Harris 865-574-9931 harriseb@ornl.gov
DOE/NNSA Business Contact James A. Reafsnyder 865-241-4670 reafsnyderja@oro.doe.gov
PACIFIC NORTHWEST NATIONAL LABORATORY ..............................................................Program Office: (SC)
Lab Technical Contact Ned A. Wogman 509-372-6833 Ned.wogman@pnl.gov
Lab Business Contact Bruce K. Simanton 509-376-0161 bruce.simanton@pnl.gov
DOE/NNSA Business Contact Lynnette Downing 509-372-4010 Lynette_r_downing@rl.doe.gov
CANCELE
D
mailto:Prosnitz1@llnl.gov
mailto:Baker51@llnl.gov
mailto:carol.morreira@oak.doe.gov
mailto:tmeyer@lanl.gov
mailto:emsanchez@lanl.gov
mailto:dolona@doeal.gov
mailto:Leonard.graham@netl.doe.gov
mailto:Dale.siciliano@netl.doe.gov
mailto:Dale.siciliano@netl.doe.gov
mailto:john_thornton@nrel.gov
mailto:Jennifer_schofield@nrel.gov
mailto:Steve_scott@nrel.gov
mailto:canavama@nv.doe.gov
mailto:canavama@nv.doe.gov
mailto:Miyashiro@nv.doe.gov
mailto:kennardb@orau.gov
mailto:kennardb@orau.gov
mailto:reafsnyderja@oro.doe.gov
mailto:kuliashama@ornl.gov
mailto:harriseb@ornl.gov
mailto:reafsnyderja@oro.doe.gov
mailto:Ned.wogman@pnl.gov
mailto:bruce.simanton@pnl.gov
mailto:Lynette_r_downing@rl.doe.gov
Attachment 4, Appendix B DOE N 481.1A
Page B-4 4-21-03
LABORATORY/CONTACT
TYPE
NAME OF
CONTACT
TELEPHONE
EMAIL ADDRESS
PANTEX PLANT (PP)......................................................................................................................Program Office: (NNSA)
Lab Technical Contact Michelle Sumner 806-477-5255 msumner@pantex.com
Lab Business Contact Larry Supina 806-477-4806 lsupina@pantex.com
DOE/NNSA Business Contact Gary Wisdom 806-477-3104 gwisdom@doe.pantex.gov
PRINCETON PLASMA PHYSICS LABORATORY (PPPL).......................................................Program Office: (SC)
Lab Technical Contact Lewis D. Meixler 609-243-3009 lmeixler@pppl.gov
Lab Business Contact Ed Winkler 609-243-2218 EWinkler@pppl.gov
DOE/NNSA Business Contact Greg Pitonak 630-243-3713 gpitonak@pppl.gov
SANDIA NATIONAL LABORATORY (SNL) ...............................................................................Program Office: (NNSA)
Lab Technical Contact T.J. Allard 505-844-5581 tjallard@sandia.gov
Lab Business Contact Deborah Payne 505-845-8449 dnpayne@sandia.gov
DOE/NNSA Business Contact Dennis Olona 505-845-4296 dolona@doeal.gov
SANVANNAH RIVER SITE (SRS) .................................................................................................Program Office:(EM)
Lab Technical Contact Tony Woltermann 803-725-3533 tony.woltermann@srs.gov
Lab Business Contact Ron Schroder 803-725-8348 ronald.schroder@srs.gov
DOE/NNSA Business Contact N/A N/A N/A
STANFORD LINEAR ACCELERATOR CENTER (SLAC)........................................................Program Office: (SC)
Lab Technical Contact Dr. Fred V. Murphy 650-926-4175/2993 fvm@slac.stanford.edu
Lab Business Contact Dr. Fred V. Murphy 650-926-4175/2993 fvm@slac.stanford.edu
DOE/NNSA Business Contact Katherine Woo 650-926-2370 Katherine.woo@oak.doe.gov
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY (TJNAF).........................Program Office: (SC)
Lab Technical Contact Fred Dylla 757-269-7450 dylla@jlab.org
Lab Business Contact Fred Dylla 757-269-7450 dylla@jlab.org
DOE/NNSA Business Contact Wayne Skinner 757-269-7143 skinner@jlab.org
Y-12 NATIONAL SECURITY COMPLEX (Y-12) ........................................................................Program Office: (NNSA)
Lab Technical Contact Tom Berg 865-574-0907 bergta@y12.doe.gov
Section 12
Lab Business Contact Tom Berg 865-574-0907 bergta@y12.doe.gov
DOE/NNSA Business Contact Robin Spradlen 865-576-9662 spradlenrq@y12.doe.gov
CANCELE
D
mailto:msumner@pantex.com
mailto:lsupina@pantex.com
mailto:gwisdom@doe.pantex.gov
mailto:lmeixler@pppl.gov
mailto:EWinkler@pppl.gov
mailto:gpitonak@pppl.gov
mailto:tjallard@sandia.gov
mailto:dnpayne@sandia.gov
mailto:dolona@doeal.gov
mailto:tony.woltermann@srs.gov?subject=Quick Message from ShRINE PhoneBook
mailto:ronald.schroder@srs.gov?subject=Quick Message from ShRINE PhoneBook
mailto:fvm@slac.stanford.edu
mailto:fvm@slac.stanford.edu
mailto:Katherine.woo@oak.doe.gov
mailto:dylla@jlab.org
mailto:dylla@jlab.org
mailto:skinner@jlab.org
mailto:bergta@y12.doe.gov
mailto:bergta@y12.doe.gov
mailto:spradlenrq@y12.doe.gov
DOE N 481.1A Attachment 4, Appendix C
4-21-03 Page C-1 (and Page C-2)
LABORATORY-DIRECTED RESEARCH AND DEVELOPMENT
COST INSTRUCTIONS
Estimated Laboratory-Directed Research and Development (LDRD) costs (dollar amount
rounded to nearest thousand) must be separately identified in Department of Homeland Security
(DHS) project cost proposals. Additionally, the following language must be included in the
cover letter accompanying a new and/or revised DHS proposal:
“Consistent with the Department of Energy’s (DOE’s) full cost recovery policy, DOE collects,
as part of its standard indirect cost rate, a Laboratory-Directed Research and Development
(LDRD) cost levied on all monies received at the laboratory. The estimated amount of LDRD
costs is identified in the Department of Homeland Security (DHS) proposal cost estimate section.
DOE believes that LDRD efforts provide opportunities in research that are instrumental in
maintaining cutting-edge science capabilities that benefit all of the customers at the laboratory.
The Department will conclude that by approving and providing funds to DOE to perform work
under this proposal you acknowledge that such activities support the missions of DHS and are
consistent with appropriations acts that provide funds to you.”
The following language must be included in each DHS funding acceptance document.
“Consistent with the Department of Energy’s (DOE’s) full cost recovery policy, DOE collects,
as part of its standard indirect cost rate, a Laboratory-Directed Research and Development
(LDRD) cost. Based on the amount of funds accepted for this project, $ __________ represents
an estimated amount that will be used for LDRD efforts. DOE believes that LDRD efforts
provide opportunities in research that are instrumental in maintaining cutting-edge science
capabilities that benefit all of the customers at the laboratory. The Department will conclude that
by providing funds to DOE to perform work, you acknowledge that such activities support the
missions of the Department of Homeland Security and are consistent with appropriations acts
that provide funds to you.”CANCELE
D
1. Objective
2. Cancellations
3. Applicability
4. Background
5. Requirements
6. Contact
Attachment 1 - DOE Organizations to which this Notice is applicable
Attachment 2 - Contractor Requirements Document
Attachment 3 - MOA Between DOE and DHS
Attachment 4 - DOE Reimbursable Work Procedures for the DHS
Contents
1. Introduction
2. DHS Reimbursable Work Process Description
DHS Process Flow Chart
Att. 4, Appendix A - MOA Between DOE and DHS
Att. 4, Appendix B - DOE Federal and Contractor POCs
Att. 4, Appendix C - Laboratory-Directed Research and Development Cost Instructions