Section 1
DISTRIBUTION: INITIATED BY:
All Departmental Elements Office of the Chief Information Officer
DOE N 203.1
U.S. Department of Energy NOTICE
Washington, D.C.
Approved: 10-02-00
Expires: 06-02-01
SUBJECT: SOFTWARE QUALITY ASSURANCE
1. OBJECTIVES. To define requirements and responsibilities for software quality assurance (SQA)
within the Department of Energy (DOE) to ensure that—
a. all software owned or maintained by DOE, as referenced in paragraph 3c, Applicability, is
subjected to formal quality assurance;
b. all DOE software engineering follows identified standards and best practices throughout the
project and product lifecycle;
c. due to the spectrum of requirements, the degree of SQA is risk-based; and
d. personnel are capable of correctly developing, using, and managing software.
2. CANCELLATION. None.
3. APPLICABILITY.
a. DOE Elements. This directive applies to Departmental elements that acquire, develop,
modify, or maintain computer software.
b. Contractors. The Contractor Requirements Document, Attachment 1, sets forth the
requirements to be applied to all management and operating and other contracts that
require the acquisition, development, modification, or maintenance of computer software, as
provided by contract and as implemented by the appropriate contracting officer.
Compliance with the Contractor Requirements Document will be required to the extent set
forth in the contract.
c. DOE Software. The provisions of this Notice apply to all DOE software or software
customized for DOE use, proposed for use, under development, or being maintained and
used, whether that software was developed in-house, licensed from a commercial vendor
for customized use, obtained from another organization, or otherwise acquired. The type of
software includes, but is not limited to (a) administrative/business-oriented software, (b)
scientific/engineering software except as identified in paragraph 3.d. below, (c)
manufacturing-oriented software, and (d) process control; (e.g., Programmable Logic
Control instructions).
2 DOE N 203.1
10-02-00
d. Basic Research Activities. The requirements of this Notice are not mandatory for basic
scientific research and development activities conducted to support the Office of Science
mission unless those activities are governed by the requirements in 10 CFR part 830.
However, line management is encouraged to consider all or part of the Notice requirements
in meeting its responsibilities to ensure the quality of the software developed for basic
research. Business systems that support basic research are not exempted from the Notice
requirements.
e. Exclusion. Executive Order 12344 (set forth in Public Law 106-65 of October 5, 1999
[50 U.S.C. 2406]) establishes the responsibilities and authority of the Director, Naval
Nuclear Propulsion Program, for all facilities and work that comprise the Program, which is
a joint Navy/DOE organization. The Director’s responsibilities include the operating
practices and procedures applicable to Naval nuclear propulsion plants. The Director must
establish the quality assurance requirements implemented within the Program. Accordingly,
this Notice does not apply to the Naval Reactors Program.
4. REQUIREMENTS.
a. This directive is effective upon issuance.
Section 2
b. SQA Program. Each Departmental element shall develop, document, and implement an
SQA program. Each SQA program will consist of an identified focal point of contact,
defined authorities, policies, procedures, training, adopted standards, and conventions
tailored to local needs. Each program will treat SQA initiatives appropriately,
commensurate with their size, complexity, cost, degree of external impact, degree of
customization, functions performed, and other factors important to local management. The
SQA program will describe how project SQA plans are to be developed and implemented.
c. Risk-Based, Graded Approach. All software, which is owned or maintained by DOE,
must be subjected to a degree of formal SQA commensurate with the safety, security, and
risk involved in developing and using the software. This approach allows all software,
including that which may be categorized as "research and development", to be assessed for
and receive an appropriate and commensurate amount of SQA.
d. Lifecycle-Based SQA Processes and Procedures. The SQA processes and procedures
used must be software product and project lifecycle based; documented to provide a
baseline for auditing; and applied in a consistent, repeatable, and predictable manner. The
adequacy of selected processes and practices, as well as their oversight, is the responsibility
of each individual Departmental element.
e. Project SQA Plans. Project SQA plans will be developed and address testing (e.g., unit,
integration, system, acceptance), verification and validation, structured walkthroughs, peer
DOE N 203.1 3
10-02-00
reviews, inspections, audits and any other requirements specified for an application (e.g., by
contract). Each plan should be commensurate with the level of the size, complexity, and
scope of the software project.
f. Oversight. Each Departmental element will conduct systematic reviews to ensure that the
requirements of this directive and DOE O 414.1A, QUALITY ASSURANCE, are met
and determine the need to update its own SQA program. Relative to software, these
reviews should also ensure that appropriate safety and security controls are in place, are
effective, and reflect currently accepted industry practices. For line management
assessment of an SQA program, the principles and guidelines in DOE P 450.5, LINE
ENVIRONMENT, SAFETY AND HEALTH OVERSIGHT, will apply and should be
followed.
g. Training. Sites are responsible for ensuring the adequacy of training programs to meet
current and future personnel skill needs in the areas of SQA, software engineering, and
software user training.
h. Integration. Sites must integrate the SQA program planning process with the strategic
planning, Safety Management System, and budget process, as appropriate, to ensure that
SQA program decisions are made, adequately funded, and executed to support DOE
organizational and site missions and priorities.
5. RESPONSIBILITIES.
a. Office of the Chief Information Officer.
(1) Establishes and maintains Departmentwide direction and guidance for SQA
management processes.
(2) Periodically reviews the results of internal and external compliance assessments and
determines if the Departmentwide direction and guidance need to be improved or
assistance provided.
b. Power Marketing Administrations. Execute program office responsibility, accountability,
and oversight for SQA management process compliance within their respective program
areas.
Section 3
c. Departmental Elements. Implement the appropriate level of management effort, and
assume responsibility, accountability, and oversight for continued SQA management
process compliance within their respective program areas. Specifically—
(1) Establish and document SQA programs.
(2) Identify a focal point of contact.
4 DOE N 203.1
10-02-00
(3) Ensure that the SQA programs conduct risk assessments and determine the level of
SQA to be applied.
(4) Ensure that the level of SQA is tailored to the site needs.
(5) Oversee development and implementation of SQA processes and procedures.
(6) Ensure the production and delivery of quality software products.
(7) Ensure that SQA programs are reviewed.
(8) Ensure SQA plans are approved.
(9) Relative to software, ensure that appropriate safety and security controls are in place,
are effective, and reflect currently accepted industry practices.
(10) Ensure the adequacy of training programs for SQA, software engineering and
software user training.
(11) Ensure that any SQA program related to safety is developed and implemented in a
manner that is consistent with DOE P 450.4, SAFETY MANAGEMENT SYSTEM
POLICY, and associated standards and manuals.
(12) Ensure that any nuclear software program related to safety is developed and
integrated with existing nuclear safety policies and standards.
(13) Ensure that all SQA programs are developed and implemented in a manner that is
consistent with applicable classified and/or unclassified policy.
d. Assistant Secretary for Environment, Safety, and Health (EH-1), acting as DOE's
independent element responsible for safety aspects relative to public and worker health, and
safety and environmental protection, shall provide advice and assistance to the Chief
Information Officer concerning policy requirements and guidance necessary to implement
this directive on software used for safety applications.
e. Deputy Assistant Secretary for Oversight, acting as the Department's independent element
responsible for the oversight of environment, safety, and health has the following
responsibilities.
(1) Assess and report to the Secretary of Energy on all aspects of safety related to
implementation of this directive, including performance of the Secretarial Offices, field
elements and contractors.
(2) Review and comment on proposed SQA policy, regulations, standards and
requirements to assess their potential effects on the safety of operations at DOE
facilities.
DOE N 203.1 5
10-02-00
f. Director, Office of Independent Oversight and Performance Assurance, acting as the
Department's independent element responsible for the oversight of safeguards and security
has the following responsibilities.
(1) Assess and report to the Secretary of Energy on all aspects of safeguards and
security related to implementation of this directive, including performance of the
Secretarial Offices, field elements and contractors.
(2) Review and comment on proposed SQA policy, regulations, standards and
requirements to assess their potential effects on the security of operations at DOE
facilities.
6. IMPLEMENTATION. Implementation of this directive is site-specific. An implementation plan
that describes the actions necessary to comply with this directive and the expected date for
completing those actions must be submitted to the applicable Program Secretarial Office (PSO)
or Power Marketing Administration management 90 days after the approval date of this directive.
Where there are multiple programs, coordination should be implemented by the Lead Program
Secretarial Officers. SQA program plans should be approved by PSOs within 120 days of
receipt.
Section 4
7. ASSESSMENTS OF SQA IMPLEMENTATIONS. Assessments of SQA implementations of
this directive will be forwarded to the Office of the Chief Information Officer.
8. REFERENCES.
a. 10 CFR part 830, Nuclear Safety Management.
b. DOE O 414.1A, QUALITY ASSURANCE, dated 9-29-99.
c. DOE O 5480.23, NUCLEAR SAFETY ANALYSIS REPORTS, dated 4-10-92.
d. DOE P 450.4, SAFETY MANAGEMENT SYSTEM POLICY, dated 10-15-96.
e. DOE P 450.5, LINE ENVIRONMENT, SAFETY AND HEALTH OVERSIGHT, dated
6-26-97.
f. DOE S 1027-92, HAZARD CATEGORIZATION AND ACCIDENT ANALYSIS
TECHNIQUES FOR COMPLIANCE WITH DOE ORDER 5480.23, NUCLEAR
SAFETY ANALYSIS REPORTS, updated 9-97.
g. DOE G 200.1-1, DEPARTMENT OF ENERGY SOFTWARE ENGINEERING
METHODOLOGY, dated 5-21-97.
6 DOE N 203.1
10-02-00
h. DOE G 414.1-2, QUALITY ASSURANCE MANAGEMENT SYSTEM GUIDE FOR
USE WITH 10 CFR 830.120 AND DOE O 414.1, dated 7-17-99.
i. Quality Criteria (QC-1), invoked via reference in DOE/AL Supplemental Directive 56XB
(Nuclear Weapon Development and Production Manual).
9. CONTACT. For additional information or assistance in interpreting or implementing this
directive, please contact the Office of the Chief Information Officer at 202-586-0166.
10. DEFINITIONS. To promote a common understanding of SQA and systems engineering
concepts, the following definitions are provided.
a. Acceptance Testing. Formal testing conducted to determine whether or not a software
product or system satisfies its acceptance criteria and to enable the system owner to
determine whether or not to accept the product or system. IEEE Standard Glossary of
Software Engineering Terminology, Std. 610.12-1990.
b. Configuration Management (CM). A discipline applying technical and administrative
direction and surveillance to identify and document the functional and physical
characteristics of a configuration item, control changes to those characteristics, record and
report change processing and implementation status, and verify compliance with specified
requirements. IEEE Standard Glossary of Software Engineering Terminology, Std.
610.12-1990.
c. Departmental Element. A Departmental Element is defined as a first-tier organization at
Headquarters and in the Field. First-tier at Headquarters is the Secretary, Deputy
Secretary, Under Secretary, and Secretarial Officers (Assistant Secretaries and Staff Office
Directors). First-tier in the Field is Managers of the eight Operations Offices, Managers of
the three Field Offices, and the Administrators of the Power Marketing Administrations.
Headquarters and Field Elements are described as follows: (1) Headquarters Elements are
DOE organizations located in the Washington Metropolitan Area; and (2) “Field Elements”
is a general term for all DOE sites (excluding individual duty stations) located outside of the
Washington, DC, Metropolitan Area. DOE Glossary in the Directives System.
d. Information System. A combination of information, computer, and telecommunications
resources and other information technology and personnel resources that collects, records,
processes, stores, communicates, retrieves, and displays information. DOD Directive
#7920.1, Life Cycle Management of Automated Information Systems, 1988.
e. Integration Testing. Testing in which software components, hardware components, or both
are combined and tested to evaluate the interaction between them. IEEE Standard
Glossary of Software Engineering Terminology, Std. 610.12-1990.
DOE N 203.1 7
10-02-00
Section 5
f. Project Planning. The planning of project technical and management activities that are
documented in a project plan. The plan typically describes the work to be done, the
resources required, the methods to be used, the procedures to be followed, the schedules
to be met, and the way the project will be organized. It includes a list of deliverables,
actions required, and other key events needed to accomplish the project. DOE Software
Quality and Systems Engineering support team, 1999.
g. Project Tracking and Oversight. The tracking and reviewing of accomplishments and results
against documented estimates, commitments, and plans. Includes the adjusting of plans
based on actual accomplishments and results. DOE Software Quality and Systems
Engineering support team, 1999.
h. Quality Assurance. (1) A planned and systematic pattern of all actions necessary to provide
adequate confidence that the item or product conforms to established operational,
functional, and technical requirements. (2) A set of activities designed to evaluate the
process by which products are developed or manufactured. IEEE Standard Glossary of
Software Engineering Terminology, Std. 610.12-1990.
i. Quality Control.
(1) The process by which product correctness is determined and action is initiated when
nonconformance is detected.
(2) A line function; the work done within a process to ensure that the work product
conforms to standards/requirements. Effective Methods for Software Testing by
William Perry, John Wiley & Sons, 1995.
j. Requirements Management. In system/software system engineering, the process of
controlling the identification, allocation, and flowdown of requirements from the system level
to the module or part level, including interfaces, verification, modifications, and status
monitoring. Software Requirements Engineering, edited by Thayer & Dorfman, IEEE
Computer Society Press, 1997.
k. Risk Management. An approach to problem analysis that is used to identify, analyze,
prioritize, and control risks. DOE Software Engineering Methodology, March 1999.
l. Software Design. In software engineering, the process of defining the software architecture
(structure), components, modules, interfaces, test approach, and data for a software system
to satisfy specified requirements. Software Requirements Engineering, edited by Thayer
& Dorfman, IEEE Computer Society Press, 1997.
8 DOE N 203.1
10-02-00
m. Software Engineering. (1) The application of a systematic, disciplined, quantifiable
approach to the development, operation, and maintenance of software; that is, the
application of engineering to software. (2) The study of approaches as in (1). IEEE
Standard Glossary of Software Engineering Terminology, Std. 610.12-1990.
n. Software Quality Assurance. See Quality Assurance. IEEE Standard Glossary of
Software Engineering Terminology, Std. 610.12-1990.
o. System Testing. Testing conducted on a complete, integrated system to evaluate the
system's compliance with its specified requirements. IEEE Standard Glossary of
Software Engineering Terminology, Std. 610.12-1990.
p. Unit Testing. Testing of individual hardware or software units or groups of related
units. The isolated testing of each flowpath of code with each unit. The expected
output from the execution of the flowpath should be identified to allow comparisons
of the planned output against the actual output. DOE Software Engineering
Methodology, March 1999.
Section 6
q. Validation. The process of evaluating a system or component during or at the end of
the development process to determine whether it satisfies specified requirements.
IEEE Standard Glossary of Software Engineering Terminology, Std. 610.12-1990.
r. Verification. (1) The process of evaluating a system or component to determine
whether the products of a given development phase satisfy the conditions imposed at
the start of that phase. (2) Formal proof of program correctness. IEEE Standard
Glossary of Software Engineering Terminology, Std. 610.12-1990.
BY ORDER OF THE SECRETARY OF ENERGY:
T.J. GLAUTHIER
Deputy Secretary
DOE N 203.1 Attachment 1
10-02-00 Page 1-1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE N 203.1, SOFTWARE QUALITY ASSURANCE
The requirements in this Contractor Requirements Document must be applied to all management and
operating and other contracts that require the acquisition, development, modification, or maintenance of
computer software, as provided by contract and as implemented by the appropriate contracting officer.
Compliance with this Contractor Requirements Document will be required to the extent set forth in the
contract.
1. The provisions of this Contractor Requirements Document apply to DOE software or software
customized for DOE use, proposed for use, under development, or being maintained and used,
whether that software was developed in-house, licensed from a commercial vendor for
customized use, obtained from another organization, or otherwise acquired shall be subjected to
formal quality assurance. The type of software includes, but is not limited to—
(a) administrative/business-oriented software,
(b) scientific/engineering software within the context of considerations identified in number 2,
(c) manufacturing-oriented software, and
(d) process control (e.g., Programmable Logic Control instructions).
2. The provisions of this Contractor Requirements Document are not mandatory for basic scientific
research and development activities conducted to support the Office of Science mission unless
those activities are governed by the requirements in 10 CFR part 830. However, as directed,
contractor line management is encouraged to consider all or part of the Notice requirements in
meeting its responsibilities to ensure the quality of the software developed for basic research.
Business systems that support basic research are not exempted from the Contractor
Requirements Document provisions.
3. The contractor must develop, document, and implement an SQA program for projects under its
contract. Each SQA program will consist of an identified focal point of contact, defined
authorities, policies, procedures, training, adopted standards, and conventions tailored to local
needs. Each program will treat SQA initiatives appropriately, commensurate with their size,
complexity, cost, degree of external impact, degree of customization, functions performed, and
other factors important to the site's management.
4. The contractor must ensure all software, which is owned or maintained by DOE, is subjected to a
degree of formal SQA commensurate with the safety, security, and risk involved in developing
and using the software. This approach allows all software, including that which may be
categorized as "research and development", to be assessed for and receive an appropriate and
commensurate amount of SQA.
Attachment 1 DOE N 203.1
Page 1-2 10-02-00
Section 7
5. The contractor must ensure the SQA processes and procedures are software product and
project lifecycle based; documented to provide a baseline for auditing; and applied in a
consistent, repeatable, and predictable manner. The contractor must ensure the adequacy
of selected processes and practices, as well as their oversight.
6. The contractor must develop project SQA plans and address testing (e.g., unit, integration,
system, acceptance), verification and validation, structured walkthroughs, peer reviews,
inspections, audits and any other requirements specified for an application (e.g., by
contract). The contractor must ensure that each plan is commensurate with the level of the
size, complexity and scope of the software project. As appropriate, a standard SQA plan
may be adopted and/or adapted for subsequent projects within a program.
7. The contractor must conduct systematic reviews to ensure that the requirements of this
directive and DOE O 414.1A, QUALITY ASSURANCE, are met and determine the need to
update its own SQA program. Relative to software, these reviews should also ensure that
appropriate safety and security controls are in place, are effective, and reflect currently
accepted industry practices.
8. The contractor must ensure the adequacy of training programs to meet current and future
personnel skill needs in the areas of SQA, software engineering, and software user training.
9. The contractor must ensure the integration of the SQA program planning process with DOE
strategic planning, Safety Management System, and budget process, as appropriate, to
ensure that SQA program decisions are made, adequately funded, and executed to support
DOE organizational and site missions and priorities.