DOE M 442.1-1, Differing Professional Opinions Manual for Technical Issues Involving Environment, Safety, and Health
Functional areas: Defense Nuclear Facility Safety and Health Requirement, Environment, Safety, and Health, Requires Crosswalk When Revised, Safety
This Manual establishes a differing professional opinion (DPO) policy to a Department of Energy (DOE) Differing Professional Opinion (DPO) Process to encourage and facilitate dialogue and resolution on DPOs from employees for technical issues involving environment, safety, and health. Does not cancel other directives. Canceled by DOE O 442.2.
Superseded By:
Version history and related documents
Superseded by
A newer version replaces this document.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
MANUAL
DOE M 442.1-1
Approved: 11-16-06
DIFFERING PROFESSIONAL OPINIONS
MANUAL FOR TECHNICAL ISSUES
INVOLVING ENVIRONMENT, SAFETY
AND HEALTH
U.S. DEPARTMENT OF ENERGY
Office of Health, Safety and Security
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov Office of Nuclear Safety and Environment
DOE M 442.1-1 1
11-16-06
DIFFERING PROFESSIONAL OPINIONS MANUAL
FOR TECHNICAL ISSUES INVOLVING ENVIRONMENT, SAFETY, AND HEALTH
1. PURPOSE.
This Manual establishes a Department of Energy (DOE) Differing Professional Opinion
(DPO) process to encourage and facilitate dialogue and resolution on DPOs from
employees1 for technical issues involving environment, safety, and health (ES&H). This
process supplements DOE P 442.1, Differing Professional Opinions, dated 11-16-06. It
is not intended to circumvent other avenues for resolving technical disagreements but
rather to supplement existing processes. In particular, this process supplements the DOE
Employee Concerns Program established in DOE O 442.1A, Department of Energy
Employee Concerns Program, by providing a specific process for assessing and
addressing technical issues related to ES&H.
The process in this Manual is limited to addressing DPOs on technical issues related to
ES&H for DOE facilities and activities.
The Department recognizes that it takes courage to step outside current opinion and raise
an issue and it is committed to ensuring that DPOs can be raised without fear of
retaliation and are resolved in a timely and effective manner. Unless the disclosure is
specifically prohibited by law, employees are encouraged to engage in open, frank, and
unrestricted professional discussions across organizational boundaries on technical
issues, particularly those related to ES&H. Specific whistleblower protection is provided
for Federal employees in 5 United States Code (U.S.C.) § 2302, Prohibited Personnel
Practice and for DOE contractors in 10 CFR Part 708, DOE Contractor Employee
Protection Programs, and in Section 211 of the Energy Reorganization Act, as amended,
codified at 42 U.S.C. Sec. 5821 which provides DOE and DOE contractor whistleblower
protection.
This process may highlight ES&H concerns, which may require DOE or contractor
managers to stop or curtail work operations as authorized to place the facility or activity
in a safe condition until the DPO issue has been resolved.
2. CANCELLATIONS. None.
3. APPLICABILITY.
a. DOE Elements. Except for the exclusions in paragraph 3c, this Manual applies to
all Departmental elements and DOE Federal employees with respect to DPOs on
technical issues relating to ES&H. (Go to http://www.directives.doe.gov for the
current listing of Departmental elements. The list automatically includes all
1 For the purposes of this Manual, the term “employees” is defined consistent with DOE O 442.1A as any person
working for DOE, including NNSA or a DOE contractor or subcontractor, on a DOE project.
http://www.directives.doe.gov/cgi-bin/explhcgi?qry1863440316;doe-229
http://www.directives.doe.gov/cgi-bin/explhcgi?qry1863440316;doe-229
http://www.access.gpo.gov/nara/cfr/waisidx_06/10cfr708_06.html
http://www.access.gpo.gov/nara/cfr/waisidx_06/10cfr708_06.html
http://www.directives.doe.gov/
2 DOE M 442.1-1
11-16-06
Departmental elements created after the Order is issued). This Manual
automatically applies to Departmental elements created after it is issued.
Section 2
The Administrator of the National Nuclear Security Administration (NNSA) will
ensure that NNSA employees comply with their respective responsibilities under
this Manual. Nothing in this Manual will be construed to interfere with the
NNSA Administrator’s authority under section 3212(d) of Public Law
(P.L.) 106-65 to establish Administration specific policies, unless disapproved by
the Secretary.
b. Contractors. The CRD (Attachment 1) sets forth requirements that are to be
applied to contractors with responsibility for the design, construction,
management, operation, decontamination, decommissioning, or the demolition of
DOE sites or facilities. Contractor compliance with the CRD will be required to
the extent set forth in their contract.
c. Exclusions. The provisions of this Manual do not apply to—
(1) Activities conducted under the authority of the Director, Naval Nuclear
Propulsion Program, pursuant to Executive Order 12344, provided in 42
U.S.C. Sec. 2511.
(2) Activities of the Bonneville Power Administration (BPA) in accordance
with Secretarial delegation Order Number 00-033.00A to the BPA
Administrator and Chief Executive Officer, dated 9-27-02.
(3) Administrative, contract, or personnel related issues except to the extent
that they are directly related to technical issues regarding ES&H.
(4) Concerns submitted anonymously or with requests for confidentiality.
4. REQUIREMENTS.
See Attachment 2, “Differing Professional Opinion Process,” and its subparagraphs for
the DPO Process. The DPO Process in Attachment 2 includes both requirements and
guidance. The verbs "must" and "should" are used throughout the attached process to
denote requirements and guidance. “Must” is used for requirements. “Should” is used
for guidance.
5. RESPONSIBILITIES.
a. For nuclear safety issues—Central Technical Authorities (CTAs).
(1) Within 10 working days of acceptance of the DPO, assign a Secretarial
Officer; a Deputy Administrator (for NNSA facilities and activities); the
Chief of Defense Nuclear Safety (CDNS); the Chief of Nuclear Safety
(CNS); a field office manager (FOM), or other appropriate senior
DOE M 442.1-1 3
11-16-06
manager to be responsible for the Final Decision on a DPO. Where
practicable, the individual assigned responsibility for the Final Decision
should be at a level above or independent from the manager who made
the contested decision.
(2) Approve any extensions of the review period for DPOs beyond the
initial 30 calendar day extension.
(3) Make decisions on any appeals to DPO Final Decisions.
(4) Stop or curtail work as necessary to ensure that a facility or activity is in
a safe condition until DPO issues have been resolved.
(5) Provide annual notice to all employees of the availability of the process
and encourage its use where appropriate.
b. For issues other than nuclear safety—Under Secretaries (Deputy Secretary where
there is no Under Secretary).
(1) Within 10 working days of acceptance of the DPO, assign a Secretarial
Officer, Deputy Administrator (for NNSA facilities and activities),
CDNS, CDS, FOM, or other senior manager to be responsible for the
Final Decision on a DPO. Where practicable, the individual assigned
responsibility for the Final Decision should be at a level above or
independent from the manager who made the contested decision.
(2) Approve any extensions of the review period for DPOs beyond the
initial 30 calendar day extension.
(3) Make decisions on any appeals to DPO Final Decisions.
Section 3
(4) Stop or curtail work as necessary to ensure that a facility or activity is in
a safe condition until DPO issues have been resolved.
(5) Provide annual notice to all employees of the availability of the process
and encourage its use where appropriate.
c. Under Secretary of Energy for Nuclear Security/NNSA Administrator (in addition
to the responsibilities listed for the Under Secretaries) assigns a DPO manager
(DPOM) for NNSA.
d. Chief, Health, Safety and Security Officer, Office of Health, Safety and Security
(HS).
(1) Assigns an HS DPOM for offices other than NNSA.
(2) Maintains the DPO Policy and Manual.
4 DOE M 442.1-1
11-16-06
(3) Performs a sample review of DPOs biennially from the list provided by
the DPOMs.
(4) From the review, assesses the success of the DPO Process and the
follow-up actions.
(5) Provides to the Deputy Secretary and each of the Under Secretaries a
report on the findings of the assessment, including any pertinent
recommendations to address findings or deficiencies.
e. Secretarial Officer, Deputy Administrator, CDNS, CNS, FOM or Other Senior
Manager Assigned Responsibility for Final Decision on a DPO (hereinafter
referred to as the assigned Final Decision Manager).
(1) Within 10 working days of being assigned a DPO, appoints an ad hoc
panel of independent experts to review the DPO issue and provide
recommendations and assigns the chair for the panel.
(2) Provides technical assistance and/or support to the ad hoc panels, when
needed.
(3) Reviews reports from ad hoc panels.
(4) Makes and documents the Final Decision within 10 working days of
receiving an ad hoc panel report, including the appropriate actions to
take on assigned DPOs, including the bases for the Final Decision.
(5) Sends copies of the Final Decision to submitter, the submitter’s
management, the appropriate DPOM (or both DPOMs), ad hoc panel
members, and any individuals or organizations tasked with followup
actions or implementation.
(6) Approves extensions to review periods for up to 30 calendar days and
requests additional extensions from the CTA or Under Secretary
(Deputy Secretary where there is no Under Secretary) when needed.
(7) Maintains records on DPOs until decisions have been documented then
sends records to the appropriate DPOM (or both DPOMs) for record
keeping and followup.
(8) Meets with employees who are not satisfied with DPO decisions within
10 working days of the request to meet, and attempts to resolve issues
before the Final Decision is appealed.
(9) Where authorized, stops or curtails work as necessary to ensure that
facilities and/or activities are in a safe condition until DPO issues have
DOE M 442.1-1 5
11-16-06
been resolved; where not authorized, informs the appropriate management
level that work may need to be stopped or curtailed.
(10) Notifies contracting officers of contracts affected by the requirements of
this directive that the CRD will be included in the affected contracts.
f. General Counsel or NNSA General Counsel assigns a member to the ad hoc panel
to review legal issues of the DPO if requested by the assigned Final Decision
Manager. Field counsel may also be used when requested by the Final Decision
Manager and approved by the General Counsel or NNSA General Counsel.
g. Differing Professional Opinion Managers.
(1) Act as ombudsmen for the DPO submitter and ensure that the views of all
persons involved in the process are respected.
(2) Work with the submitter to craft the DPO to fit within the process where
appropriate.
Section 4
(3) Screen DPO submittal within 10 working days of receipt to verify that it
meets the DPO Process criteria and that sufficient information has been
provided to initiate the review.
(a) Accept DPO submittals within the scope of the DPO Process and
with sufficient information to initiate the review.
(b) Return submittals outside the scope of the DPO Process or with
insufficient information to the submitters with an explanation of
why it is being returned.
(c) Refer issues submitted anonymously or with requests for
confidentiality to the Employee Concerns Program.
(d) Refer issues related to wrongdoing to the Office of Inspector
General.
(4) Concurrent with the acceptance of a DPO, assign a DPO control number,
open a file, send an acknowledgement to the submitter, and initiate a
memorandum from the appropriate CTA or Under Secretary (or Deputy
Secretary where there is no Under Secretary) assigning responsibility for
the DPO to the Final Decision Manager.
(5) Where possible, request available supporting documentation from the
DOE or contractor manager who made the decision or established the
position that is being contested by the employee in the DPO and provide it
to the assigned Final Decision Manager, as well as to the ad hoc panel.
6 DOE M 442.1-1
11-16-06
(6) Track followup actions for the DPO to completion and keep interested
DOE parties informed about progress. Report actions to the assigned
Final Decision Manager.
(7) Maintain DPO records for at least 75 years from the date of submittal.
(8) Track progress of DPOs and send reminder memos for actions that are
more than 5 working days behind schedule.
(9) If a DPO involves a situation where work may need to be stopped or
curtailed to ensure that the facility or activity is in a safe condition until
the matter is resolved, inform the manager at the appropriate level
authorized to stop or curtail the work.
(10) Biennially submit to the Office of Independent Oversight in the Office of
Health, Safety and Security, a list of—
(a) DPO actions initiated over the past two years,
(b) A list of DPOs for which follow-up actions were completed over
the past two years,
(c) A list of DPOs with follow-up actions items still outstanding, and
(d) The name of the assigned manager for each of the DPOs listed.
(11) Support Office of Independent Oversight requests for documentation from
the DPO records.
h. Ad Hoc Panel Chairperson.
(1) Schedule and lead ad hoc panel meetings and phone calls.
(2) Assume responsibility for forwarding written documents from the ad hoc
panel as required.
(3) Ensure the positions of all members of the ad hoc panel are represented in
the final report including any dissenting opinions.
(4) Request additional technical assistance through the assigned Final
Decision Manager if necessary.
i. Ad Hoc Panels.
(1) Review DPOs to determine whether enough information has been
supplied to undertake a detailed review of the issue.
DOE M 442.1-1 7
11-16-06
(2) Within 10 working days of assignment, schedule and conduct meetings
with the submitter to discuss the scope of the issues.
(3) Establish a schedule of milestones for the disposition of the DPO.
(4) Conduct detailed reviews of the issues being brought forward and/or
conduct any record reviews or interviews or hold any discussions
deemed necessary to provide a complete, objective, independent, and
impartial review.
(5) Ensure reviews are conducted in an independent fashion to the extent
possible.
Section 5
(6) Provide a written report, including recommendations and any dissenting
opinions, to the assigned Final Decision Manager regarding the
disposition of the issues presented in the DPO with copies to the
appropriate DPOM (or DPOMs) within 30 days of assignment of the
DPO (unless an extension is approved).
j. Employees/Submitters.
(1) First seek resolution of the issue through available processes (e.g.,
discussions with first-line supervisors or through local DPO or review
and comment processes), but when needed use this DPO Process to
ensure any significant technical ES&H issue for a DOE facility or
activity is properly addressed.
(2) Submit DPOs to the applicable DPOM when believed to be necessary to
raise problems on technical issues related to ES&H. Submittals should
include all information indicated in Attachment 2 of this Manual
including attached reference documents where practicable and
appropriate.
(3) Meet with ad hoc panels and DOE managers as requested and provide
information as known to support a thorough review of the concern.
(4) File appeals with the appropriate CTA or Under Secretary (or
Deputy Secretary where there is no Under Secretary) as necessary
with copies to the appropriate DPOM and to the assigned Final
Decision Manager.
k. All DOE Managers.
(1) Encourage employees to engage in open, frank, and unrestricted
professional discussions across organizational boundaries on technical
8 DOE M 442.1-1
11-16-06
issues related to ES&H, unless the disclosure is specifically prohibited
by law.
(2) Ensure that the views of all persons involved in the process are
respected.
(3) Protect employees from retaliation in any form for reporting DPOs.
(4) Report to the appropriate DPOM when requested on the status of
assigned implementation actions resulting from the DPO resolution and
on the closure of these implementation actions.
6. CONTACT. Questions concerning this Manual should be addressed to the Office of
Nuclear and Facility Safety Policy at 301-903-2867.
BY ORDER OF THE SECRETARY OF ENERGY:
CLAY SELL
Deputy Secretary
DOE M 442.1-1 Attachment 1
11-16-06 Page 1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE M 442.1-1, DIFFERING PROFESSIONAL OPINION MANUAL FOR TECHNICAL
ISSUES INVOLVING ENVIRONMENT, SAFETY, OR HEALTH
1. FLOWDOWN REQUIREMENTS. Regardless of the performer of the work, the
contractor is responsible for compliance with the requirements of this Contractor
Requirements Document (CRD). The contractor is responsible for flowing down the
requirements of this CRD to subcontractors at any tier to the extent necessary to ensure
the contractor’s compliance with the requirements and the safe performance of work.
2. SUPPORT THE DPO PROCESS. The Department of Energy (DOE) has established a
Differing Professional Opinion (DPO) process in DOE M 442.1-1 to facilitate dialogue
and resolution on DPOs from employees1 for technical issues involving environment,
safety, and health (ES&H). In support of the effective implementation of the DOE DPO
Process, contractors and subcontractors are required to –
a. Assist DOE as requested in the resolution of DPOs;
b. Ensure that contractor and subcontractor employees are advised at least annually
that they have the right to report concerns on technical issues relating to ES&H
through the DPO Process;
c. Encourage their employees to raise technical issues related to ES&H, use the
DPO Process when appropriate, and provide them reasonable time and resources
to use the DPO Process;
Section 6
d. Protect their employees from retaliation in any form for reporting DPOs; and
e. Report to the DOE when requested on the status of assigned implementation
actions resulting from the DPO resolution and on the closure of these
implementation actions.
3. SUBMITTING DPOS. Contractors and subcontractors who believe that they have
knowledge of a significant technical issue regarding ES&H of a DOE facility or activity
that is not being properly addressed should raise the issue to ensure it is properly
considered in a timely manner. Before using the DPO Process to address an issue they
should first attempt to resolve the issue through other available processes (e.g.,
discussions with the DOE line managers, existing complaint or resolution processes,
review and comment processes, and/or local DPO Processes). If they have attempted to
use available processes to address a technical issue related to ES&H satisfactorily, but
they believe that the current position could have a significant negative impact on
protection of the ES&H of employees or members of the public then they may initiate a
1 For the purposes of the DPO Process “employee” is defined as any person working for DOE, including NNSA or a
DOE contractor or subcontractor on a DOE project.
Attachment 1 DOE M 442.1-1
Page 2 11-16-06
DPO. Contractors and subcontractors who submit DPOs assume the role of the
“submitter” in the DPO Process with the following responsibilities:
a. Submit DPOs to the applicable DOE DPO Manager (DPOM). Submittals should
include all information indicated in the DPO Process defined in Section 2 to
Attachment 2 to DOE M 442.1-1 including attached reference documents where
practicable and appropriate.
b. Meet with ad hoc panels and DOE managers as requested and provide
information as known to support a thorough review of the concern.
c. File appeals with the appropriate DOE Under Secretary (or Deputy Secretary
where there is no Under Secretary) as necessary no later than 21 working days
after the Final Decision is issued, with copies to the appropriate DPOM and to the
DOE assigned Final Decision Manager.
DOE M 442.1-1 Attachment 2
11-16-06 Page 1
DIFFERING PROFESSIONAL OPINION PROCESS
Employees who believe that they have knowledge of a significant technical issue regarding
environment, safety, and health (ES&H) of a Department of Energy (DOE) facility or activity
that is not being properly addressed should raise the issue to ensure it is properly considered in
a timely manner.
1. FIRST, USE AVAILABLE PROCESSES.
a. Before initiating the Differing Professional Opinion (DPO) process, the
employee should first attempt to resolve the issue through available processes
(e.g., discussions with the first-line supervisors or other managers, review and
comment processes, and/or local DPO Processes). Where applicable, DOE field
and contractors processes should be used to process issues before invoking the
process in this manual. In the free and open exchange of technical issues,
differences of opinion are common and generally not part of the DPO Process.
In addition, there may be multiple solutions to a technical issue, which would
serve to adequately protect ES&H.
b. If the employee has attempted to use available processes to satisfactorily
address a technical issue related to ES&H and the employee believes that the
current position could have a significant negative impact on protection of the
ES&H of employees or members of the public then the employee should
initiate a DPO.
Section 7
2. PREPARE AND SUBMIT A DPO.
The employee (hereinafter referred to as the submitter) must prepare a written document
with the following information: 1
a. What is the issue? A summary of the prevailing staff view, the existing
management decision or stated position, or the proposed or established
Department practice involving the technical issues.
b. What is your recommended action? A description of the submitter’s views and
how they differ from any issues discussed in item a.
c. What could happen if there is no change in position? If possible, the submitter
should include an assessment of the consequences if the submitter’s position is
not adopted by the Department. This section should include a sound technical
basis for the concern. The consequences discussed should be in terms of effects
1 See Appendix A for an example of an acceptable format for DPO submissions and Appendix B for the simplified
steps of the DPO Process. These items correspond to the questions in the Sample DPO Submittal Form in
Appendix A.
Attachment 2 DOE M 442.1-1
Page 2 11-16-06
to worker safety or health, or protection of the public or environment from DOE
facilities or activities.
d. Which recognized technical experts would you recommend to be included on
the ad hoc panel to review the DPO? The submitter may recommend up to
three technical experts in the area of the DPO as potential ad hoc panel
members or a statement that names of recommended technical experts will not
be provided.2
e. What should panel members read to help them resolve the issue? The submitter
should include a list of the relevant documents that support the DPO or should be
read for a thorough independent review (e.g., sections of safety bases documents,
assessments, reports). The submitter should either provide a copy of the
documents or provide enough information to enable a reader to obtain them
easily.3
f. What else have you tried to resolve this issue and what were the results? The
submitter should include a discussion of the available processes (review and
comments, discussions with technical personnel and management, local DPO
Processes, etc.) used to resolve the issue before initiating this DPO and what the
outcome was if known.
g. In order to determine which DPOM should handle the DPO, indicate whether the
DPO involves:
(1) Only NNSA facilities and/or activities,
(2) Only non-NNSA facilities and/or activities, or
(3) Both NNSA and non-NNSA facilities and/or activities.
3. SUBMIT THE DPO.
a. DPOs for National Nuclear Security Administration (NNSA) facilities and
activities should be submitted to the NNSA DPOM.
b. DPOs for facilities and activities other than NNSA should be submitted to the
Office of Health, Safety and Security DPOM.
2 The submitter may consult with the exclusive bargaining unit representative or the DPOM, if appropriate, to
nominate knowledgeable individuals who may be technically competent and willing to serve as panel members.
3 Copyrighted documents that are generally available to the public such as consensus codes and standards should not
be attached, nor should published DOE directives or technical standards which are available through the DOE web
pages. For such documents, the submitter must include complete references of specific sections with a brief
statement regarding the relevance of the document to the issue being raised. Copies of other documents may be
provided in electronic or paper format.
DOE M 442.1-1 Attachment 2
11-16-06 Page 3
Section 8
c. DPOs that involve both NNSA and non-NNSA activities should be submitted to
both DPOMs and the DPOMs will work with management to determine whether
one or two reviews should be performed.
d. DPOs may also enter the DPO Process through issues submitted to the Employee
Concerns Process and forwarded to the appropriate DPOM. In such cases, the
DPOM must contact the submitter for any additional information required to
accept and review the issue consistent with this process.
4. SCREEN AND ACCEPT THE DPO
a. The DPOM must screen the submission to ensure that it meets the criteria for
the DPO Process.4 Issues that are not generally within the scope of the DPO
Process and that will not be reviewed according to this process include the
following:
(1) issues that are administrative in nature (such as procedures for review and
comment or Price-Anderson enforcement procedures),
(2) personnel issues (such as performance elements, evaluations and ratings or
work assignments by management),
(3) issues that relate to contracts not relating to technical ES&H issues (such
as fees or contract negotiations),
(4) issues related to collective bargaining,
(5) issues that should be addressed through the grievance process or personnel
appeal procedures,
(6) issues that relate to wrongdoing (the DPOM must refer these to the Office
of Inspector General),
(7) issues submitted anonymously or for which confidentiality is requested,
and
(8) issues that have been considered and already addressed under this process
unless significant new information is available.
4 An example of an issue that would not be included in this process would be an employee who could not perform a
task because of a back problem. Although this issue is related to the health of employees, it is not related to a
technical issue and should be handled as a personnel issue. An example of an issue that could be addressed
through the DPO Process would be an operation that could result in an interaction of chemicals that would result in
a chlorine release and exposure to workers that has not been properly addressed in safety analysis and/or design.
Attachment 2 DOE M 442.1-1
Page 4 11-16-06
b. If the DPOM determines that the issue is outside the scope of the DPO Process,
the DPOM must inform the submitter and, if appropriate, suggest the appropriate
process for submittal.
c. If part of the DPO is outside the scope of the DPO Process, the DPOM must
discuss the issue with the submitter to determine whether certain aspects of the
DPO should be addressed by the DPO Process. If so, the DPOMs must work with
the submitter to craft a submission that addresses only the limited aspects
appropriate for the DPO Process.5
d. If the DPO is appropriately covered by the DPO Process, the DPOM will verify
that sufficient information has been provided to initiate the review. If not, the
DPOM will return the submittal to the submitter with documentation identifying
the additional information needed. Examples of insufficient information include
(1) missing name, email, or phone number and (2) an unclear statement of the
issue such that the Under Secretary would not be able to determine to which
office the DPO should be assigned.
e. If the issue is within the scope of the DPO Process and sufficient information has
been provided to initiate the review, it will be accepted. The intent of this review
is to identify information that is needed to be able to understand the issue and
initiate the review. The DPOM should not use the acceptance process to slow
down or stop the review. The review should proceed as soon as enough
information has been provided to understand the issue.
Section 9
f. In cases where imminent danger is involved the acceptance process should
proceed in parallel with forwarding the available information to management to
initiate a review and take any necessary actions to protect individuals and
property. The DPOM may need to contact management for immediate action
even before the DPO is formally submitted.
g. The acceptance review must be completed by the DPOM within 10 working days
of receipt of the DPO.
h. Concurrent with the acceptance of a DPO, the DPOM must—
(1) assign a DPO control number;
(2) open a file;
5 An example of such an issue might be a claim of retribution regarding an employee who complained to
management about substandard components. The review of the substandard components could progress through
the DPO Process, while the retribution issue should be addressed through alternate processes.
DOE M 442.1-1 Attachment 2
11-16-06 Page 5
(3) send an acknowledgement of the acceptance of the DPO for action to the
submitter;
(4) initiate a memorandum for the appropriate CTA or Under Secretary’s
signature (Deputy Secretary where there is no Under Secretary) to assign
the DPO to the Final Decision Manager, as appropriate; and
(5) request supporting documentation from the DOE or contractor manager
who made the decision or established the position that is being contested
by the submitter in the DPO and provide that information to the assigned
Final Decision Manager, as well as to the ad hoc panel.
i. The CTA or Under Secretary (or Deputy Secretary where there is no Under
Secretary) must assign the DPO to a Final Decision Manager within 10 working
days of acceptance of the DPO.
j. If the DPO covers issues that are already undergoing staff review or inspection
activity, the DPOM must refer the DPO back to the submitter and communicate
the submitter’s issues to the senior manager overseeing the staff’s review or the
inspection activity to ensure that the submitter’s issues are taken into
consideration.
5. APPOINT AN AD HOC PANEL.
a. Within 10 working days of receipt of the file from the DPOM, the assigned Final
Decision Manager must appoint an ad hoc panel of experts to conduct a thorough
review of the DPO.
b. The assigned Final Decision Manager must send a copy of the memorandum
assigning the panel members to the appropriate DPOM (or both DPOMs) and the
submitter of the DPO.
c. No one in a position of authority over the submitter should be appointed to the ad
hoc review panel. In addition, to the extent possible, the ad hoc panel should not
involve individuals who have directly participated in the formulation of the DOE
position that is at issue or have a direct and personal or financial interest in the
outcome. If it is desirable for a person from outside DOE to serve as a member of
the DPO ad hoc review panel or as a consultant to the panel, the requirements of
the Federal Advisory Committee Act must be met.
d. The ad hoc panel may consist of as few as one person (provided that one person
meets all of the criteria for the panel) or as many persons as determined to be
appropriate by the manager convening the panel. The panel must include the
following individuals:
Attachment 2 DOE M 442.1-1
Page 6 11-16-06
a management-appointed chairperson,
• a person who is technically knowledgeable in the subject area being
reviewed (this may also be the chairperson), and
• a panel member chosen by the General Counsel if the subject involves a
legal issue.6
Section 10
e. The assigned manager must also consider including a panel member from the
recommended list of technical experts provided by the submitter.
6. AD HOC PANEL REVIEW. The ad hoc panel must do the following:
a. Review the DPO to determine whether enough information has been supplied to
undertake a detailed review of the issue and request any additional information
needed from the submitter or from DOE or contractor management.
b. Schedule and conduct a meeting with the submitter to discuss the scope of the
issue within 10 calendar days from the date of the memorandum that establishes
the ad hoc panel. The scope should remain fully focused on and should not
exceed the issues as defined in the original written DPO.
c. Establish a schedule of milestones for the disposition of the DPO.
d. Request technical assistance through the ad hoc panel chair and the assigned Final
Decision Manager if necessary.
e. Conduct a detailed review of the issues being brought forward and/or conduct any
record reviews or interviews or hold any discussions the panel deems necessary to
provide a complete, objective, independent, and impartial review.
f. Conduct an independent review to the maximum extent possible. The review
should include periodic discussions with the submitter to provide the submitter
the opportunity to further clarify his or her views and to facilitate the exchange of
information.
g. Provide a written report, including recommendations and any dissenting opinions,
to the assigned Final Decision Manager regarding the disposition of the issues
presented in the DPO with a copy to the appropriate DPOM (or both DPOMs).
6If the panel includes a member assigned by the General Counsel, that member’s involvement in the panel will be
limited to the legal issues in the differing professional opinion (DPO). Because the DPO Process is directed to
technical, not legal, issues, the participation of a member of the General Counsel’s office is not normally expected.
Local counsel may also be used when requested by the assigned Final Decision Manager and approved by the
General Counsel or NNSA General Counsel.
DOE M 442.1-1 Attachment 2
11-16-06 Page 7
The report should be provided within 30 calendar days of the appointment of the
ad hoc panel unless an extension has been approved.
h. Some issues may be time sensitive. In those cases, the assigned Final Decision
Manager may direct the panel to provide a report on a shorter schedule when the
ad hoc panel is assigned.
7. EXTENSIONS TO SCHEDULES FOR THE AD HOC PANEL REVIEW. The assigned
Final Decision Manager may extend the review up to an additional 30 calendar days.
Extensions beyond 30 calendar days require the approval of the CTA or Under Secretary
(Deputy Secretary where there is no Under Secretary).
a. The approval must be documented and a copy of the approval memorandum
extending the schedule must be sent to the appropriate DPOM (or both DPOMs)
who must file it with the DPO records.
b. The DPOM also must send a copy of the approval memorandum extending the
schedule to the submitter of the DPO.
8. FINAL DECISION.
a. The assigned Final Decision Manager must provide the Final Decision (including
a documented basis for the decision) to the submitter of the DPO within
10 working days of receipt of the panel’s final recommendations. Copies of the
Final Decision must be sent to:
(1) the submitter’s management (if different from the assigned Final Decision
Manager),
(2) the DPOM,
Section 11
(3) any individuals or organizations tasked with followup actions or
implementation, and
(4) each of the panel members.
b. The decision memorandum may include appropriate recognition of the
submitter’s efforts if deemed appropriate by the assigned Final Decision Manager.
c. If the assigned Final Decision Manager decides to take an action other than
recommended by the ad hoc panel, the appropriate CTA or the Under Secretary
(or the Deputy Secretary if there is no Under Secretary) must concur on the
decision.
d. For any action required by the decision, the action must receive the concurrence
of a line manager authorized to take the action or direct the action to be taken.
Attachment 2 DOE M 442.1-1
Page 8 11-16-06
e. If DOE management determines that the recommended actions will not be
implemented or that alternate actions will be implemented, the DPOM will be
informed and those decisions will be tracked and recorded through the DPO
Process.
9. SUBMITTER’S REVIEW OF THE FINAL DECISION.
a. A submitter who is not satisfied with the Final Decision and continues to believe
that a significant technical issue related to ES&H is not being properly addressed,
must contact the DPOM within 5 working days of receiving the Final Decision to
request a meeting and discussion with the assigned Final Decision Manager or
his/her designee. That meeting must be held within 10 working days of the
request.
b. As a result of the meeting, the assigned Final Decision Manager may decide to
change his/her decision. If so, that revised decision must be issued, filed, and
distributed consistent with the Final Decision, including copies to any individuals
or organizations tasked with new followup actions or implementation as a result
of the change. In addition, any followup actions that are being retracted must be
documented and the documentation sent to the individuals or organizations tasked
with the original followup actions or implementation. Consideration must be
made for any followup actions that may have been partially or fully completed
during the interim.
c. Alternatively, as a result of the meeting, the individual responsible for submitting
the DPO may decide that he/she is satisfied with the results of the review and no
further actions are needed. In that case, the submitter should send a memorandum
to the appropriate DPOM (or DPOMs) with a copy to the assigned Final Decision
Manager closing the issue.
d. If following the meeting the submitter continues to believe that the Final Decision
does not adequately resolve the issue the submitter should initiate an appeal to the
DPO decision.
10. FILING A DPO APPEAL.
a. The submitter may file an appeal to a Final Decision on a DPO no later than
21 working days after the Final Decision is issued.
(1) For nuclear safety issues, the appeal must be addressed and sent to the
appropriate CTA with a copy to the appropriate DPOM (or DPOMs) and
the assigned Final Decision Manager.
(2) For other than nuclear safety issues, the appeal must be addressed and sent
to the appropriate Under Secretary (Deputy Secretary where there is no
Under Secretary) with a copy to the appropriate DPOM (or DPOMs) and
the assigned Final Decision Manager.
DOE M 442.1-1 Attachment 2
11-16-06 Page 9
(3) The DPO appeal must include an explanation of why the submitter still
believes that the decision is inadequate or insufficient to ensure protection
of ES&H.
(4) The DPO appeal must also include the DPO tracking number.
Section 12
b. Upon receiving an appeal, the DPOM must forward a copy of the file on the DPO
to the appropriate CTA or Under Secretary (Deputy Secretary where there is no
Under Secretary) including the supporting information and a copy of the Final
Decision.
11. APPEAL DECISION.
a. An Appeal Decision must be issued by the CTA or Under Secretary (Deputy
Secretary where there is no Under Secretary), as appropriate, no later than
60 calendar days after receipt of the appeal.
b. The official making the Appeal Decision may reconvene the panel, choose and
use a new panel, or make the decision without benefit of a panel.
c. Copies of the Appeal Decision, along with any reports, must be provided to the
assigned Final Decision Manager for the DPO, the appropriate DPOM (or
DPOMs), and individuals or organizations tasked with followup or
implementation actions.
d. Upon issuance of the decision to the submitter, the DPO Process will be
concluded and the matter will be considered closed.
12. RECORDKEEPING REQUIREMENTS. The assigned Final Decision Manager must
retain the records for a DPO until the DPO Final Decision has been issued at which time
the assigned Final Decision Manager must forward the complete case file to the
appropriate DPOM (or both DPOMs) for record keeping. The DPOM must retain the file
for a minimum of 75 years.
13. WITHDRAWING A DPO. The submitter may withdraw the DPO (or appeal) at any time
before the issuance of a Final Decision (or Appeal Decision). To initiate a withdrawal,
the submitter must file a written request to the appropriate DPOM (or DPOMs), who will
forward copies to the assigned Final Decision Manager (and CTA or Under
Secretary/Deputy Secretary for an appeal). The DPOM must send an acknowledgment
letter to the submitter indicating the date on which the withdrawal took effect.
Withdrawal does not preclude the assigned Final Decision Manager (or the Under
Secretary or Deputy Secretary for an appeal) or other assigned Departmental
representatives, from pursuing the issue, but the continued pursuit of the issue will no
longer be subject to DPO Process rules and/or time frame requirements. If DOE decides
not to pursue a withdrawn DPO, the DPOM will enter a memorandum in the file
documenting the basis for the decision not to pursue the issue.
Attachment 2 DOE M 442.1-1
Page 10 11-16-06
14. TRACKING AND FOLLOWUP ACTIONS.
a. The DPOM must assign a control number to track each DPO. That number must
be included on all correspondence on that DPO, including the confirmation the
DPOM sends to the submitter of the DPO to inform that person that the DPO has
been received and is being processed. This control number will be used to track
the DPO throughout the process, as well as any appeal that may arise. All parties
must provide a copy of any official correspondence on that DPO (including e-
mail where appropriate) to the appropriate DPOM (or DPOMs).
b. The DPOM must track each DPO to conclusion and send reminder e-mails to
individuals who are 5 working days behind schedule.
c. The DPOM must record any followup actions identified by the decisions resulting
from the DPO Process.
d. The assigned Final Decision Manager is responsible for ensuring that these
actions are assigned to the proper authority and entered on local tracking systems
with scheduled completion dates.
Section 13
e. In establishing completion dates, consideration must be given to the safety
significance of the issue, the age of the issue, and the priority of other work in the
office. If the schedule for the followup items is not met, the reason for the delay
and a revised schedule for completion of the actions must be communicated to the
submitter and to the applicable CTA or Under Secretary (or in cases where there
is no assigned Under Secretary, to the Deputy Secretary).
15. PROTECTION FROM RETALIATION FOR FILING A DPO.
a. As stated in DOE P 442.1, it is DOE policy to protect employees from retaliation
in any form for filing DPOs.
b. Additional protection is provided by the following:
(1) 5 U.S.C. § 2302 contains specific language prohibiting individuals from
taking adverse personnel action with respect to any Federal employee or
applicant for employment because of disclosure of information which the
employee reasonably believes evidences a violation of law, rule or
regulation; gross mismanagement; gross waste of funds; an abuse of
authority; or a substantial and specific change to public health and safety
if the disclosure is not specifically prohibited by law or by Executive
Order in the interest of national defense or the conduct of foreign affairs.
DOE M 442.1-1 Attachment 2
11-16-06 Page 11 (and Page 12)
(2) Sec. 211 of the Energy Reorganization Act, as amended, codified at 42
U.S.C. Sec. 5851, provides DOE and DOE contractor or employees
specific whistleblower protection.
(3) 10 CFR Part 708 provides procedures for processing complaints by
employees of DOE contractors alleging retaliation by their employers for
disclosure of information concerning danger to public or worker health or
safety (among other things).
c. Reprisals against contractor employees may also lead to the imposition of
penalties under 10 CFR Part 820 or 10 CFR 851.
DOE M 442.1-1 Attachment 2, Appendix A
11-16-06 Page A-1
SAMPLE DIFFERING PROFESSIONAL OPINION SUBMITTAL FORM
Differing Professional Opinion (DPO) Submittal
Respond to the questions below or attach responses. Attach copies of references. Submit
the completed form to the DPO manager (DPOM). See DOE M 442.1-1 for instructions.
TO BE ENTERED BY DPOM
DPO Title:
DPO tracking number:
Do you believe this issue involves a risk of imminent danger that would warrant an
immediate stop work or a shutdown? YES or NO
1. What is the issue?
2. What is your recommended action?
3. What could happen if there is no change in position? (Note: Include a sound technical
basis for the issue.)
4. Which recognized technical experts would you recommend to be included on the ad hoc
panel to review the DPO?
5. What should the ad hoc panel members read to help them resolve the issue?
Attachment 2, Appendix A DOE M 442.1-1
Page A-2 11-16-06
SAMPLE DIFFERING PROFESSIONAL OPINION SUBMITTAL FORM (continued)
6. What else have you tried to resolve the issue (review and comments, discussions with
technical personnel and management, local DPO Processes, etc.) and what were the
results?
7. This DPO involves (check the applicable box)—
NNSA facilities and/or activities.
Non-NNSA facilities and/or activities.
Both NNSA and non-NNSA facilities and/or activities.
Name:
Date: Organization:
Position or Relationship to DOE:
DOE employee DOE contractor DOE subcontractor
Phone number:
E-mail address:
Complete mailing address:
Best way to contact you for additional information:
Signature:
Section 14
DOE M 442.1-1 Attachment 2, Appendix B
11-16-06 Page B-1 (and Page B-2)
SIMPLIFIED STEPS OF A DIFFERING PROFESSIONAL OPINION (DPO) PROCESS
RESPONSIBLE PARTY ACTION TIME FRAME
DPO Submitter Submit proposed DPO to DPO
Manager (DPOM).
As needed
DPOM Perform acceptance review. Within 10 working days
CTA, Under Secretary, or
Deputy Secretary, as
appropriate
Assign DPO to appropriate
Final Decision Manager.
Within 10 working days
Assigned Final Decision
Manager
Appoint Ad Hoc Panel and
designate chair.
Within 10 working days
Ad Hoc Panel Review DPO and provide
recommendations in a report
to the assigned Final Decision
Manager.
Within 30 calendar days
(unless extension is approved)
Assigned Final Decision
Manager
Review Ad Hoc Panel Report
and send Final Decision to
DPO submitter with copy to
DPOM.
Within 10 working days
DOE M 442.1-1 Attachment 2, Appendix C
11-16-06 Page C-1 (and Page C-2)
SIMPLIFIED STEPS OF A DPO APPEAL
RESPONSIBLE PARTY ACTION TIME FRAME
DPO Submitter Contact DPOM to request a
meeting and discussion with
the assigned Final Decision
Manager.
Within 5 days after receiving
the DPO Final Decision.
Assigned Final Decision
Manager
Meet with DPO submitter and
discuss the Final Decision.
Within 10 days of the DPOM
receiving the request for a
meeting.
DPO Submitter Initiate an appeal by sending a
letter to the CTA (for nuclear
safety issues) or the Under
Secretary (for other than
nuclear safety issues) or to the
Deputy Secretary where there
is no Under Secretary.
Within 21 working days after
the Final Decision.
CTA or Under Secretary
(Deputy Secretary where there
is no Under Secretary)
Review DPO and supporting
information and issue Appeal
Decision.
Within 60 calendar days after
receipt of the appeal.
DIFFERING PROFESSIONAL OPINIONS MANUAL FOR TECHNICAL ISSUES INVOLVING ENVIRONMENT, SAFETY, AND HEALTH
1. PURPOSE
2. CANCELLATIONS
3. APPLICABILITY
a. DOE Elements
b. Contractors
c. Exclusions
4. REQUIREMENTS
5. RESPONSIBILITIES
a. For nuclear safety issues—Central Technical Authorities (CTAs)
b. For issues other than nuclear safety—Under Secretaries (Deputy Secretary where there is no Under Secretary)
c. Under Secretary of Energy for Nuclear Security/NNSA Administrator (in addition to the responsibilities listed for the Under Secretaries)
d. Chief, Health, Safety and Security Officer, Office of Health, Safety and Security (HS)
e. Secretarial Officer, Deputy Administrator, CDNS, CNS, FOM or Other Senior Manager Assigned Responsibility for Final Decision on a DPO (hereinafter referred to as the assigned Final Decision Manager)
f. General Counsel or NNSA General Counsel
g. Differing Professional Opinion Managers
h. Ad Hoc Panel Chairperson
i. Ad Hoc Panels
j. Employees/Submitters
k. All DOE Managers
Section 15
6. CONTACT
ATTACHMENT 1. CONTRACTOR REQUIREMENTS DOCUMENT
1. FLOWDOWN REQUIREMENTS. Regardless of the performer of the work, the contractor is responsible for compliance with the requirements of this Contractor Requirements Document (CRD). The contractor is responsible for flowing down the requirements of this CRD to subcontractors at any tier to the extent necessary to ensure the contractor’s compliance with the requirements and the safe performance of work.
2. SUPPORT THE DPO PROCESS. The Department of Energy (DOE) has established a Differing Professional Opinion (DPO) process in DOE M 442.1-1 to facilitate dialogue and resolution on DPOs from employees for technical issues involving environment, safety, and health (ES&H). In support of the effective implementation of the DOE DPO Process, contractors and subcontractors are required to –
3. SUBMITTING DPOS. Contractors and subcontractors who believe that they have knowledge of a significant technical issue regarding ES&H of a DOE facility or activity that is not being properly addressed should raise the issue to ensure it is properly considered in a timely manner. Before using the DPO Process to address an issue they should first attempt to resolve the issue through other available processes (e.g., discussions with the DOE line managers, existing complaint or resolution processes, review and comment processes, and/or local DPO Processes). If they have attempted to use available processes to address a technical issue related to ES&H satisfactorily, but they believe that the current position could have a significant negative impact on protection of the ES&H of employees or members of the public then they may initiate a DPO. Contractors and subcontractors who submit DPOs assume the role of the “submitter” in the DPO Process with the following responsibilities:
ATTACHMENT 2. DIFFERING PROFESSIONAL OPINION PROCESS
1. FIRST, USE AVAILABLE PROCESSES.
2. PREPARE AND SUBMIT A DPO.
3. SUBMIT THE DPO.
4. SCREEN AND ACCEPT THE DPO
5. APPOINT AN AD HOC PANEL.
6. AD HOC PANEL REVIEW. The ad hoc panel must do the following:
7. EXTENSIONS TO SCHEDULES FOR THE AD HOC PANEL REVIEW. The assigned Final Decision Manager may extend the review up to an additional 30 calendar days. Extensions beyond 30 calendar days require the approval of the CTA or Under Secretary (Deputy Secretary where there is no Under Secretary).
8. FINAL DECISION.
9. SUBMITTER’S REVIEW OF THE FINAL DECISION.
10. FILING A DPO APPEAL.
11. APPEAL DECISION.
12. RECORDKEEPING REQUIREMENTS. The assigned Final Decision Manager must retain the records for a DPO until the DPO Final Decision has been issued at which time the assigned Final Decision Manager must forward the complete case file to the appropriate DPOM (or both DPOMs) for record keeping. The DPOM must retain the file for a minimum of 75 years.
13. WITHDRAWING A DPO. The submitter may withdraw the DPO (or appeal) at any time before the issuance of a Final Decision (or Appeal Decision). To initiate a withdrawal, the submitter must file a written request to the appropriate DPOM (or DPOMs), who will forward copies to the assigned Final Decision Manager (and CTA or Under Secretary/Deputy Secretary for an appeal). The DPOM must send an acknowledgment letter to the submitter indicating the date on which the withdrawal took effect. Withdrawal does not preclude the assigned Final Decision Manager (or the Under Secretary or Deputy Secretary for an appeal) or other assigned Departmental representatives, from pursuing the issue, but the continued pursuit of the issue will no longer be subject to DPO Process rules and/or time frame requirements. If DOE decides not to pursue a withdrawn DPO, the DPOM will enter a memorandum in the file documenting the basis for the decision not to pursue the issue.
14. TRACKING AND FOLLOWUP ACTIONS.
15. PROTECTION FROM RETALIATION FOR FILING A DPO.
APPENDIX A. SAMPLE DIFFERING PROFESSIONAL OPINION SUBMITTAL FORM
APPENDIX B. SIMPLIFIED STEPS OF A DIFFERING PROFESSIONAL OPINION (DPO) PROCESS
APPENDIX C. SIMPLIFIED STEPS OF A DPO APPEAL