DOE G 450.3-2, Attributes of Effective Implementation
Functional areas: Integrated Safety Management, Safety
Previously coordinated in the Department Standards Committee. Canceled by DOE N 251.101
Superseded By:
DOE N 251.101, Cancellation of Directives on May 26, 2011
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE N 251.101Cancellation of Directives (May 26, 2011)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DOE G 450.3-2
February 1997
ATTRIBUTES OF
EFFECTIVE
IMPLEMENTATION
U.S. DEPARTMENT OF ENERGY
Office of Environment, Safety and Health
Distribution: Initiated By:
All Departmental Elements Office of Environment,
Safety and Health
DOE G 450.3-2 i
February 1997
ATTRIBUTES OF EFFECTIVE IMPLEMENTATION
In May 1996, the Department Standards Committee (DSC) chartered a Standards Process Action
Team (SPAT 12) to develop a tool that would help guide the implementation of Work Smart
Standards (WSS) derived and approved using the DOE Manual 450.3, Closure Process for
Necessary & Sufficient Sets of Standards (WSS Closure Process). Consistent with the Criteria
for the Department’s Standards Program and the DOE Guide for Integrated Safety Management
Systems, the team defined implementation as the collection of activities comprising work
planning, work performance, performance assessment, and work feedback. As a subsequent step
toward developing a tool for improvement, the team defined “effective implementation” as
“planning and performing the work in accordance with the agreed-upon standards, confirming
that this has been done, and maintaining and improving work planning and performance based on
feedback.”
Once the scope had been precisely defined, the team then visited a number of DOE sites to
observe diverse implementation practices. From these visits the team validated that the four
components of implementation were in evidence at each site, but that the mechanics and
mechanisms employed were site- and program specific—inextricably bound to the particular
activities, work environments, and corporate operating policies. Creating a tool designed for
improving implementation, therefore, demanded respect and appreciation: for the diversity of
work and missions, and for the capabilities, expertise, and knowledge of those immediately
involved in implementing standards.
Using the field observations as a foundation, the team identified common themes at the sites, and
from these derived a set of 21 attributes correlated with effective implementation. This attribute
set is intended for use by all organizations involved in implementing standards. The set is
equally applicable for implementing standards derived using the WSS Closure Process or any
other process, and is intended to accomplish three key goals:
• Promote more effective and informed decision making about how effective implementation
is accomplished; there are no “how to” guides or “checklists” provided, but rather
information that will allow more effective judgments to be reached about where and to what
degree opportunities exist for doing work more safely and efficiently.
• Encourage each of the communities involved in implementing standards to make more
valuable contributions toward ensuring work is done safely and efficiently; workers, ES&H
professionals, management, and assessors—both contractor and DOE—have opportunity
and shared responsibility in enhancing the effectiveness of implementation.
• Promote and foster a logic of implementation predicated on the Work Smart Principles
embedded in the Criteria for the Department’s Standards Program and reflected in the
WSS Closure Process:
ii DOE G 450.3-2
February 1997
– a focus on the work, as opposed to beginning with a focus on requirements or hazards;
– teamwork, highlighted by cooperative engagement of affected organizations and
individuals;
– fostering of and reliance on sound judgment, experience, and operating knowledge;
Section 2
– an emphasis on ownership and accountability;
– decision-making at the appropriate operating levels;
– enhanced communication throughout the process and work cycles; and
– a rational balance between safety and efficiency.
The set of attributes is a starting point. Derived exclusively from limited observation of DOE
programs, the list is not intended to be definitive. Rather, the team expects that experience with
the set will encourage expanding and refining the attribute list, and will serve to increase its
usefulness in helping meet the DOE’s objectives of establishing itself as a world class, standards-
based operation.
DOE G 450.3-2 iii
February 1997
CONTENTS
EXECUTIVE SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i
I. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
II. IMPLEMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1. Implementation: Basic Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2. Implementation: Expanded Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
III. ATTRIBUTES OF EFFECTIVE IMPLEMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1. Selection of attributes as a tool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2. Developing the attribute set . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
3. Attributes and Integrated Safety Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
IV. ATTRIBUTE DESCRIPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Attribute 1: Planning, performance, and assessment are focused on the work . . . . . . . 15
Attribute 2: ES&H standards are integrated with other expectations for the work . . . . 17
Attribute 3: Line ownership of ES&H is evident . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Attribute 4: Worker ownership, confidence, and job satisfaction are evident . . . . . . . . 19
Attribute 5: DOE and contractor line management provide tangible evidence of
commitment to implementation of agreed-upon standards . . . . . . . . . . . . . 20
Attribute 6: Workers know and understand operational and strategic objectives . . . . . 21
Attribute 7: Managers and workers promote compatibility between individual
motives and institutional norms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Attribute 8: Workers have timely participation in work planning . . . . . . . . . . . . . . . . . 23
Attribute 9: Work planning is carried out in an integrated project approach . . . . . . . . . 24
Attribute 10: Work planning and work controls are based on collective knowledge . . . . 25
Attribute 11: Information necessary for work planning and performance is reliable,
readily available, and communicated with appropriate tools and
methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Attribute 12: Training and qualification of workers support reliance on judgment
and expertise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Section 3
Attribute 13: Workers know, understand, and believe in the agreed-upon standards . . . 28
Attribute 14: Managers do not allow worker ownership without informed acceptance . . 29
Attribute 15: Work is conducted in accordance with agreed-upon work controls . . . . . . 30
Attribute 16: Performance of work is based on worker knowledge and ownership . . . . . 31
Attribute 17: A formal program of self-assessment supports organizational learning . . . 31
Attribute 18: Assessment criteria are developed during work planning . . . . . . . . . . . . . . 33
Attribute 19: Assessment criteria are based on agreed-upon expectations . . . . . . . . . . . . 33
Attribute 20: Cost effectiveness is one measure of performance . . . . . . . . . . . . . . . . . . . 34
Attribute 21: Planning and performance of work are responsive to feedback . . . . . . . . . 35
iv DOE G 450.3-2
February 1997
CONTENTS (continued)
FIGURES
1. Expectations Associated with Effective Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2. Implementation and Integrated Safety Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3. Parameters of Implementation Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
4. Examples of DOE Planning Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
5. Areas of Specific Focus During Site Visits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
6. Sites Visited . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
7. Process for Deriving Attributes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
8. Overview of Team Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
9. Relationship Between ISMS Concepts and Work Smart Principles . . . . . . . . . . . . . . . . . . 13
DOE G 450.3-2 1
February 1997
ATTRIBUTES OF EFFECTIVE IMPLEMENTATION
I. INTRODUCTION
When the Department of Energy (DOE) issued the Criteria for the Department’s Standards
Program (DOE/EH/-0416) in August 1994, it established a new direction and vision for the
complex: Standards-Based Management. The Criteria depicted the image of a fully mature
safety-based management system: standards selected based on their appropriateness in safely and
efficiently accomplishing the work; the selected standards effectively incorporated into work
controls; work conducted in concert with those controls; local and corporate infrastructures
reengineered to better support the DOE’s mission and work; and feedback and assessment
systems in place, aligned with and directly contributing to strengthening work performance and
assuring continued adherence to the agreed-upon standards and controls.
Beyond the mechanical changes needed to achieve the vision, the Criteria described a new
Department-wide approach to Department and contractor management that embraced the
following principles:
• a focus on the work, as opposed to beginning with a focus on requirements or hazards;
• teamwork, highlighted by cooperative engagement of affected organizations and
individuals;
• fostering of and reliance on sound judgment, experience, and operating knowledge;
• an emphasis on ownership and accountability;
• decision making at the appropriate operating levels;
Section 4
• enhanced communication throughout the process and work cycles;
• a rational balance between safety and efficiency;
• an appreciation of the distinctive differences among the numerous work activities and work
environments evidenced within the DOE Complex.
The first tangible demonstration of how these “Work Smart” principles contribute to achieving
the goals established in the Criteria was provided in the Department Standards Committee’s
(DSC’s) development of a Closure Process for Necessary and Sufficient (N&S) Sets of Standards
(WSS Closure Process) for the identification and approval of Work Smart Standards. Using the
expectations set forth in the Criteria, coupled with the Work Smart principles enumerated above,
the DSC engineered a process that calls for establishing knowledgeable teams to conduct a
rigorous examination of the work and to determine the associated hazards. Definition of the
work and identification of associated hazards is followed by a disciplined, cooperative
determination—using expertise, experience, and judgment—of the standards necessary to allow
the work to be performed both safely and efficiently.
2 DOE G 450.3-2
February 1997
Successes achieved in pilot applications validated both the WSS Closure Process and the
inherent value and benefits resulting from the underlying Work Smart principles. Based on these
successes and the clear benefits to the DOE and its work force, the Secretary of Energy issued a
policy statement (Policy 450.3) in March 1996 authorizing use of the WSS Closure Process for
selecting and approving standards. With issuance of the policy, the first challenge of achieving a
mature standards-based management system had been met: with the sanctioning of the WSS
Closure Process, the complex had an institutionalized tool for selecting and approving
standards’ tool predicated on the expectations and principles laid out in the Criteria.
With the institutionalization of the WSS Closure Process, new opportunities for doing work more
safely and more efficiently became evident throughout the DOE Complex. However, both the
DSC and the owners of potential applications of the WSS Closure Process recognized that
selecting and approving an appropriate set of standards is only the first step in achieving a
functional and mature standards-based management system. Once the standards are approved,
they still must be translated into the performance of work.
Here, too, the Criteria identified expectations on how the standards should be captured in work
planning; how work controls should be developed and work performed; how feedback should be
used to contribute to ensuring the continued efficacy of work and work processes; and how
assessment strategies should be aligned to reinforce and validate the overall integrity of the
system.
As with development of the WSS Closure Process, the issue with implementation was not that no
previous method or system existed. As was recognized by the DSC from the outset,
implementation is not at all new: for as long as DOE has been doing work, standards and
program requirements have generally been captured in and translated into work through the use
of policies, plans, and procedures. Policies provide a statement of intent and philosophy; plans
establish specific agreements and commitments such as resource allocations and schedules; and
procedures prescribe the detailed direction on how to accomplish the tasks that cumulatively
represent the agreed-to scope of work.
Section 5
However, experience in recent years has manifestly demonstrated that capturing requirements
and standards in a facility’s or program’s documentation is not synonymous with, nor an accurate
indicator of, implementation effectiveness. The missing ingredient is not availability of a
strategy, but, rather, availability of a strategy that embeds the Work Smart principles within the
implementation function. In other words, there is a two-fold measure of implementation
effectiveness: (1) its success in meeting the mechanical expectations that ensure work proceeds
in concert with the agreed-upon standards and (2) its success in using the “Work Smart
Principles” to satisfy the expectations (Figure 1) of affected communities: management,
workers, assessors, and stakeholders.
DOE G 450.3-2 3
February 1997
Using this “expectation yardstick,” it is evident that while isolated successes in implementation
have occurred within DOE, DOE and its contractors have not produced a consistent record of
Management • Work is proceeding safely and efficiently
• Work is being carried our consistent with standards
• All levels of implementation remain within established standards
• Technical, management, and performance standards are integrated
Workers • Worker safety is a paramount consideration
• Systems exist for participation and input
• Experience and capability are recognized
Assessors • Work is performed consistent with standards
Stakeholders • Focus is on getting work done
• Work is performed safely and efficiently
• Public and environmental safety are paramount considerations
Figure 1. Expectations Associated with Effective Implementation.
effective implementation. Achieving a consistent record requires two conditions: (1) broad
appreciation of precisely what is meant by “effective implementation,” and (2) availability of a
tool to promote and provide the ability to achieve or enhance effective implementation—both for
those work activities transitioning from the process of selecting standards into the
implementation phase and for those work activities seeking to make improvements in ongoing
implementation initiatives and practices.
Accordingly, the DSC chartered a Standards Process Action Team (SPAT 12) to accomplish
precisely these ends:
• develop a definition and understanding of effective implementation that can be used to
enhance communication and foster collaboration among DOE, its contractors, and its
stakeholders
• establish a framework to guide implementation of sets of standards approved using the
WSS Closure Process
• establish a framework to promote improved implementation for those activities that are
already in the implementation phase, irrespective of the means by which standards were
identified and approved.
This report provides the results of the team’s efforts. The sections of the report correspond with
the objectives established for the team by the DSC:
• Section I, Introduction, provides the context and background of this project
4 DOE G 450.3-2
February 1997
• Section II, Implementation, provides an explanation of implementation—its scope and
focus
• Section III, Attributes of Effective Implementation, provides an explanation of why
attributes were selected as the tool most appropriate for improving implementation, the
process used for deriving the attributes, and the use of attributes in supporting Integrated
Safety Management Systems.
Section 6
• Section IV, Attribute Descriptions, provides descriptions of each of the attributes, including
descriptions of conditions found when the attribute is in evidence, benefits of the attribute,
and field examples as observed during team visits to DOE sites.
II. IMPLEMENTATION
A. IMPLEMENTATION: BASIC DEFINITION
Implementation, in its broadest sense, deals with getting the work done, with the steps that follow
the selection and approval of a set of standards for the work and the hazards. In the Criteria,
implementation deals with the elements described in Criteria 6 through 10:
• Criterion 6: Department line management and contractor management implement necessary
and sufficient sets of standards to provide protection during the accomplishment of work,
including all requirements imposed by law.
• Criterion 7: Department line management and contractor management incorporate agreed-
upon standards through design, operating and administrative controls
• Criterion 8: Work is performed in compliance with design, operating, and administrative
controls
• Criterion 9: Implementation of the agreed-upon standards is confirmed
• Criterion 10: Compliance with agreed-upon standards is maintained, and noncompliances
are resolved in a timely manner.
Another way to envision the scope of implementation is by using the basic figure depicting the
five functions accomplished by a Safety Management System (SMS). Using this communication
model, implementation is the cumulative scope of the three shaded elements: establish controls,
perform work, assess and feedback (Figure 2).
B. IMPLEMENTATION: EXPANDED DEFINITION
Using this basic representation of implementation, a more specific definition can be derived.
Additionally, the more exact definition can be used to introduce the concept of “effectiveness,”
DOE G 450.3-2 5
February 1997
Figure 2. Implementation and Integrated Safety Management.
the recognition of when these functions are done well (in keeping with the expectations of the
Criteria and the Work Smart Principles).
As a first step in refining the definition, implementation was defined in terms of its scope:
Implementation represents the scope of activity encompassed in (1) planning work,
(2) performing work, (3) performance assessment, and (4) providing and addressing feedback.
This basic definition was then expanded by defining specific starting and ending points for each
of the components of implementation (Figure 3), and then by introducing the notion of
“effectiveness.”
Combining the preliminary definitions with the statements of starting and ending points produced
a clearly articulated framework for understanding and communicating the concept of effective
implementation, effective work planning, effective work performance, effective performance
assessment, and effective work feedback.
Effective Implementation: Planning and performing the work in accordance with the agreed-
upon standards, confirming this has been done, and maintaining and improving work planning
and performance based on feedback.
Effective Work Planning: Reaching agreement on standards and expectations for refined
definitions of work down to the level of activity at which work is performed, concluding with the
6 DOE G 450.3-2
February 1997
informed acceptance of expectations by those responsible for the performance of work. Informed
acceptance means with full knowledge and understanding of all management expectations.
Component Start Point End Point
Section 7
Work Planning Work, hazards, and N&S standards
for the work have been defined
Informed acceptance of expectations
for the work by those responsible for
the performance of work
Work Performance Approval to proceed with work Completion of the approved work
Performance Assessment Approval to performs work Completion of the approved work
Work Feedback No specific starting point; can start
anytime in the process
Disposition of feedback
Figure 3. Parameters for Implementation Components.
Effective Work Performance: Performing work safely and in accordance with the work plans
and work controls incorporated in the work plans.
Effective Performance Assessment: Providing recognized and credible information on
strengths and weaknesses of work planning and performance.
Effective Work Feedback: Appropriately using assessment information for maintaining
performance or achieving improvement.
III. ATTRIBUTES OF EFFECTIVE IMPLEMENTATION
A. SELECTION OF ATTRIBUTES AS THE APPROPRIATE TOOL
All of the Department's contractors have developed methods for translating applicable standards
(requirements) into work controls and work practices. In addition, most contractor management
systems provide for worker feedback. The contractor safety management systems are subject to
multiple levels of oversight and assessment. In most cases, the contractors have conducted work
over a considerable period with a reasonable to excellent level of safety, as indicated by standard
statistical measures of safety (e.g., OSHA standards).
Although there has been a significant degree of commonality in the high level standards that have
been applied to the various Department contracts, this has not led to commonality in the work
practices and philosophies. The differences in work practices and philosophies have evolved
over time as direct consequences of the differences that exist in the work activities throughout
the complex. For example, Figure 4 illustrates how work planning at various DOE sites is
accomplished; while all sites use a common framework to reach agreement down to the level at
DOE G 450.3-2 7
February 1997
which work is performed, each site has customized the process to best support its work and work
environment. The dual need for (1) higher level standards that provide more flexible
implementation, and (2) work planning that provides a greater degree of rigor and effectiveness
has led to the development of the Work Smart approach to safety management.
Guidance on effective implementation of agreed-upon standards needs to be applicable to diverse
work, work environments, and user communities. It needs to provide useful guidance while
allowing the flexibility that is necessary for effective and efficient safety management. It should
promote and strengthen a common vision among management, workers, and independent
assessors with regard to effective implementation. And finally, it should not prescribe how
effective implementation is to be accomplished, but rather describe what it is or looks like in
order to help managers and workers set appropriate goals and measure accomplishments.
The team determined that the best approach for meeting all of these criteria was to provide a set
of attributes that correlate with effective implementation, and to indicate how the user can
identify these attributes through observations in the field. The objective is to encourage
managers and workers to use their experience, expertise, and professional judgment to make
more valuable and productive contributions to safe and efficient performance of work.
Section 8
Knowing the work and understanding the hazards are essential prerequisites to participating in
any effort to improve implementation. The attribute set does not allow for uninformed
participation in work planning, work performance, performance assessment, or feedback.
Participation in those activities without first attaining a good understanding of the work, work
environment and associated hazards will, inevitably, diminish overall effectiveness, and
can—though unintentionally—introduce barriers to doing the work safely and efficiently. The
Site Activity
Description
Facility
Environment
Activity
Environment
Integrated
Control
Rocky Flats Drain tanks 771 Basis for
Operation (BFO)
Activity Control
Envelope (ACE)
Work procedures
Livermore Experimental
projects
Facility Safety
Procedure
Experiment plans Experimental
barriers and
procedures
Oak Ridge (HFIR) Operate reactor Safety Analysis
Report (SAR)
Unreviewed
Safety Question
(USQ) process
Procedures and
readiness reviews
Hanford (Purex) Deactivate facility Project Plan Job safety analysis
(JSA); enhanced
work planning
Work control and
procedures
Figure 4. Examples of DOE Planning Structures.
8 DOE G 450.3-2
February 1997
attribute set is intended to promote and foster a logic of implementation predicated on the work
smart principles:
• a focus on the work, as opposed to beginning with a focus on requirements or hazards;
• teamwork, highlighted by cooperative engagement of affected organizations and
individuals;
• fostering of and reliance on sound judgment, experience, and operating knowledge;
• an emphasis on ownership and accountability;
• decision-making at the appropriate operating levels;
• enhanced communication throughout the process and work cycles;
• a rational balance between safety and efficiency;
• an appreciation of the distinctive differences among the numerous work activities and work
environments evidenced within the DOE Complex.
The relationship of ownership to responsibility and accountability deserves discussion in light of
the different perceptions that were encountered during the preparation of this report.
Responsibility for work can be assigned, and individuals can be held accountable for performing
the work. Ownership cannot be assigned. It arises within an individual as a result of the
informed acceptance of responsibility and accountability for defined work. In some cases,
individuals can feel ownership for all of the work of their organization, even work for which they
are not directly responsible. This broader sense of ownership can be highly productive when
expressed in appropriate ways, through teamwork, for example.
B. DEVELOPING THE ATTRIBUTE SET
Using the refined definitions of effective implementation, the team developed a process for
deriving a set of attributes that correlate with effective implementation. This process consisted
of observing implementation practices at a select number of DOE sites, and then deriving the
attribute set through a disciplined and deliberate process of assessment and evaluation using the
combined experience and expertise of the team. Because the observations were limited to DOE
sites, the team recognizes that the list of attributes is not definitive, and should be subject to
regular re-evaluation, refinement, and expansion. The goal was to develop a preliminary set of
attributes, which would allow persons involved in implementation to take broad measure of their
efforts, to create a forum for sharing and communicating successful practices, and to encourage
practical, pragmatic, and creative thinking about additional opportunities every program has to
improve upon current implementation efforts.
Section 9
DOE G 450.3-2 9
February 1997
To accomplish these goals, the process used to identify and derive attributes was structured in
four phases: Phase 1 was to refine the definition and scope of implementation (discussed in
Section II, Implementation); Phase 2 was to conduct a series of site visits to gather data about
implementation practices; Phase 3 was to analyze the data from the visits and to determine any
common themes observed; and Phase 4 was to derive the underlying attributes that correlate
with effective implementation.
Data Gathering: The first step in developing the attribute list was to gain an understanding and
appreciation of what was being done relative to implementation in the field. To achieve this
goal, specific areas of interest and lines of inquiry relative to implementation were developed for
use during site visits (Figure 5). These lines of inquiry were used not as formal checklists, but as
general discussion topics intended to ensure high confidence in the completeness of the
information being gathered by the team.
As an initial test of the team’s methodology and lines of inquiry, the entire team, as a group,
conducted the initial site visit, which was held at Livermore. This group visit helped refine the
questions and topic areas, and ensured that all team members shared a common sense of the lines
of inquiry and the scope of implementation about which information was being gathered.
Observing a sufficient sampling of the types of DOE work activities was understood as critical in
establishing the validity of the team’s conclusions. Therefore, a site list was constructed that
offered perspective from large and small sites, of traditional and non-traditional DOE work, of
routine and non-routine work activities, of stable work environments and highly dynamic work
environments. Teams of 2 to 4 people visited each site for 1 to 2 days. Site visits included tours,
presentations, and informal meetings with DOE and contractor personnel, including workers,
Work Planning Work Performance Assessment Feedback
• Worker input
• Customer input
• Documentation
• Communication
methods
• Maintaining
information current
• Integration of
standards (including
cost and schedule
• Safety experience
• Safety behavior
• Cost and schedule
experience
• Worker authority
versus responsibility
• Worker confidence
• Basis for assessment
at each level of
planning and
performance
• Feedback from worker
• Feedback to worker
• Lessons learned
• Performance metrics
• Trending
Figure 5. Areas of Specific Focus During Site Visits.
10 DOE G 450.3-2
February 1997
technicians, ES&H professionals, and management. The hosts were informed in advance of the
visit that the goal was to gain an understanding of implementation practices. (Figure 6 is a list of
the sites visited.)
Synthesis and Analysis: Once all site visits had been completed, individuals prepared reports
documenting their observations. Then, the members of each team that had visited a site got
together to discuss what they had seen, what items had made strong impressions on them, and
why. The next step was putting together the lists from the site teams. Related themes were
grouped and then discussed further to ensure a thorough understanding of each item on the list.
The lists of common themes were then refined and combined. Using the combined list,
discussion focused on determining underlying principles, influences, and causal factors. Finally,
this led to an understanding of the attributes themselves. (Figure 7 depicts the steps used in
deriving the attributes. Figure 8 is a depiction of the overall process used in the development of
the attribute set.)
Section 10
C. ATTRIBUTES AND INTEGRATED SAFETY MANAGEMENT
The DOE Guiding Principles of Integrated Safety Management are intended to permit different
approaches to tailoring a set of implementing mechanisms while ensuring that a set of core
values is preserved in any acceptable Integrated Safety Management System (ISMS) design and
performance. The DOE mission comprises exceptional diversity in the scope and complexity. It
includes both conventional and unconventional work. In some cases, the uncertainties associated
with characterization of the work, the work environment, and the hazards require tailored
Work Planning Focus of Visit
Fermi Transition to/implementation of an N&S set of standards
Fernald New approaches to work planning
Hanford Teamed approach to planning and performance of deactivation activities (PUREX)
Laboratory operations [Pacific Northwest National Laboratory (PNNL)]
Livermore Experimental mission; combined bottoms-up/top-down approach
Nevada Implementation in construction environment; non-nuclear activities at nuclear site
Oak Ridge Implementation at a reactor (HFIR)
Pantex Weapons assembly and disassembly
Rocky Flats Tank draining operations; conversion of building to radioactive waste storage
Savannah River Site Vitrification of waste (DWPF); introduction of high-performance work teams
Figure 6. Sites Visited.
DOE G 450.3-2 11
February 1997
Figure 7. Process for Deriving Attributes.
management approaches. It is recognized there can be no single right answer to implementation
of standards or the achievement of integration.
The attributes of effective implementation represent an effective tool in the operation of an
Integrated Safety/Management System as envisioned in the DOE Guide 450.4. Work Smart
principles represent a coherent strategy for tailoring the performance of an ISMS. The Work
Smart Manual process applied to work design leads to an agreed-upon set of expectations
(standards) that are tailored to the work. Application of Work Smart thinking to work
performance, using the ISMS basic Safety Management Functions, permits identification of a set
of characteristic observables by which the integration of ISMS Mechanisms, Responsibilities,
and Implementation (execution methods) can be assessed for effectiveness. The relationship
12 DOE G 450.3-2
February 1997
Figure 8. Overview of Team Process.
between the ISMS concepts and Work Smart principles is depicted in Figure 9.
In developing the Safety Management System (SMS) description required by the Environment,
Safety, and Health Clause of the contract, the contractor must integrate the need to contain risk,
meet mission objectives, and meet applicable requirements. The objective in each case is to
perform the core safety functions in a manner that fulfills the Integrated Safety Management
Guiding Principles. The mechanisms used to implement the core safety functions are sometimes
unique, but more usually are drawn from sets of mechanisms that are common across broad
DOE G 450.3-2 13
February 1997
Figure 9. Relationship Between ISMS Concepts and Work Smart Principles.
Section 11
sectors of the DOE complex. The selection and use of the mechanisms is tailored to the
management philosophy and style of a particular contractor and the resulting set of mechanisms
may well be unique. Beyond that, the design, operating, and administrative controls are tailored
by the contractor to the work, the work environment and the associated hazards. This is why
there may be little to distinguish between the basic standards (e.g., laws, regulations, consensus
standards) applicable to different contracts, or even the commitments made in different SMSs,
while the actual fulfillment of the commitments will need to be different to provide adequate
protection efficiently. Coupling the “Work Smart” approach with a set of attributes for effective
implementation promotes the tailoring of work controls that are both effective and efficient.
A set of attributes that signify effective implementation provides a universal basis for evaluation
and improvement. The set of attributes is equally relevant in all work environments, independent
of whether the agreed-upon standards being implemented were derived by the WSS Closure
Process or some other means. The attribute set can be used by all groups involved in the
implementation of standards to promote more effective, more collaborative, safer, and more
efficient ways of planning work, performing work, assessing performance, and using feedback to
improve work planning and performance.
14 DOE G 450.3-2
February 1997
IV. ATTRIBUTE DESCRIPTIONS
ATTRIBUTES OF EFFECTIVE IMPLEMENTATION
1. Planning, performance, and assessment are focused on the work.
2. ES&H standards are integrated with other expectations for the work.
3. Line ownership of ES&H is evident.
4. Worker ownership, confidence, and job satisfaction are evident.
5. DOE and contractor line management provide tangible evidence of commitment to
implementation of agreed-upon standards.
6. Workers know and understand operational and strategic objectives.
7. Managers and workers promote compatibility between individual motives and
institutional norms.
8. Workers have timely participation in work planning.
9. Work planning is carried out with an integrated project approach.
10. Work planning and work controls are based on collective knowledge.
11. Information necessary for work planning and performance is reliable, readily available,
and communicated with appropriate tools and methods.
12. Training and qualification of workers support reliance on judgment and expertise.
13. Workers know, understand, and believe in agreed-upon standards.
14. Managers do not allow worker ownership without informed acceptance.
15. Work is conducted in accordance with agreed-upon work controls.
16. Performance of work is based on worker knowledge and ownership.
17. A formal program of self-assessment supports organizational learning.
18. Assessment criteria are developed during work planning.
19. Assessment criteria are based on agreed-upon expectations.
20. Cost effectiveness is one measure of performance.
21. Planning and performance of work are responsive to feedback.
DOE G 450.3-2 15
February 1997
These 21 attributes relate to all four components of effective implementation (planning,
performance, confirmation, and feedback). Some attributes, rather than lying exclusively within
the boundaries of one of these components, have broad reaching implications that are equally
applicable, and equally essential to each of the four components. Others are more specifically
focused on a particular component of implementation. The attributes are presented in a single
list; the numbers are used simply to discriminate among the attributes and are not intended to
suggest relative importance or order of examination.
Section 12
The set, as noted, does not provide a template, model, or checklist for assessing or achieving
effective implementation. Each attribute, and the set as a whole, must be carefully considered in
light of the particular circumstances governing its proposed use. In this regard, each attribute is
described using a structure designed to allow potential implementers to make judgments
regarding the appropriate degree to which the attribute is and should be in evidence in the
workplace. With the same goal of fostering thinking rather than promoting prescription, select
examples of how each attribute has been observed among the visited sites is provided again, not
as models to be replicated, but as examples of the various means by which the attribute has been
introduced.
For each attribute, there are three subheadings:
1. Evidence of the attribute: What is seen in the work place when the attribute is in effect.
2. Benefits of the attribute: What advantages accrue from having the attribute in effect.
3. Field examples: Illustrations of how the attribute was manifested at sites visited by the team.
ATTRIBUTE 1: Planning, performance, and assessment are focused on the work.
Evidence of Attribute: At each level of work management, the identification of standards for
the work begins with a characterization of the work, the work environment, and the hazards
associated with the work. The level of detail for the characterization is necessary and sufficient
for the identification of the standards appropriate for the level of work management. (For
example, the level of detail will be greater for identifying task level work controls than will be
needed for identifying contract requirements or site level standards.) Work performance is
focused on completing the work in a manner that meets all applicable standards, including, as
appropriate, ES&H, quality, productivity, schedule, and design standards. Assessment is focused
on performance to meet objectives and expectations, and on how improvements in performance
could be effected by changes to the design of the work or modification of the standards.
Benefits of Attribute: An integrated approach to work planning, performance and assessment
requires a global approach that is best achieved by focusing on the central issue: the work.
(Focusing on hazards or requirements tends to result in segregation of issues—stovepiping.) The
result of focusing on the work is a more substantive and accurate characterization of the work,
work environment and hazards, and the identification of standards that are constructively related
to (i.e., necessary and sufficient for) safe performance of the work. This improves safety, worker
morale, and program efficiency.
16 DOE G 450.3-2
February 1997
Field Examples of Attribute:
PUREX. Deactivation tasks are planned by cross-functional teams including craft workers,
ES&H and engineering personnel, and other experts, as appropriate. The planning begins with a
walk-down to refine the definition of the task, including a characterization of the work
environment and the identification of hazards. This information is entered into a computer-aided
analytical tool that supports a disciplined approach to the identification of applicable standards
and resources, including technical resources that might be needed during the planning activity.
The focus is on the work and what it will take to do the work safely and efficiently. Team
members interviewed expressed satisfaction and a sense of ownership for the work and for
performing in accordance with the standards that they had collectively identified. Both
management and workers noted that work performance was both more efficient and timely as a
result of work packages being developed with a focus on the work, rather than on compliance
with an arbitrary set of standards.
Section 13
Fernald. Maintenance work packages are prepared by cross-functional teams including ES&H
and maintenance personnel (craft workers are not involved). The work planning begins with a
definition of the maintenance task and the identification of hazards. The applicable standards
and procedures are identified and incorporated into the work package.
HFIR. Maintenance work packages are prepared by cross-functional teams including ES&H,
maintenance, and reactor operations personnel (craft workers are not involved). The work
planning begins with a definition of the maintenance task and the identification of hazards. The
applicable standards and procedures are identified and incorporated into the work package.
Nevada. A project based structure for doing work is being adopted. Project managers (whose
goal is to accomplish the work safely and efficiently) are in charge of the work, and are
empowered to cut across organizational lines in order to plan and to perform the work. Project
managers set the vision for the work and form multi-disciplinary teams to plan and perform the
work. The project manager, in effect, has control of all resources needed to get the work done.
The matrix organization supports the project managers in assembling the project teams, and
project managers are backed up by a high-level project management department. ES&H
functions and self-assessment functions are included as integral elements of the project team.
Project managers are being incentivized to ask for external assessment as well. Decisions on
procedures (Which ones are needed? In what detail?) are being pushed down, as much as
possible, to the level of the project manager or below. Placing resources and responsibilities in
the hands of a project manager tasked with doing the work helps assure that the focus is on the
work.
SRS (DWPF). Maintenance work packages are developed using multi-disciplinary teams
including ES&H, maintenance, operations, and engineering personnel. The planning begins with
a walk-down to clearly define the maintenance task and to identify hazards. The maintenance
task is analyzed using a graded approach commensurate with the hazards identified. The
applicable standards and procedures are identified and incorporated into the work package.
DOE G 450.3-2 17
February 1997
ATTRIBUTE 2: ES&H standards are integrated with other expectations for the work.
Evidence of Attribute: ES&H standards are incorporated into the work planning process and
are addressed concurrently with the other management expectations for the performance of the
work. Work design takes into account the potential for reducing or eliminating hazards. Multi-
disciplinary work planning teams include ES&H professionals along with the workers and the
other technical disciplines relevant to the safe, efficient performance of the work. Line managers
and workers understand that their responsibility encompasses safety as will as other aspects of
work performance. Self-assessments address all aspects of work performance—safety, quality,
and efficiency—with a particular focus on conformance with agreed-upon work controls.
Benefits of Attribute: Work plans that integrate all expectations eliminate conflicts and result
in a more uniform understanding of performance criteria. Line manager and worker ownership is
encouraged when accountability for safety is clearly established. Worker confidence and safety
are improved. Efficiency is not threatened by add-on safety requirements after work planning is
completed.
Section 14
Field Examples of Attribute:
NEVADA. As Nevada transitions to a project management form of work organization, ES&H
personnel are being deployed (via the matrix organization) out to specific projects. Project
managers assemble teams of personnel to perform project work and ES&H personnel are part of
the project team. As the ES&H personnel who are deployed to a project become an integral part
of that project team, they help ensure that ES&H standards are integrated into project planning
and finally into project performance. Integration of the ES&H personnel into the team is
encouraged by the project manager becoming responsible for the ES&H team member's
performance appraisal (or at least that share of it relating to project work, if the project doesn't
require full time ES&H). The project manager's responsibilities include responsibility for
ES&H, so both the project manager and the ES&H team members are incentivized to make sure
ES&H is properly integrated into performance.
Pantex. ES&H standards are now integrated with other expectations into weapons assembly and
disassembly activities. To allow better understanding and integration, work scopes were divided
into discrete sets of activities. Thorough analyses of the processes, the technical requirements,
and the hazards were then conducted using teams of operations and ES&H personnel. These
teams had complete responsibility to ensure work was being done both safely and
efficiently—integrating the technical, management, and safety expectations. The outcome was
better organizational alignments, restructuring of requirements databases to incorporate all
pertinent standards, and revision of the majority of procedures to reflect the broadened
perspective.
PUREX. The multi-disciplinary work planning integrates all expectations for the work,
including ES&H standards and requirements, into the work.
18 DOE G 450.3-2
February 1997
Fernald. Maintenance task plans incorporate all expectations for the work, including ES&H
standards and requirements, into the work plan.
HFIR. Maintenance task plans incorporate all expectations for the work, including ES&H
standards and requiremnts, into the work plan.
ATTRIBUTE 3: Line ownership of ES&H is evident.
Evidence of Attribute: Line managers establish and communicate goals for the integrated
ES&H program and objectives for meeting those goals in a manner that conveys full
understanding of expectations to all workers. They provide active and visible leadership in
implementing the program so that all workers (contractor, subcontractor, and facility users)
understand that management commitment is genuine and enthusiastic. Line managers facilitate
and encourage employee involvement in the structure and operation of the program, as well as in
the decisions that affect their safety and health, and the protection of the environment. Worker
commitment to achieve program goals and objectives is fostered and maintained by line
managers. Responsibility (and associated accountability) is assigned and communicated for all
aspects of the program so that all managers, supervisors, and employees in all parts of the
organization know what is expected of them.
Benefits of Attribute: Ownership by line managers and workers, achieved by involvement in
the day-to-day incorporation of safety into operations at every level, provides continued
reductions in all levels and kinds of injuries and environmental incidents. The establishment of a
positive, team-oriented work environment produces continued improvement of efficiency and
performance by using managers and workers as a diverse source of technological and operational
experience and ideas.
Section 15
Field Examples of Attribute:
PNNL. Radiological control technicians (RCTs), radiological engineers, and radiological work
permit (RWP) writers are directly funded by the projects they support. The staff are matrixed to
the line organizations and receive their day-to-day priorities from line management. Funding and
FTE levels are renegotiated each year as part of the business planning cycle. For the most part,
RCTs, radiological engineers and RWP writers are resident in the facilities. To ensure
independence in making correct radiological decisions, these staff remain accountable to the
Radiological Control Manager.
Fermi. The Laboratory Director has assigned the responsibility for ES&H performance to the
line managers. This assignment includes direction for activities that are required to effect the
responsibility and includes the resources (professional ES&H staff) to conduct those activities.
The Director has established a system of Laboratory ES&H committees and subcommittees who
participate in the development of policy and standards. These employees (technicians, engineers,
scientists, clerical people, and all level of managers) bring to the discussions the technical
DOE G 450.3-2 19
February 1997
expertise and perspective of the organizations they represent. The top level committee includes
regular meetings of the Director with the top level managers.
SRS. The Enhanced Work Team for the Waste Water Treatment Plant is composed of a team
leader and all the employees (which include ES&H technicians). The team establishes the goals
for the Plant, including ES&H goals and objectives. A team meeting is held at least once a week
to decide what tasks need to be performed and how to accomplish those tasks in the most
efficient and safe way. Responsibility is assigned to the team members by the team so all
members know what is expected of them. The employees are fully involved in the
implementation and day-to-day incorporation of ES&H into operations at every level.
PUREX. Line managers fought for the opportunity to apply the modified enhanced work
planning, multi-disciplinary team approach to work planning at the PUREX plant. The result is
obvious ownership of work planning and work plans by the plant manager and the workers.
ATTRIBUTE 4: Worker ownership, confidence, and job satisfaction are evident.
Evidence of Attribute: Workers can describe why their jobs are important and can describe
what job ownership (informed acceptance) means. Workers express pride in their jobs and are
confident in their abilities to perform safely and efficiently. Workers express not merely a sense
of ownership in their own jobs, but joint ownership of the organizational goals as well.
Management provides opportunities for workers to expand their skills and knowledge. Workers
are confident that they are meeting management's expectations. Workers express satisfaction
with their jobs and with their organization. Workers believe that communications to and from
management are effective and adequate. Management regularly applies, and pays attention to,
measures of worker confidence and satisfaction.
Benefits of Attribute: Work ownership by qualified individuals meets individual goals of
competency, esteem, and achievement; and meets management goals of accomplishing work
safely and effectively. Although research on “job satisfaction” varies widely, individual feelings
of self-worth, competency, and satisfaction generally do promote greater productivity and better
work performance. Job satisfaction may even enhance safety performance. Job satisfaction also
aids integration of individual and institutional needs.
Section 16
Field Examples of Attributes:
SRS. The Enhanced Work Team for the Waste Water Treatment Plant is made up of all the plant
employees. Through analysis of the work and identification of the performance expectations, the
team identified job tasks. Specific responsibilities are assigned to team members by the team;
team members know what is expected of them and how their assignments contribute to ensuring
work is performed safely and effectively. The team also benchmarked commercial operations to
gain further perspective. The workers interviewed expressed pride in their jobs and were
confident in their abilities to perform safely and efficiently. Through this initiative, the personnel
20 DOE G 450.3-2
February 1997
needed to operate the facility was reduced by 50 percent while the productivity and safety
confidence level increased.
Nevada. The workers who had been involved in the N&S process were pleased at the way
changes had been occurring. They had a sense of the institutional goals coinciding with their
own goals. These workers felt in charge of their jobs, and were happy that their expertise had
been enlisted to help develop new standards. They knew how their jobs related to the
organizational goals. They expressed confidence that the changes they were undergoing were in
the right direction and that, with a little tweaking of the new policies, things would be better in
the future. More than one worker spoke to us of the need to become competitive in a commercial
world and expressed confidence that they could do it. Workers felt they knew what management
expected of them, and that good performance would be rewarded.
PUREX. Interviews with the plant manager and with one of the multi-disciplinary work
planning teams indicated a high level of ownership, confidence, and pride. One worker,
evidently speaking for the team, said, “We are all here because we want to be here. We want to
put this old dinosaur to sleep.” The team indicated that the team approach to work planning
allowed their individual input to matter and this was a source of job satisfaction.
ATTRIBUTE 5: DOE and contractor line management provide tangible evidence of
commitment to implementation of agreed-upon standards.
Evidence of Attribute: Personnel at each organizational level express the belief that higher
levels of management are committed to implementation of agreed-upon standards. An active
self-assessment program is aimed at improving performance of work to meet and exceed agreed-
upon standards. Performance assessments and associated award systems use the agreed-upon
standards as measures of performance. Non-conformance with standards results in rapid and
effective corrective action by management.
Benefits of Attribute: Workers respond to what they see, not what they are told; management
inconsistency results in workforce confusion and demoralization. Tangible evidence of
management commitment to implementation of agreed-upon standards provides the workforce
with a logical, clear and consistent sense of direction. Experience has shown that this motivates
workers to meet and exceed standards, and to identify and initiate correction of non-
conformances.
Field Examples of Attribute:
PUREX. Members of the cross-functional teams doing the work planning, including craft
workers, ES&H and engineering personnel, noted that the willingness of workers to engage in the
work definition, hazards analysis, and standards identification tended to evolve from reluctant to
enthusiastic as management consistently demonstrated a commitment to implementation of the
identified standards. The team members expressed and exhibited professional pride in their
ability to plan and perform the work safely.
Section 17
DOE G 450.3-2 21
February 1997
HFIR. DOE and HFIR management and workers uniformly expressed personal commitment
and the belief that their management and coworkers were committed to meet the standards that
had been established for the reactor. A high degree of professionalism and pride in the work was
evident at all levels.
Nevada. Both DOE and Bechtel top management are behind a push to change the existing
culture and implement agreed-upon standards. Both management and workers stated that they
were convinced that most of management was supporting such a change. Workers were
particularly impressed that the top DOE manager at Nevada had held all-hands meetings and told
DOE personnel that they had to be client driven. The DOE Manager also closed an on-site audit
office, demonstrating tangibly that he intended his staff to be part of the new thinking. These
steps were seen as a dramatic shift from past practice and as evidence of a commitment to
implement new agreed-upon standards. Workers expressed the change by stating “DOE is now
expecting us to be the expert, rather than the lackey.”
The Bechtel Nevada top manager also held all-hands meetings to explain the changes. These
meetings provided workers with a sense that both DOE and contractor management were
committed to implementation of the agreed-upon standards. There was also a perception that
communication between the DOE Field Office and the contractor had improved significantly,
that the message from the top in both organizations was the same. This unified message was
seen as evidence of commitment to an agreed-upon goal. What most impressed the workers,
however, was that the cash benefits that result from good performance will be shared with all
employees. This incentivization of workers to actively support the new standards was seen as
very strong commitment on the part of management to implement the new standards.
ATTRIBUTE 6: Workers know and understand operational and strategic objectives.
Evidence of Attribute: Workers are able to describe how their work fits into the overall work
of their site and of the DOE. Workers know what work is to be done, and workers understand
how that work will support the announced goals for their site and for DOE. That is, workers also
understand why work is being done. DOE and company management communicate objectives
and goals to workers, and help to show workers how their work supports the objectives and
goals.
Benefits of Attribute: Workers want to feel that their work matters, that their contribution
makes a difference. By helping workers know and understand DOE and company goals,
management helps workers see that their work has a purpose. A worker who knows his or her
work is important in supporting an announced goal will be more involved than a worker who
doesn't know how or if his or her work contributes. Fostering a knowledge of goals helps foster a
sense of responsibility in the worker, which can lead to improved performance. In addition, a
worker who knows what his or her work supports is in a much better position to suggest work
enhancements and improvements.
22 DOE G 450.3-2
February 1997
Field Examples of Attributes:
Section 18
Nevada. DOE Nevada and Bechtel top management are both trying to communicate new
operational and strategic objectives to the Nevada workforce. Both top managers have held a
series of all-hands meetings to explain the new objectives. They have made a point of describing
how the new objectives differ from the traditional ways of doing business. There are regular
announcements as to the progress towards the objectives. The success of these communications
was evidenced by the fact the workers were able to identify what the objectives were and how the
site was progressing towards them. The fact that worker bonuses were tied to success with the
new objectives helped focus worker knowledge.
PUREX. PUREX workers find themselves in a very difficult situation: deactivating the facility
is, in fact, working themselves out of their jobs—with few, if any, work assignments available on
site to which to transfer when this work is done. The management clearly understood the
implications of the work, and took an active role in making workers aware of what the work was,
why it was important, and what its timely completion meant—to the site and the workers.
Working together, the management and workers were able to gain the perspective that has
allowed the work to proceed, while increasing worker morale by making them more active
participants in all aspects of the work and by creating an atmosphere of open communications.
ATTRIBUTE 7: Managers and workers promote compatibility between individual
motives and institutional norms.
Evidence of Attribute: Managers communicate and gain worker acceptance of institutional
norms (such as organizational structure, training, advancement policies, benefits, working
conditions, and management behavior). Institutional norms reflect consideration of individual
motives (such as security, interpersonal relationships, competence, esteem, and achievement).
Managers adjust institutional norms as necessary (and as possible) to support workers’ individual
motives. Workers are able to identify the rationale underlying institutional norms that affect their
interests. Workers are encouraged to communicate their interests and concerns to managers. The
most recent examples of worker concerns indicate effective management response.
Benefits of Attribute: When managers and workers understand the need for compatibility
between individual motives and institutional norms, open communication can be established and
maintained. Cooperative engagement is easier to achieve. Workers identify more readily with
the organization and job satisfaction is enhanced, which usually results in improved productivity.
Field Examples of Attributes:
Nevada. Improving safety performance is a recognized goal of every DOE contractor. At
Nevada, the contractor has added to the effectiveness of traditional approaches to improving
safety by incentivizing all workers. Performance-based incentives have been established
between DOE and the contractor; in turn, the contractor has created formulas to allow every
worker to share in the financial rewards that result from improved safety performance. Although,
DOE G 450.3-2 23
February 1997
Section 19
as was pointed out, in some cases the financial rewards may be minimal, it places something
tangible at risk for each employee. Individual motives of security, competence, and recognition
are being fostered by worker-run safety and pretask hazards analysis programs. Safety observer
teams now actively “patrol” to identify and help resolve potential safety issues; individuals see a
real benefit in being safe. Overall, the approach has created a partnering relationship between the
workers and the company. There is a personalized understanding of safety performance, and a
very positive attitude of “being in it together.”
Livermore. Livermore has a history and culture that is founded on respect for its professional
staff, with scientists and investigators given considerable control over the planning and execution
of their work. The laboratory expects professionalism from their staff; the staff expects to be
treated as professionals, reflected in latitude in conducting research. Work proceeds with a
minimum of procedural controls but with suitable alternate controls that provide confidence that
safety and laboratory standards are adhered to: formal facility safety parameters have been
defined; personnel must demonstrate technical and operational competencies commensurate with
laboratory standards before being granted the responsibilities and authority of Principal
Investigators; formal review processes evaluate the safety and appropriateness of proposed new
experiments. Laboratory leadership that is understood to represent both corporate and individual
motives continues to foster a very strong corporate allegiance among the workers.
ATTRIBUTE 8: Workers have timely participation in work planning.
Evidence of Attribute: Workers express confidence that the results of the work planning and
the associated work controls adequately reflect their knowledge of the work and the work
environment. The timely participation of workers (e.g., on committees or teams) in work
planning is institutionalized. Timely means that the workers at all levels responsible for doing the
work—contribute to the development of work plans, not merely that they are given an
opportunity to comment on the plans.
Benefits of Attribute: Employee involvement in planning results in better work because of their
collective, detailed knowledge of the processes/operations and the work environment associated
with the work. It also ensures their knowledge and understanding of the work, the hazards, and
the ES&H and other standards applicable to the work. Workers who are knowledgeable about
the work, hazards, and standards perform better and develop a sense of ownership for the work.
Workers are more likely to support and use programs in which they have input. Also, workers
who are encouraged to offer their ideas and whose contributions are taken seriously are more
satisfied and productive.
Field Examples of Attribute:
PNNL. Planning of radiological work is controlled by a formal procedure. A “radiological risk
assessment/ radiological work permit (RWP) request” form initiates the radiological work
planning process. This form is prepared by the requesting line organization in cooperation with
the cognizant radiological control technician (RCT) supervisor, and is accompanied by a detailed
24 DOE G 450.3-2
February 1997
Section 20
technical work document (TWD) which will control the work. The TWD may be prepared by
the worker(s) who will perform the work, the RCT(s), their supervisor(s), the cognizant engineer
or scientist, or any combination of these staff. The risk assessment, RWP request, TWD and pre-
job radiological survey constitute a “work package.” The work package is reviewed by the
cognizant radiological engineer, who ensures that appropriate engineered controls have been
incorporated. When approved, the work package is used to generate a RWP. At that point, the
work is “approved.”
Fermi. Every other week the project manager meets with the people doing the work. The full
range of technical jobs and the schedule are discussed. The workers learn about the schedule,
problems others are having, and the expectation of the project manager. The project manager
learns about the needs and problems of the workers. This meeting includes discussions of
ES&H.
SRS. The Defense Waste Processing Facility (DWPF) maintenance group uses multi-
disciplinary teams to plan work. The worker is a member of the team. The planning for work
begins with a walk down to clearly define the maintenance task and to identify hazards. This
walk down is performed by maintenance personnel and the worker (normally the person who
identified the problem).
PUREX. Cross-functional teams now are responsible for planning, as well as performing, the
work. Instead of receiving directions from a separate planning organization, the teams conduct
their own job walk downs, complete computer-aided hazard assessment surveys, arrange for any
additional reviews warranted by the hazards, conduct pre-job reviews, and then conduct the
work. Having the team conduct the planning brings in first-hand knowledge of the job and the
work environment and effectively introduces their skill and experience in designing the strategy
for approaching the work. Work also proceeds without the iterative processing of paperwork that
used to result from the inherent distance between work planning and immediate job knowledge.
Productivity, safety, and morale have all benefitted from the restructured approach to planning.
ATTRIBUTE 9: Work planning is carried out with an integrated project approach.
Evidence of Attribute: Work planning procedures require formal (documented) consideration
of potential interactions and interfaces between individual tasks within the work plan and
between the defined work and other activities that can affect or be affected by the work. Work
plans reflect this requirement. Individuals with task responsibilities are knowledgeable or aware
of the other tasks within the defined work and who the other members of the work team are.
Benefits of Attribute: Using an integrated project approach provides all involved with a full
and complete perspective of the work, eliminating fracturing of efforts, overlaps in assignments,
and potential for stovepiping requirements. In terms of ES&H, the inclusion of relevant
management and workers involved in integrated ES&H program activities will ensure that these
considerations are not added to work at a later stage, but rather integrated up-front in the work
DOE G 450.3-2 25
February 1997
planning effort to take advantage of potential savings and schedule streamlining opportunities
while minimizing program redundancies.
Section 21
Hazards and interferences arising out of interactions and interfaces are identified and resolved
during the planning process (e.g., radiation sources behind walls where work is being performed;
limited resources being assigned to two concurrent tasks; one task requiring power and a second
task requiring the circuits to be de-energized). An integrated project approach supports the goal
of informed acceptance by managers and workers and enhances both safety and efficiency.
Field Examples of Attribute:
PUREX. Work practices at Purex are understood and evaluated within the larger perspective of
deactivating an entire system (e.g., heating and ventilation). Using this larger perspective, the
company has reorganized: cross functional teams now exist as opposed to traditional
organizations reflecting different disciplines. Allowing a project approach supports better, more
complete perspectives on the work: the relationship between tasks is clearer, as is the
understanding of how one job may influence the hazards associated with another. The project
approach has also fostered a deepened sense of ownership that precludes the idea of focusing on
one task to the exclusion of the implications of how that work may effect subsequent work or
shifts. The integrated project approach benefits both the company through higher productivity,
and the workers through a better-informed, more enthusiastic work ethic.
ATTRIBUTE 10: Work planning and work controls are based on collective knowledge.
Evidence of Attribute: Multi-disciplinary teams plan work, decide on the work controls, and
determine the criteria for performance assessments. The teams include the workers who are to
perform the work. The teams depend mainly on consensus building but are encouraged to
consult management to achieve timely resolution of differences and concerns. Where
appropriate, multi-disciplinary teams are also used to perform the work. Communication among
team members and between them and management is formally encouraged.
Benefits of Attribute: Workers feel ownership for the work and the work controls. Morale and
performance are improved when workers are empowered to apply their knowledge to the design
and planning of the work they do. Involving workers in the selection of criteria for performance
assessments improves their understanding of the expectations for the work and their
corresponding commitment.
Field Examples of Attribute:
PUREX. Cross-functional teams including craft workers, ES&H and engineering personnel, and
other experts, as needed, are used to plan the deactivation tasks at the plant. During the planning
activity, team members discussed their individual views, offering arguments to support their
positions. They also stated that, although the current task did not require it, members of other
teams would be consulted when specialized knowledge or experience is needed.
26 DOE G 450.3-2
February 1997
Oak Ridge. At K-25, Surveillance & Maintenance workers have become the owners of their
standards since going through the Necessary & Sufficient Process. Now, the line organization is
responsible for maintaining the Work Smart Standards and for ensuring that work is performed in
accordance with those standards. In contrast, the Standards/Requirements Identification
(S/RIDs) database was never used by the line organization because they were not involved with
the development of S/RIDs, the database was too complicated, and the workers never understood
the importance of implementing the S/RIDs.
Section 22
ATTRIBUTE 11: Information necessary for work planning and performance is reliable,
readily available, and communicated with appropriate tools and
methods.
Evidence of Attribute: Information is delivered in a manner that is easy for the planners and
workers to use and understand. Those who rely on the information are confident in its validity
(currency and accuracy) and are able to use it in the forms presented. Configuration control is
maintained so that changes that may affect the work are incorporated in ongoing and new tasks.
Benefits of Attribute: Work proceeds safely and efficiently when information is reliable,
available, and useful. Rework is reduced and worker safety is enhanced. Worker and
management confidence is increased, and costs and schedules can be maintained.
Field Examples of Attribute:
Nevada. Nevada is reassigning ES&H personnel from a centralized organization directly to the
projects. This realignment provides better perspective from both facility management and ES&H
professionals and expedites the planning and execution of work. Coupled with Nevada’s
introduction of projectized work, this realignment ensures necessary information is available and
representative of the fuller project perspective rather than being segregated among the
contributing functions.
SRS. A significant volume of information is needed in support of design, operations, and
maintenance at SRS. In support of facilities like the Defense Waste Processing Facility (DWPF),
SRS has improved the methods of assuring timely availability of accurate information. As
example, all company-level procedures and the associated forms are available electronically. A
single point of control for this information ensures materials are current. In a similar way, all
engineering documentation (more than 150,000 drawings, specifications, calculations) can be
accessed electronically; work planners, design engineers, control room operators, and mechanics
have real-time access. Electronic access has also reduced or eliminated numerous controls needed
to administer hard-copy collections. This electronic availability has also introduced additional
flexibility; users can access and print out precisely the portions of documents they need.
PUREX. Work planning by multi-disciplinary teams was aided by a locally developed computer
program that provided relevant information and guidance. The planning team expressed
satisfaction with the program and with their opportunity to provide input to its development.
DOE G 450.3-2 27
February 1997
ATTRIBUTE 12: Training and qualification of workers support reliance on judgment
and expertise.
Evidence of Attribute: Workers are knowledgeable of and can describe the details of systems
they work with; they understand and can describe the hazards present as well as their magnitude;
they are familiar with and can describe the details of engineered and/or administrative controls
and processes which govern the conduct of their work.
Secondarily, individual job assignments are developed with input from the workers, which
includes an identification and analysis of hazards. From this understanding of the work and
hazards, an assessment of required knowledge, skills, and abilities is developed, a suitable
pedagogy and plan for acquiring the needed skills and capabilities is assembled, and progress
towards achieving and maintaining the plan is tracked. No work is performed until suitable
proficiency is demonstrated.
Section 23
Benefits of Attribute: Workers trained and qualified to plan and perform the work will reduce
the need for highly proceduralized work controls. This results in (1) efficient performance of
quality work in accordance with agreed-upon standards and (2) appropriate responses to unusual
or unexpected events and circumstances.
Field Examples of Attribute:
SRS. Through analysis of the work and identification of the performance expectations for the
Waste Water Treatment Plant, job tasks and hazards were identified. From this understanding of
the work and hazards, an evaluation of needed knowledge, skills, and abilities was developed.
The Enhanced Work Team was than carefully chosen to ensure the team members possessed the
needed knowledge, skills, and abilities to perform high quality, efficient work. Cross training
was completed. Members of the team are now referred to as “mechoperators” because they
function in both maintenance and operations capacities. Mechanics have also completed state
licensing requirements, allowing them to operate equipment and perform necessary maintenance
as soon as items are discovered.
PUREX. Based on their training and qualifications, cross-functional teams have been entrusted
with the full responsibility for planning and performing work. The team completes a computer-
aided survey of job hazards; they then determine what additional reviews of the job (for instance
by Health Physics) need to be completed before beginning the work. As a next step, the team, as
a group, determines how best to conduct the work. Work planning and performance rely
extensively on worker judgment and expertise.
Livermore. Livermore has a history that is founded on respect for its professional staff.
Scientists and investigators are given considerable latitude in conducting their research. Work
proceeds with a minimum of procedural controls. While several levels of administrative controls
ensure experiments will not exceed established safety parameters, investigators have discretion in
the number and detail of procedures. Reliance on judgment and expertise is a consequence of the
28 DOE G 450.3-2
February 1997
educational and experience levels of personnel. Technicians are generally degreed personnel
(many of whom hold advanced degrees), and Principal Investigators have both academic
credentials and significant experience. Even post doctoral students are not given automatic
authority as Principal Investigator, but earn this level through demonstrated familiarity with and
competence in satisfying laboratory operating and safety standards.
ATTRIBUTE 13: Workers know, understand, and believe in the agreed-upon standards.
Evidence of Attribute: Workers can describe the relationship between the standards and the
work and hazards. They speak of the standards using possessive forms (“our standards” not
“they want us to...”). They can describe the relationship between applicable higher-level
standards and the standards that directly control the work for which they are responsible.
Benefits of Attribute: Gaining the full measure of worker buy-in is predicated on their
understanding and acceptance of the standards. When workers know, understand, and believe in
standards, they have a rationale for making sure those standards are incorporated effectively into
work controls, that work controls are followed, and that timely feedback is provided when any
deviation from the standards is identified. Worker commitment is far more effective than
attempting to audit people into adhering to work policies and practices. Starting with
participation in selecting the standards, in work planning, and in generating work controls and
assessment criteria, workers can be expected to reflect a “comfort” with the standards
commensurate with their degree of ownership.
Section 24
Field Examples of Attribute:
Fermi. Technical personnel from the line organizations participate as partners in the
development of the technical standards. There is a very broad review and comment by those who
know the work—consensus is reached before the standards are adopted. When adopted, the
standards are communicated back to the line organizations for implementation. Since the line
managers have participated in the development, the standards are more easily incorporated into
the work planning. The workers demonstrated knowledge and ownership of the ES&H program
and expressed the feeling that they were an integral part of planning process.
PNNL. The Radiological Control Manager, in cooperation with line organizations, establishes
the Radiological Control Program through the development of implementing procedures. In
developing implementing procedures, the Radiological Control Department provides the
technical expertise, while the line provides user input. When the need for a new implementing
procedure is identified, a technical expert from the Radiological Control Department is assigned
to draft the procedure. The draft is circulated to a committee comprised of “users” for their
review and comments. At the same time, the draft is placed on an intralaboratory electronic
bulletin with an invitation for comments from all interested staff. The technical expert from the
Radiological Control Department is required to provide written resolution of all comments
received. The approved procedure normally specifies an implementation period. During this
period, training is provided to affected staff via computer based training available at all computer
DOE G 450.3-2 29
February 1997
workstations. The new procedure is also reviewed in the quarterly “radworker news” newsletter.
A process for staff to request changes to existing procedures is in place and is frequently used by
staff to identify opportunities for improvement. All procedure change requests receive a written
response from the assigned technical expert in the Radiological Control Department. Requests
for changes to procedures may also be generated as the result of post-job ALARA reviews or
event critiques.
PUREX. When the work is planned by the workers, they agree upon the standards based on
discussions related to the reasons for each of the standards selected. This ensures their
understanding and contributes to their belief in the need for disciplined conformance to the
standard.
ATTRIBUTE 14: Managers do not allow worker ownership without informed acceptance.
Evidence of Attribute: A method or system exists to provide workers sufficient information
and skill to perform a task safely and in accordance with all applicable standards (expectations)
before accepting responsibility for work. The system includes methods and resources for
workers to obtain the needed skills and information about the work, work environment, hazards,
and work controls through experience, training, or documentation (e.g., procedures).
Benefits of Attribute: Insisting on informed acceptance of responsibility engenders a sense of
ownership. In turn, ownership that is grounded in informed acceptance ensures better
performance of work, appropriate responses to unusual occurrences, and a proactive role in
continued improvement.
Field Examples of Attribute:
Section 25
SRS. The Enhanced Work Team for the Waste Water Treatment Plan was carefully chosen to
ensure the members possessed the needed knowledge, skills, and abilities to get the job done
safely, correctly, and efficiently. The team developed their plans and procedures and was given
the necessary training needed to perform their job tasks. Teamwork and cross-training (i.e.,
maintenance and operations working together on tasks to learn the skills that each possessed)
allowed for work to be done more efficiently. After the knowledge and skills are transferred
among team members, a fuller array of tasks (maintenance and operations) could be done by
each individual.
PUREX. Deactivation work at Purex has proceeded through a series of steps designed to ensure
a clear understanding and absolute ownership of the work. As a first step, the goals and
intermediate milestones were negotiated among the current facility owners, DOE, and the
contractor who would own the facility subsequent to deactivation. To support these agreements,
personnel were reorganized into cross functional work teams, with the appropriate expertise to
address a major subset of deactivation work; e.g., utilities, heating and ventilation. This team
was given the tools necessary to analyze and document hazards, and then provided with
responsibility for work planning and performance. Team responsibility for work planning and
30 DOE G 450.3-2
February 1997
performance and the availability of the relevant expertise and tools provided a complete and
thorough understanding of the work and hazards to support the team’s ownership of the work
plan and the work.
Livermore. Livermore is fortunate in that its historical culture supports, and is based on,
ownership. Scientists and investigators own their work: they conceive it, propose it, defend it,
and execute it. This model of ownership is also evident in discussions with facility managers and
other workers. They take explicit advantage of the education and experience levels of workers
when planning and executing work. They have an expert-based system. However, there exists a
strong cultural imperative for professionals to behave professionally. Interestingly, technical
knowledge alone is not sufficient qualification to run a project at Livermore. Principal
Investigators are also expected to demonstrate thorough knowledge and understanding of
laboratory standards and practices.
ATTRIBUTE 15: Work is conducted in accordance with agreed-upon work controls.
Evidence of Attribute: Consistent outcome of the work demonstrates that the work controls are
in place and are being followed. Self-assessments and independent assessments find few or no
nonconformances with agreed-upon work controls. Workers express confidence that work
controls are being followed.
Benefits of the Attribute: Conformance with agreed upon work controls provides managers and
workers with confidence that there is adequate protection against the hazards identified during
the work planning process and compliance with all applicable higher-level standards.
Field Examples of Attribute:
Rocky Flats. The documentation that results form the Activity Control Envelope (ACE) process
is a good example of how work is conducted according to agreed-upon work controls. The ACE
identifies the standards, constraints, hazards, and controls associated with a piece of work. It also
identifies such information as bounding conditions, task identification and flowcharts,
impediments to implementation, and readiness criteria. The ACE is developed by a trained
multi-disciplinary team. The ACE provides an analysis of a manageable scope of work, and
supports the timely development of complete work control documents.
Section 26
SRS. At DWPF, maintenance work packages are developed using multi-disciplinary teams
including ES&H, maintenance, operations, and engineering (when needed). The applicable
standards, procedures, and controls are identified and incorporated into the work package. There
is a review by the line organization after the work is completed to ensure the work was
performed in accordance with the work package instructions. The Wastewater Treatment Plant is
now using a new work control system that provides for effective integration of site safety
requirements and recognized industrial practices. The restructured work control system retains
safety effectivenss while significantly reducing administrative burdens and costs.
DOE G 450.3-2 31
February 1997
ATTRIBUTE 16: Performance of work is based on worker knowledge and ownership.
Evidence of Attribute: Workers and work teams are selected on the basis of their experience
and knowledge of the work. Line management discretion is allowed to determine when
procedures and other formal work controls are necessary for carrying out the work, and the
degree of rigor and detail needed in the procedures. Formal, documented work controls are
limited to work that is hazardous, complex, or unconventional.
Benefits of the Attribute: Limiting the use of rigorous, formal work controls to cases where
they are justified gives workers a broader scope for the exercise of their skills and judgment.
This extends their experience and capability to perform effectively. Line manager discretion in
matching work controls to the job improves efficiency.
Field Examples of Attribute:
Livermore. Project and administrative controls are designed with due consideration of the
education and experience levels of workers when planning and performing work. There is a
strong expectation that professionals will behave professionally, which in turn helps to motivate
workers. Livermore relies on the Principal Investigator to determine when a procedure is needed.
This reliance is evidence of the Principal Investigator’s knowledge of the work and those that
support the work; therefore they know best what work controls to put in place for optimal
performance and results. Where appropriate, as in the authorization of new experiments, formal
control media are used to complement expert knowledge in ensuring adherence to ES&H and
laboratory standards.
Nevada. Nevada has given considerable control to project managers in determining whether
detailed working procedures are needed for work activities. Throughout the N&S process,
Nevada kept a focus on implementation—using techniques such as process simplification to
decide how various processes should be administered and controlled.
PUREX. The work is performed by individuals who develop the work plan. Thus, worker
knowledge and ownership are inherent in the performance of the work.
ATTRIBUTE 17: A formal program of self-assessment supports organizational learning.
Evidence of Attribute: A formal self-assessment program exists. People who work in the areas
being assessed perform or assist in the performance of the assessments. The self-assessment
program includes both objectives and procedures for drawing lessons from the information
gathered during assessments (in addition to providing performance metrics). Self-assessment
reports are routinely reviewed by management and the conclusions documented. Management
follows up on decisions to correct deficiencies and improve performance. Internal findings of
deficiency and recommendations for improvement are resolved in a timely and effective manner.
External assessments generally result in neutral or positive findings. The number of negative
Section 27
32 DOE G 450.3-2
February 1997
findings from external assessments does not exceed the number of negative findings from self-
assessments.
Benefits of Attribute: Active and effective use of self-assessments by people who work in the
areas being assessed fosters ownership and self-improvement. Management interest in and use
of self-assessment findings stimulates a culture of continuous improvement and excellent
performance. Consistently good results from external assessments result in a reduced external
assessment burden.
Field Examples of Attributes:
Nevada. The new self-assessment plan being put in place in Nevada recognizes the importance
of self-assessment. The plan is that project managers will be incentivized to ask for assessment,
rather than having it forced on them. Assessors will be part of the project team which a project
manager assembles to do work. Self-assessment is being seen as a way to identify requirements
and enhance organizational learning, rather than as a punitive auditing activity. The Information
Services (IS) department, as example, has taken this to heart. They took a hard look at why
nobody came to them to do work and realized that their stovepiped organization made it
incredibly difficult for customers to deal with them. So, they adopted a commercial model,
assigned an account manager (who could cut across stovepipes to each customer) and started
concentrating on customer feedback, particularly on price and schedule. Customers, who had
been complaining for years and only using the department as a last resort, are now pleased. This
organization learned dramatically from its self-assessment.
SRS. Facility management (for example, DWPF) has learned through experience in the past few
years that achieving, demonstrating, and maintaining facility readiness to operate is dependent
upon having a knowledgeable and informed work force. Achieving this goal has been in large
measure due to introduction of a self-assessment strategy. Beginning with a formal process
known as RSA (Readiness Self-Assessment), the facility personnel assess themselves against a
standard set of requirements and expectations. Beyond this stage, regular self-assessments are
required. However, to strengthen the value and learning achieved in the assessment, facility
managers select the functional areas for assessment; this allows focused and productive use of
resources, while concentrating on areas needing strengthening. The results of these assessments
are fed directly back into the facility’s and site’s training and lessons learned programs. At the
same time, the number of external audits have been reduced, and a Facility Managers
Council—comprising senior facility managers’ has been given more responsibility for and
ownership of both performance and safety improvements and initiatives.
PUREX. At PUREX, the teamed approach to work planning resulted in identifying that the
principal hazards associated with maintenance work on an existing electrical connection box
came mainly from working on a ladder sixteen feet above the floor. The box was relocated (the
work was redesigned) to allow work at floor level, thus improving safety performance and,
probably, long term efficiency.
DOE G 450.3-2 33
February 1997
ATTRIBUTE 18: Assessment criteria are developed during work planning.
Section 28
Evidence of Attribute: Work plans or documents associated with the work plans contain clear
statements of the criteria by which performance will be measured against expectations. The
definition or description of the expectations, criteria, and (quantitative or qualitative) methods for
measuring performance are readily available to managers and workers responsible for conducting
the work.
Benefits of Attribute: Defining assessment criteria during work planning establishes
management expectations in the clearest possible form. This approach also contributes to
informed acceptance and accountability of managers and workers, both of which contribute to
improved performance.
Field Examples of Attribute:
Nevada. During the process of identifying standards for their work, the cross-functional
standards identification teams took additional steps to identify recommendations for
implementing the standards and to identify appropriate performance assessment criteria.
Identifying assessment criteria during work planning allowed Nevada to look ahead at
transitioning from the identification of standards to implementation of standards. Identifying the
assessment criteria during planning benefitted all involved: DOE and contractor personnel were
provided with the basis for new contractual agreements on performance; implementers and
assessors had opportunity to establish a balance between safety and efficiency, using the right
balance of performance measures and other indicators. Both DOE and contractor personnel
credit this early determination of performance measures as a key factor in increasing
productivity, morale, and cost effectiveness.
ATTRIBUTE 19: Assessment criteria are based on agreed-upon expectations.
Evidence of Attribute: Assessment criteria correspond directly with standards and expectations
established for the work. Personnel involved in selecting the standards, work planning, and work
performance recognize this correspondence. They can articulate how the assessment criteria
directly contribute to maintaining adherence to the standards and achieving the intended
outcomes. In turn, assessment findings focus on the safety, health, and environmental
consequences of inadequate standards or non-conformance with agreed-upon standards.
Assessment reports identify opportunities for improvement of performance in terms of improved
protection of workers, the public, and the environment. Sanctions are levied only against
systemic, repeated, or egregious non-conformance with agreed-upon standards, and are balanced
by explicit recognition of superior performance. Managers and workers recognize the
importance in providing a thorough and timely resolution of findings.
Benefits of Attribute: Assessment criteria based on agreements foster cooperation,
participation, and commitment. The participants in planning, performing, and assessing work are
seen by each other and see themselves as part of a team—as a community sharing a common
34 DOE G 450.3-2
February 1997
goal, with members contributing their particular expertise and experience toward achieving that
end. When findings are identified, they are respected by management and workers. They
challenge, but do not undermine, the feeling of ownership for the work and standards where it
exists. They encourage and support a collaborative effort to correct deficiencies and improve
performance, and provide a supportable basis for sanctions when ownership and a cooperative
effort to improve are not evident.
Section 29
Field Examples of Attribute:
Nevada. DOE and the contractor have defined assessment criteria related to the site’s key goal:
The need to bring new missions to Nevada. This has encouraged an intensive focus on
introducing commercial standards and practices, on focusing on outcomes rather than methods.
This change from a compliance oriented approach is captured in every stage: standards have
been selected to achieve a balance between safety and efficiency; implementation and assessment
strategies are considered during the planning stages to further support these objectives. The new
measures of success are based on agreed-to expectations and outcomes: bringing new missions as
a consequence of a significantly reduced overhead, an ability to perform safely and cost
effectively, and a flexibility to respond to the needs of new (potentially commercial) customers.
SRS. Assessment strategies for the Waste Water Treatment Facility were restructured to reflect
agreements that the plant should be measured against corporate and municipal standards.
Refocusing the assessment criteria encouraged appreciable changes: conduct of operations
standards were amended, the amount of documentation was reduced, cross training between
mechanics and operators was implemented, sampling frequencies were adjusted. Assessment
criteria now focus less on how things are accomplished (allowing significant cost savings), and
more on the expected outcome: a plant that conforms to and satisfies pertinent regulatory
standards while providing cost effective services to the site.
ATTRIBUTE 20: Cost effectiveness is one measure of performance.
Evidence of Attribute:
The cost of work, in terms of direct and indirect charges is both assessed and tracked. Managers
and workers contribute to a cost-effective balance among safety, economy and effectiveness in
the planning and conduct of work. Cost considerations of various options are assessed.
Appropriate measures and indicators are used for timely estimating, forecasting, capturing, and
tracking of costs. Agreed-upon goals are developed. Programs are in place to assess the costs
incurred, to compare them with the benchmarks, to make acceptable improvements, and to keep
workers informed of the status.
Benefits of Attribute: Confidence that all resources are effectively utilized helps to foster
organizational stability and provides an environment for effective short- and long-term planning.
Plans may be more meaningfully developed and credibly assessed or defended. Staffing levels
are defensible as necessary for the performance of work, and thus stabilized against non-
DOE G 450.3-2 35
February 1997
programmatic influences. Changes in staffing level are more easily planned and accommodated.
Opportunities for economies of scale are more readily identified and assessed. Decisions for
appropriate allocation of resources to eliminate/mitigate risk are better informed and an improved
basis for agreement on these decisions is obtained.
Field Examples of Attribute:
Nevada. DOE Nevada and Bechtel Nevada top management are promoting a new way of doing
business at Nevada. A key part of this new way of doing business is for the test site to begin to
consider itself as a player in the commercial arena. Commercial type success measures are being
encouraged. These include the amount of new work coming in, customer feedback, and, of
course, cost effectiveness. The Bechtel Nevada top manager gave all-hands talks to his personnel
to help convince them that their survival depended on these shifts to a more competitive way of
doing business.
Section 30
As an example of the change, Information Services (ADP support) has reorganized its services to
become more cost effective and customer oriented, resulting in cost efficiencies, productivity
improvements, more customers and better customer relations. Nevada is also moving to a
project manager organization, where a project manager is responsible for controlling all
resources for a project. Cost effectiveness is then applied as one of the performance criteria for
project managers.
Rocky Flats. Rocky Flats has been engaged in a benchmarking program to compare aspects of
their work with similar work performed elsewhere. A principal focus is to identify and introduce
more cost effective approaches to doing business.
ATTRIBUTE 21: Planning and performance of work are responsive to feedback.
Evidence of Attribute: Processes exist for analyzing feedback and for incorporating it as
lessons learned for future work planning and performance. When feedback is incorporated into
changes in work planning and performance, it is done in a timely manner. Initiators of feedback
express satisfaction with the responses. Workers can describe the feedback mechanisms they
employ or have available to them and can point to tangible examples of where their feedback has
resulted in changes to work planning and performance.
Benefits of Attribute: A process of continuous improvement is engendered: as worker
knowledge and experience increases, improvements are introduced throughout the spectrum of
planning and performance. Results are seen in more effective tailoring of work controls to the
work, the hazards, and the physical and human characteristics of the work environment. Workers
and supervisors develop a basis for enhanced understanding of efficient and effective work
practices. Line management is kept informed of the efficiency and effectiveness of mechanisms
they establish for the control of work. Worker pride and ownership are strengthened.
36 DOE G 450.3-2
February 1997
Field Examples of Attribute:
Nevada. Nevada is putting a new self-assessment plan in place. Self-assessment will be part of
a project manager's responsibilities. The new self-assessment plan will encourage managers to
ask for help rather than having auditing forced upon them. They view self-assessment as a way
to identify requirements for future work planning and work performance. Thus self-assessment
provides feedback. They also are quite aware of the need for feedback as they institute new
programs and plans. Both workers and management stated that they were still learning how to do
business differently, and that they had “to live it a few times” before anything became finalized.
Feedback from the various initiatives for change at Nevada was being assured by the use of the
same personnel for different initiatives. Feedback was given credit for helping the change
process along and promoting awareness.
PUREX. Mutual respect between the plant manager and the multi-disciplinary work planning
team was evident, thus supporting open communications. Feedback from the work planning
team was a primary resource for the design and development of the computer program used to
support work planning at the PUREX plant.
DOE G 450.3-2 37 (and 38)
February 1997
Attributes of Effective Implementation
1 Planning, performance, and assessment are focused on the work
2 ES&H standards are integrated with other expectations for the work
3 Line ownership of ES&H is evident
Section 31
4 Worker ownership, confidence, and job satisfaction are evident
5 DOE and contractor line management provide tangible evidence of commitment to
implementation of agreed-upon standards
6 Workers know and understand operational and strategic objectives
7 Management and workers promote compatibility between individual motives and institutional
norms
8 Workers have timely participation in work planning
9 Work planning is carried out with an integrated project approach
10 Work planning and work controls are based on collective knowledge
11 Information necessary for work planning and performance is reliable, readily available, and
communicated with appropriate tools & methods
12 Training and qualification of workers support reliance on judgement and expertise
13 Workers know, understand, and believe in agreed-upon standards
14 Managers do not allow worker ownership without informed acceptance
15 Work is conducted in accordance with agreed-upon work controls
16 Performance work is based on worker knowledge and ownership
17 A formal program of self-assessment support organizational learning
18 Assessment criteria are developed during work planning
19 Assessment criteria are based on agreed-upon expectations
20 Cost effectiveness is one measure of performance
21 Planning & performance of work are responsive to feedback
Cover
Executive Summary
Table of Contents
I. Introduction
II. Implementation
III. Attributes of Effective Implementation
IV. Attribute Descriptions
Attribute 1
Attribute 2
Attribute 3
Attribute 4
Attribute 5
Attribute 6
Attribute 7
Attribute 8
Attribute 9
Attribute 10
Attribute 11
Attribute 12
Attribute 13
Attribute 14
Attribute 15
Attribute 16
Attribute 17
Attribute 18
Attribute 19
Attribute 20
Attribute 21