DOE N 473.7, Explosive Detection Program
Functional areas: Physical Security, Safeguards, Security, and Emergency Management, Work Processes
To standardize and accelerate implementation of the Department of Energy (DOE) explosive detection program.
DOE N 251.40, dated 5/3/01, extends this directive until 12/31/01.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DISTRIBUTION: INITIATED BY:
All Department Elements Office of Safeguards and Security
U.S. Department of Energy NOTICE
Washington, D.C.
SUBJECT: EXPLOSIVE DETECTION PROGRAM
1. OBJECTIVE. To standardize and accelerate implementation of the Department of Energy
(DOE) explosive detection program.
2. CANCELLATION. None
3. APPLICABILITY.
a. General. The requirements in this Notice apply to DOE, including the National
Nuclear Security Administration, and DOE contractor facilities and operations, on
DOE-owned or -leased property.
b. Contractors. Attachment 1 contains the Contractor Requirements Document (CRD).
The requirements in the CRD apply to the extent set forth in a contract.
c. Exclusions. Consistent with the responsibilities identified in Executive Order 12344,
the Deputy Administrator for Naval Reactors will determine the applicability of this
Notice for activities and facilities under his control.
4. REQUIREMENTS. DOE O 470.1, SAFEGUARDS AND SECURITY PROGRAM, dated
9-28-95, requires that DOE facilities and personnel be protected from activities undertaken
by inside and/or outside adversaries using a variety of available weapons, including
explosives. DOE M 5632.1C-1, MANUAL FOR PROTECTION AND CONTROL OF
SAFEGUARDS AND SECURITY INTERESTS, dated 7-15-94, establishes DOE
requirements for entry point screening, including screening for explosives. Those
requirements remain in effect. The following are intended to clarify and expand on the
requirements already established by DOE M 5632.1C-1.
a. PA and MAA Screening. All personnel, vehicles, packages, and cargo must be
screened for explosives prior to entering either a protected area (PA) or materials
access areas (MAAs). A second screening at the MAA is not required when a
thorough screening for explosives is conducted at the PA perimeter entry control
point and when no bypass paths exists. The screening must be able to detect the
spectrum of common explosives that are known to be available, e.g., dynamite,
Semtex, cyclotrimethylenetrinitramine (RDX), pentaerythritol tetranitrate (PETN),
trinitrotoluene (TNT).
1. Technologies/methodologies contained in the Chapter 10 of the Sandia National
Laboratories Explosive Protection Technology Transfer Manual must be used to
supplement the screening process at MAA and PA boundaries.
DOE N 473.7
Approved: 10-26-00
Expires: 04-30-01
CANCELE
D
DOE N 473.7 2
10-26-00
2. Dog/handler teams trained to detect explosives may be used in place of
explosive detection systems.
b. Security Area Screening. Criteria for screening of DOE and contractor personnel,
packages, and vehicles at security areas will be established by the local authority for
safeguards and security.
c. Analysis of explosives-related vulnerabilities. Notwithstanding the implementation
of the methodologies prescribed in this section, sites must analyze the potential
impact of adversary action involving the use of explosives and, where indicated,
mitigate this impact by implementing appropriate security and /or emergency response
measures.
5. RESPONSIBILITIES.
a. Heads of DOE Elements and National Nuclear Security Administration, Chief of
Defense Nuclear Security.
1. DOE and NNSA organizations that do not currently meet the requirements
set forth in this Notice must submit an implementation plan to their
respective Program Secretarial Office, or the Office of Security Support
for NNSA sites for approval, and to the Director, Office of Security and
Emergency Operations for coordination, no later than 90 days from the
date of this notice, identifying the equipment, resources, and other
operating cost of implementing these requirements.
Section 2
2. Will ensure execution of the explosive detection implementation plan at
their cognizant facilities.
b. Director, Office of Security and Emergency Operations. Reviews and coordinates
in the implementation plan for those facilities not meeting current Departmental
requirements contained in Paragraph 4.
6. RESOURCES. Funding to carry out the responsibilities of this Notice will be allocated
by the Program Offices from the direct funded security budget.
7. CONTACT. To obtain assistance concerning this Notice, contact the Office of
Safeguards and Security, at (301) 903-5693.
BY ORDER OF THE SECRETARY OF ENERGY:
T.J. GLAUTHIER
Deputy Secretary
CANCELE
D
DOE N 473.7 Attachment 1
10-26-00 Page 1 (and 2)
CONTRACTOR REQUIREMENTS DOCUMENT
DOE N 473.7, EXPLOSIVE DETECTION PROGRAM
Department of Energy (DOE) contractors, including the NNSA contractors, must ensure that all
aspects of the Department’s program to prevent the adversarial use of explosives at DOE
facilities are implemented.
All DOE facilities and personnel must be protected from activities undertaken by both inside and
outside adversaries using a variety of available weapons, including explosives, see DOE O 470.1,
Safeguards And Security Program, dated 9-28-95. DOE requirements for entry point screening,
including explosives, must be implemented, see DOE M 5632.1C-1, Manual for Protection and
Control of Safeguards and Security Interests, dated 7-15-94. Those requirements remain in effect.
The following are intended to clarify and expand on the requirements already established by
DOE M 5632.1C-1. Facilities not meeting the requirements, as clarified, shall submit an
implementation plan which includes a list of equipment and resources needed for
implementation. This implementation plan shall be submitted within 90 days of the date of this
notice.
a. PA and MAA Screening. All personnel, vehicles, packages, and cargo must be
screened for explosives prior to entering either a protected area (PA)or materials
access areas (MAAs). A second screening at the MAA is not required when a
thorough screening for explosives is conducted at the PA perimeter access control
point and when no bypass paths exists. The screening must be able to detect the
spectrum of common explosives that are known to be available, e.g., dynamite,
Semtex, cyclotrimethylenetrinitramine (RDX), pentaerythritol tetranitrate (PETN),
trinitrotoluene (TNT).
1. Technologies/methodologies contained in Chapter 10 of the Sandia
National Laboratories Explosive Protection Technology Transfer Manual
must be used to supplement the screening process at MAA and PA
boundaries.
2. Dog/handler teams trained to detect explosives may be used in place of
explosive detection systems.
b. Security Area Screening. Criteria for screening of DOE and contractor personnel,
packages, and vehicles at security areas will be established by the local authority
for safeguards and security.
c. Analysis of explosives-related vulnerabilities. Notwithstanding the
implementation of the methodologies prescribed in this section, sites must analyze
the potential impact of adversary action involving the use of explosives and, where
indicated, mitigate this impact by implementing appropriate security and /or
emergency response measures.
CANCELE
D