DOE N 3131.1, Access to Skills, Knowledge and Abilities of Retired Scientists and Engineers for the Nuclear Weapons Program
Functional areas: Reserved
Canceled by DOE O 350.1, 9-30-1996.
Superseded By:
DOE O 350.1, Contractor Human Resource Management Programs on Sep 30, 1996
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE O 350.1Contractor Human Resource Management Programs (Sep 30, 1996)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DOE 3220.1A
5-14-92
THIS PAGE MUST BE KEPT WITH DOE 3220.1A. MANAGEMENT OF
CONTRACTOR PERSONNEL POLICIES AND PROGRAMS
DOE 3220. 1A, MANAGMENT OF CONTRACTOR PERSONNEL POLICIES AND
PROGRAMS, HAS REVISED DOE 3220.1 TO REFLECT ORGANIZATIONAL
TITLE, ROUTING SYMBOL, AND OTHER EDITORIAL REVISIONS TO
INCORPORATE CHANGES REQUIRED BY SEN-6. NO SUBSTANTIVE CHANGES
HAVE BEEN MADE. DUE TO THE NUMBER OF PAGES AFFECTED BY THE
REVISIONS, THE ORDER HAS BEEN ISSUED AS A REVISION.
5-14-92
SUBJECT: MANAGEMENT OF CONTRACTOR PERSONNEL POLICIES AND PROGRAMS
1.
2.
3.
4.
5.
6.
PURPOSE. To establish organizational responsibilities and procedures
for the review and approval of costs for compensation of personal
services incurred by the Department of Energy (DOE) contractors.
CANCELLATION. DOE 3220.1, MANAGEMENT OF CONTRACTOR PERSONNEL POLICIES
AND PROGRAMS, of 3-4-81.
SCOPE . The provisions of this Order apply to contractors who are
performing operating and onsite service work, onsite construction, and
onsite architect-engineer work as defined in DOE PR 9-50.001. Excluded
from coverage are contractor personnel policies and programs subject to
the collective bargaining process.
BACKGROUND. It clarifies and implements the DOE Procurement Regulations
(DOE PR) concerning contract cost principles relative to contractor
compensation policies for personal services and other personnel related
costs applicable to operating and onsite service contracts.
DEFINITION. Compensation for Personal Services. It includes all
remuneration paid currently or accured, in whatever form and whether
paid immediately or deferred. for services rendered by employees of the
contractor during the period of contract performance. It also includes,
but is not limited to, salaries, wages, directors and executive
committee members fees, bonuses (including stock bonuses), incentive
awards, employee stock options. employee insurance, fringe benefits,
contributions to pension, annuity, management-employee incentive
compensation plans, and location allowances.
OBJECTIVE. To assure a stable and productive contractor work force to
carry out its production operation and research and development
programs.
a. DOE must assure that its operating and service contractors
establish and maintain personnel policies and programs which are
comparable with the competitive market. To achieve this objective
and to meet. DOE responsibility for the judicious control of
contractor personnel expenditures, the DOE reaches advance
agreements with contractors on reasonableness and allowability of
costs prior to incurrence.
DISTRIBUTION: INITIATED BY:
All Departmental Elements Office of Procurement, Assistance
and Program Management
2
DOE 3220.1A
5-14-92
b. This agreement is reached by either a negotiated “personnel
appendix” to the contract or DOE documented acceptance of
established personnel policies and programs applicable to the
contractor’s private operations and consistently followed
throughout its organization.
7. RESPONSIBILITIES AND AUTHORITIES.
a. Director of Procurement, Asistance and Program Managenent (PR-1)
shall:
(1) Coordinate with the Office of Administration and Human
Resource Management (AD-1) through the cognizant contracting
officers for:
(a) Advance review and assistance as needed in
negotiations of personnel appendices for those
contracts covered by this Order;
(b) Proposed changes to the DOE PR 9-50.15 related to
compensation for personal services; and
Section 2
(c) Proposed changes of other industrial relations matters
(e.g., labor standards).
(2) Provide for contracting officers to carry out the objectives
and requirements of this order and the policies as set forth
in the DOE PR.
(3) Establish and maintain cost principles relating to
allowability of cost for DOE operating and onsite service
contracts.
b. Director of Contractor Human Resource Management (PR-15), shall:
(1)
(2)
(3)
(4)
Assist and coordinate with PR-1, all proposed changes to the
DOE PR relating to compensation for personal services,
salary thresholds and related personnel costs.
Review and recommend to the contracting officer approval or
disapproval of advance understandings of compensation for
personal services (personnel appendices) negotiated at
Headquarters.
Recommend to the contracting officer approval or disap
of advanced understandings of compensation for personal
services and related costs which are negotiated at Field
Elements and submitted to Headquarters for review.
Provide assistance with the negotiations of personnel
appendices when requested by contracting officers.
proval
DOE 3220.1A
5-14-92
(5)
(6)
(7)
(8)
(9)
(10)
(11)
3
Establish annually a guideline for contractor salary
increase funds.
Review and approve all contractor salary increase funds
which exceed PR-1 guidelines.
Maintain liaison on wage price issues with the designated
Federal agency responsible for overall wage-price standards
affecting national economy.
Provide guidance to contracting officers on DOE wage-price
guidelines.
Review and approve individual contractor salary actions over
a specified amount, except salaries of directors and
managers of select DOE laboratories and facilities which
require approval of the Executive Personnel Board.
Provide advance review and approval or disapproval of
compensation surveys proposed by contractors for the
collection of data when such surveys are: (a) outside the
labor market area in which the contractor competes; or (b)
on a nationwide basis.
Coordinate with the Chief Financial Officer for the review
and concurrence of proposed contractors personnel policies
and new programs which have significant potential impact on
current/future DOE budgets and/or financial management.
c. Contracting Officer shall:
(1)
(2)
(3)
(4)
(5)
Negotiate advance understandings on allowable compensation
for personnel services with contractors as defined in the
scope of this Order.
Prepare, as appropriate, personnel appendices and
modifications thereto, setting forth agreements on
compensation of personal services.
Coordinate with PR-15 on issues (pension plans or insurance
programs) for which advance understandings cannot be reached
prior to cost incurrence and which require a retroactive
date.
Consult with PR-15 prior to contract approval of policies,
practices, and programs which may be novel or precedent
setting with significant cost impact.
Submit, after endorsement, individual contractor salary
actions, as specified by AD-1, in triplicate to PR-15 at
least 10 working days prior to the proposed effective date.
4
DOE 3220.1A
5-14-92
DOE Form AD-37 will be used for individual actions and a
salary list (Attachment. 1) for multiple actions (five or
more) from the same contractor.
(6) Coordinate with the Chier Financial Officer for the review
and concurrence of proposed contractors personnel policies
and new programs which have significant potential impact on
current/future DOE budgets and/or financial management.
Section 3
8. PROCEDURES AND REQUIREMENTS. In developing and negotiating an advance
understanding, the negotiating activity will:
a. Request required information data prior to negotiations and begin
DOE review concurrently with or prior to the major contract
negotiation.
b. Coordinate with other DOE Field Elements having contracts with the
same firm to avoid duplicate review and inconsistent
determinations of all
costs.
c. Minimize the allowab
that may be novel or
contractors competit
costs.
owability and reasonableness of personnel
ility of policies, programs, and schedules
more liberal than those prevailing in the
ive labor market with increased contract
d. Consult with PR-15 prior to approving policies, programs, and
schedules which may be novel or which may set a precedent for
other contracts or which may lead to a request to PR-1 for a
deviation from DOE PR.
e. Arrange with PR-15 for deferred approval of certain costs items
(e.g., pension plans or group insurance) when advance agreements
cannot be achieved.
9. ADVANCE AGREEMENT ON INCREASE FUNDS.
a. The “increase fund” is an overall amount of money or percentage of
payroll as of the beginning of the budget period which may be
used, but not exceeded, by the contractor in granting increases to
employees in the group(s) covered by the fund. The “increase
fund” should include all increases in base wages and salaries
within approved ranges regardless of the reason for the increase
(e.g., merit. reclassification market, economic, promotion).
Separate controls over some increases may be established as
appropriate in a specific contract, situation.
DOE 3220.1A 5 (and 6)
5-14-92
b. To assure reasonableness of contractor wage and salary levels, DOE
must have control and approval authority over the amounts of money
or percentage of payroll (increase fund) to be expended for wage
and salary increases during the term of the contract. Each
personnel appendix should provide control over amounts to be
expended for compensation increases for groups of employees,
rather than amounts or percentages granted individuals.
10. BONUS AND INCENTIVE COMPENSATION PAYMENTS. Bonus and incentive payments
may be allowable costs provided they meet the specified requirements set
forth in DOE PR 9-50.1510.14(b). When such costs are proposed by the
contractor, the negotiating activity is to collect the following
information for its review:
a. Proposed Plans.
(1) A description of the plan and its scope in terms of types
and levels of employees covered and organization elements
and locations to which the plan is applicable.
(2) The rules for determining employee eligibility to receive a
bonus or incentive award.
(3) The formula for and method of generating the bonus or
incentive funds.
(4) The rules for determining the amounts or percentages of
awards and/or payments.
b. Extension of Existing Plans. Experience under the plan for each
of the last 2 years (show payments made during the year even if
the payment resulted from an award made in a prior year):
(1) Number of employees eligible for participation;
(2) Base payroll of employees eligible for participation;
(3) Number of employees receiving payments;
(4) Total amount of payments;
(5) Base payroll of employees receiving payments; and
(6) Amount of money set aside under the plan but not awarded.
BY ORDER OF THE SECRETARY OF ENERGY:
tno
10
-m
LIST OF PROPOSID SALARY lNCRIASES
-@
g w
t.oN
NW
o
Contractor
Individuals Recommended for Salary Increases $ and Over a Year
.
Consolan, Inc. Contract No.: 99-81WL32137.001., .
Annua 1
l%esent Proposed Increase
Job Base Base Dollar Pd. Bonus~/
Name Title U Salary (Hos) PaymentIncrease ~
Knott, I.D. Per. Dir. $45,000 $48,375 $3,375 7.5 12 $2,500
Prior
Increase
“~
j (YE
$4,000 14
Effec. 3 Year
Date
5/1/81
Rate (%)
6.8
Approving
Officials: O.K. Acosta C.O. Givens I,C, Almonv
Approved for Contr~~tor by Approved for DOE by Approval/Concurrence by
Contracting Officer 00[ Headquarters
March 1, 1981 March 21, 1981 April 1, 1981
ATE DATE DATE
1/ Incentive compensation orothcr salary adjustments.