Section 1
DISTRIBUTION: INITIATED BY:
All Departmental Elements Office of Environment, Safety and Health
DOE G 231.1-1
Approved: 08-20-03
OCCURRENCE REPORTING AND
PERFORMANCE ANALYSIS GUIDE
[This Guide describes suggested nonmandatory approaches for meeting requirements. Guides are not
requirements documents and are not to be construed as requirements in any audit or appraisal for
compliance with the parent Policy, Order, Notice, or Manual.]
U.S. DEPARTMENT OF ENERGY
Office of Environment, Safety and Health
Page ii DOE G 231.1-1
08-20-03
This page intentionally left blank.
DOE G 231.1-1 Page iii
08-20-03
CONTENTS
1. INTRODUCTION ...............................................................................................................1
2. OCCURRENCE REPORTING ...........................................................................................1
2.1 ORPS Security Requirements ..................................................................................1
2.2 Instructions on Reporting ........................................................................................1
3. PERFORMANCE ANALYSIS ...........................................................................................2
3.1 Background..............................................................................................................2
3.2 Performance Analysis Process.................................................................................2
3.3 ORPS Performance Analysis Model........................................................................2
Page iv DOE G 231.1-1
08-20-03
ATTACHMENTS
ATTACHMENT 1. Occurrence Reporting Fields
ATTACHMENT 2. ORPS Performance Analysis Model
ATTACHMENT 3. ORPS Performance Analysis Key Terms and Definitions
ATTACHMENT 4. ORPS Occurrence Report Elements and Element Grouping Guidance
ATTACHMENT 5. Guidance for Determination of an ORPS Recurring Problem
ATTACHMENT 6. ORPS Performance Analysis Analytical Techniques
ATTACHMENT 7. ORPS Performance Analysis Review Report Content
DOE G 231.1-1 Page 1
08-20-03
1. INTRODUCTION
This guide is meant to supplement DOE Manual 231.1-2, Occurrence Reporting and
Processing of Operations Information, dated 08-19-2003, by meeting identified needs for
added occurrence reporting guidance, clarification, or interpretations. This guide will be a
living document that will be expanded and updated as guidance needs are defined and can be
addressed.
For the first issuance of this guide, the two guidance areas addressed herein will consist of
defining ORPS reporting fields and also providing the methodology for the periodic review
of performance data to determine the presence of recurring events. After the redesigned
ORPS system is implemented in CY 2003, experience will undoubtedly identify the need for
further guidance. Self-assessments of the ORPS redesign will be made 90 days and six
months after implementation, and may become the first milestones for adding additional
guidance to this document.
2. OCCURRENCE REPORTING
Section 2
DOE M 231.1-2, Occurrence Reporting and Processing of Operations Information, sets forth
the minimum set of occurrence reporting requirements for Department of Energy (DOE)
Departmental Elements, including the National Nuclear Security Administration (NNSA),
and contractors responsible for the management and operation of DOE-owned and DOE-
leased facilities, including NNSA facilities. These requirements include categorizing
occurrences related to safety, environment, health, or operations (“Reportable Occurrences”);
notifying DOE of these occurrences; and developing and submitting documented follow-up
reports. The Manual further requires that the notifications be timely in accordance with the
significance of the occurrence, and that the written reports contain appropriate information
describing the occurrence, significance, causal factors, and corrective actions. This Guide
does not provide instructions on submitting Prompt Notifications. In addition, this Guide is
not applicable to occurrences resulting from activities with foreign involvement. In
accordance with DOE M 231.1-2, the following instructions apply to the reporting of
occurrences via hard copy or via the electronic database, the Occurrence Reporting and
Processing System (ORPS).
2.1 ORPS Security Requirements
All reports containing classified information, Unclassified Controlled Nuclear
Information (UCNI), or other controlled information must be submitted in hard copy
in accordance with established security requirements (see Chapter 7 in DOE M 231.1-
2). In addition, an unclassified version of the occurrence report that has been
sanitized of all controlled information must be entered into the ORPS database.
2.2 Instructions on Reporting
Attachment 1 lists all of the ORPS reportable fields. Those fields marked with an
asterisk (*) preceding them are required for all (notification, update, final, and short
Page 2 DOE G 231.1-1
08-20-03
form) reports. Fields marked with a pound sign (#) are required under certain
conditions, for example, depending on occurrence type, report type, or the answer to a
previous question.
Items 1 through 13, 16 though 20, 22, 23, 26 through 28, and 32 of the Occurrence
Report are required fields for the Notification Report, with some of these fields
computer generated. Short Form Reports require all of the Notification Report
required fields plus Item 35. In both the Notification Report and the Short Form
Report, additional fields may be required depending on the circumstances (e.g., Items
14 and 15). For all reports, data may be entered in the remaining fields when known.
For the Update and Final Reports, information on the Notification Report should be
retained and updated as better and additional information becomes available. The
Facility Representative and Program Manager may provide comments in Items 38
and 39, respectively, for all reports, except reports that have already been finalized
(which includes Short Form Reports).
3. PERFORMANCE ANALYSIS
3.1 Background
The analysis of occurrence-related data is necessary to ensure that recurring events
are identified, and, more importantly, that both DOE and DOE Contractors are
focused on analyzing events of lower significance to prevent more serious events
from occurring. This portion of the Guide was developed to provide an acceptable
approach for conducting performance analyses. Organizations should use this Guide,
existing internal processes, or a combination of the two in completion of their
analyses.
Section 3
3.2 Performance Analysis Process
A model for the performance analysis process is provided as Attachment 2. ORPS
Performance Analysis Key Terms and Definitions are provided in Attachment 3. The
model for performance analysis includes five basic steps: 1) gathering DOE ORPS
data and site-specific data for non-reportable events, as applicable, 2) reviewing
various elements and groupings of the data, 3) identifying potential areas of recurring
problems, 4) analyzing potential areas for recurrence, and 5) documenting the results
of the performance analysis activity, and, if any recurring problems are identified,
submitting an occurrence report into the DOE ORPS database. A description of each
of these steps is provided below.
3.3 ORPS Performance Analysis Model Description
3.3.1 The organization should identify all events as listed in the Occurrence
Reporting and Processing System (ORPS) for at least the previous one-year
DOE G 231.1-1 Page 3
08-20-03
period. Site-specific data for non-reportable events should also be used in the
analysis, as available.
3.3.2 ORPS reports should be searched and sorted based on a selected “grouping”
of elements (e.g., cause code, keyword, facility, etc). Attachment 4 lists
example groupings that can be used for specific types of analyses. The
organization determines which grouping (element or combination of elements)
should be used based on management direction, current status, or previous
analyses.
3.3.3 Results should be analyzed as a whole to determine if significant distributions
exist. These indicate potential areas of recurring problems (see Attachments 5
and 6). If none are noted, the search, sort, and analysis should be repeated on
the remaining groupings. The analysis should be repeated in this manner until
all desired sorts have been analyzed. If none exist, skip to 3.3.6.
3.3.4 Techniques, such as those found in Attachments 5 and 6, should be used to
determine if any recurring problems exist. These techniques typically involve
statistically significant trend analysis or an analysis of data distribution.
3.3.5 Problems identified as recurring should be processed according to DOE M
231.1-2 as a significance category “R” recurring problem. For recurring
events, the reporting organization should select the appropriate reporting
criteria associated with the recurring issue. If no specific reporting criteria
can be identified, the Reporting Criteria should be listed as Group 10, Criteria
#2 – an occurrence determined to be reportable by the Facility Manager.
3.3.6 The results of the Performance Analysis activity should be documented in a
Performance Analysis Report. See Attachment 7 for a recommended report
structure for reporting the results of the performance analysis activity.
DOE G 231.1-1 Attachment 1
08-20-03 Page 1
Attachment 1
Occurrence Reporting Fields
Field Name Instructions
Facility/Personnel Information
*1. Occurrence Report Number The occurrence report number is automatically generated by the
system. It consists of the following:
• DOE Field Office
• Area Office (if applicable)
• DOE contractor
• Facility
• Calendar Year the occurrence was first reported
• Sequential number of the occurrence by facility
Items are separated from each other by a dash.
A temporary number is assigned when a Notification Report is first
created. When the Notification Report is successfully transmitted, a
permanent number will be automatically generated by the ORPS
system, and may not be modified.
Section 4
*2. Facility Name Select the Facility Name from the drop-down menu. Note, only
facilities that you have authority with will show up in this drop-
down menu.
*3. Facility Function Code Select the Facility Function code from the drop-down menu that best
describes the activity/function performed at the facility selected.
Only one selection is allowed.
Facility Functions are listed below:
01 - Plutonium Processing and Handling
02 - SNM Storage
03 - Explosive
04 - Uranium Enrichment
05 - Uranium Conversion/Processing and Handling
06 - Irradiated Fissile Material Storage
07 - Reprocessing
08 - Nuclear Waste Operations/Disposal
09 - Tritium Activities
10 - Fusion Activities
11 - Environmental Restoration Operations
12 - Category "A" Reactors
13 - Category "B" Reactors
14 - Solar Activities
15 - Fossil and Petroleum Reserves
16 - Accelerators
17 - Laboratory (For search only)
17A - Laboratory - Analytical
17B - Laboratory - Research & Development
18 – Power Marketing Administration
99 - Balance-of-Plant (For search only)
99A - Balance-of-Plant - Offices
Attachment 1 DOE G 231.1-1
Page 2 08-20-03
Field Name Instructions
99B - Balance-of-Plant - Machine shops
99C - Balance-of-Plant - Site/outside utilities
99D - Balance-of-Plant - Safeguards/security
99E - Balance-of-Plant - Storage (except SNM)
99F - Balance-of-Plant - Laundries
99G - Balance of Plant - Infrastructure (Other Functions not
specifically listed in this Category)
*4. Site Name This field is automatically generated by the system, and indicates the
logged users' site. This field may not be modified.
*5. Manager/Designee Enter the name, title, and phone number of the responsible facility
manager or designee who approved this report, either by personally
transmitting the electronic report or by signing the hard copy report.
By selecting a facility manager name from the drop-down menu, the
title and phone number fields will be filled in automatically, but may
be overridden if necessary. Only Facility Managers that are
registered ORPS users will appear in the drop down menu. If the
appropriate facility manager's name does not appear in the list, you
may alternatively enter a name in the input box next to the drop-
down menu. You will also have to fill in the phone number and title
as well. A selection made from the drop-down menu will override
any information entered in the input box.
This field is required for all reports.
*6. Manager Phone Enter a telephone number, including area code, for this person.
Telephone number format is AAAPPPNNNN, where AAA is the
area code, PPP is the prefix, and NNNN is the number. Any amount
of punctuation may be included in any way desired, as long as 10
numeric digits are included and the field does not exceed 15
characters in total length. Phone numbers are displayed as (AAA)
PPP-NNNN.
Example: 208/555-1212 --> (208) 555-1212
This field is required for all reports.
*7. Job Title Enter the specific job title of the Manager/Designee.
*8. Originator/Transmitter This field is automatically generated by the system, and displays the
user ID of the logged in user.
*9. Originator Phone This field is automatically generated by the system, and displays the
telephone number of the logged in user.
*10. Originator/Title This field is automatically generated by the system, and displays the
title of the logged in user.
*11. Division/Project Identify the project or the contractor organization responsible for the
facility at which the occurrence took place.
This field is required for all reports.
Section 5
*12. Secretarial Office Select the DOE Secretarial/Power Administration Office to which
this facility is operationally responsible from the drop-down menu.
BV – Bonneville Power Administration
EE - Energy Efficiency and Renewable Energy
EH - Environment, Safety & Health
EI - Energy Information Administration
EM - Environmental Management
FE - Fossil Energy
ME – Management, Budget and Evaluation
NA – National Nuclear Security Administration
DOE G 231.1-1 Attachment 1
08-20-03 Page 3
Field Name Instructions
NE - Nuclear Energy, Science and Technology
NP - New Production Reactor (no new reports)
RW - Civilian Radioactive Waste Management
SC - Science
SE – Southeastern Power Administration
SO - Security
SW – Southwestern Power Administration
UE - Uranium Enrichment (no new reports)
WA – Western Area Power Administration
Only one Secretarial Office/Power Administration may be selected.
If the facility is operationally responsible to more than one
Secretarial Office, enter the Secretarial Office that is most directly
involved in the specific work activity during which the occurrence
took place. This field is required for all reports.
*13. System/Building/Equipment Identify all systems, equipment, or structural items involved in the
occurrence, as applicable. In addition, in the case of component
failures or defective parts or materials, provide such information as
the manufacturer, model number, and size. The most significant
item(s) should be listed here. Additional information can be
provided in the Description of Occurrence.
#14. Authorized Classifier/
Reviewing Official
Enter the name of the authorized classifier who reviewed this report
and determined that it was unclassified, or the name of the reviewing
official who determined that there was no Unclassified Controlled
Nuclear Information (UCNI) or other controlled information
included in the report. Classified, UCNI, and controlled information
MUST NOT be transmitted to ORPS. For reports containing
classified, UCNI, or controlled information, a sanitized version of
the report shall be submitted to ORPS.
For facilities where classified operations are conducted, classified
information is generated, or UCNI or other controlled information is
available, this field is required for all reports.
#15. Classification Date Enter the date when the authorized classifier or reviewing official
reviewed this report and determined that it was appropriate for entry
into ORPS.
The date must be entered in MM/DD/YYYY format. If the date is
entered in MM/DD/YY format, you will receive an error message.
Examples:
06/03/1996, not June 3, 1996
For facilities where classified operations are conducted, classified
information is generated, or UCNI or other controlled information is
available, this field is required for all reports.
*16. UCNI When required and when appropriate UCNI guidance is available, a
reviewing official needs to make a final determination that the report
contains (enter "Y" for Yes) or does not contain (enter "N" for No)
UCNI. Where appropriate guidance is not available, a reviewing
official should make a preliminary review determination that the
report may contain UCNI (enter "Y" for Yes) or does not contain
UCNI (enter "N" for No). Reports with UCNI = Y can not be
transmitted to the database.
*17. Plant Area Indicate the name of the site-specific plant area (e.g., F-Area, M-
Area) where the occurrence took place. This field is required for all
Attachment 1 DOE G 231.1-1
Page 4 08-20-03
Section 6
Field Name Instructions
reports.
Important Date and Time Information
*18. Discovered Date/Time Enter the date and time when the facility staff discovered the event
or condition being reported. Date format is MM/DD/YYYY.
Example: June 3, 1996 --> 06/03/1996
The time format is military time: hhmm, with midnight represented
as 0000 on the second day.
Examples:
6:30 AM - 0630
6:30 PM - 1830
These fields are required for all reports.
*19. Categorized Date/Time Enter the date and time when the Facility Manager determined that
the event or condition constituted a Reportable Occurrence and
determined its category (Significance Category OE or 1-4). Date
format is MM/DD/YYYY.
Example: June 3, 1996 --> 06/03/1996
The time format is military time: hhmm, with midnight represented
as 0000 on the second day.
Examples:
6:30 AM - 0630
6:30 PM - 1830
These fields are required for all reports.
Occurrence Description
*20. Subject/Title of Occurrence Enter a brief title or description (140 characters or less) that best
details the nature, cause, and result of the occurrence. This field is
required for all reports.
*21. Reporting Criteria
Select one or more Reporting Criterion/Criteria as discussed in
Section 6 of DOE Manual 231.1-2. All of the specific reporting
criteria applicable for an occurrence should be identified.
NOTE: The Significance Category field will contain the highest
significance category associated with the selected criteria. For
example, if criteria with significance categories 4, 3, and 1 were
selected, then the significance category would be 1.
*22. Significance Category This field is automatically assigned by the system and is dependent
on the Reporting Criterion/Criteria. Significance Categories include
OE (emergency), 1, R, 2, 3, and 4, with OE being the most
significant and 4 the least significant. The Significance Categories
are defined as follows:
Category OE: Operational Emergency Occurrences are the most
serious occurrences and require an increased alert status for onsite
personnel and, in specified cases, for offsite authorities.
Category 1: Occurrences in this category are those that are not
Operational Emergencies and that have a significant impact on safe
facility operations, worker or public safety and health, regulatory
compliance, or public/business interests
Category R: Occurrences in this category are those identified as
recurring, as determined from the periodic performance analysis of
occurrences across a site.
DOE G 231.1-1 Attachment 1
08-20-03 Page 5
Field Name Instructions
Category 2: Occurrences in this category are those that are not
Operational Emergencies and that have a moderate impact on safe
facility operations, worker or public safety and health, regulatory
compliance, or public/business interests.
Category 3: Occurrences in this category are those that are not
Operational Emergencies and that have a minor impact on safe
facility operations, worker or public safety and health, regulatory
compliance, or public/business interests.
Category 4: Occurrences in this category are those that are not
Operational Emergencies and that have some impact on safe facility
operations, worker or public safety and health, public/business
interests.
23. Recurring Event If this is a recurring event, check this box. Otherwise leave it blank.
When this box is checked, the significance category will be set to
“R” automatically regardless of what significance category is
derived from the selected reportable criteria.
Section 7
*24. Subcontractor Involved If a subcontractor is involved in this occurrence, choose Yes.
Otherwise choose No. If Yes is selected, enter the name of the
subcontractor(s). This field is required for all reports.
*25. Description of Occurrence The following instructions should be followed when entering the
description of the occurrence:
a. The first paragraph of the Occurrence Description should relay
the essential nature of the event (i.e., a summary of the
occurrence in newspaper style).
b. All information should be clear and succinct. Avoid redundant
and unnecessary text, and lengthy “log book” accounts, unless a
discussion of the event in chronological order is considered
essential to understanding the event.
c. Complex and more significant occurrences should warrant a
greater level of detail. Significance Category 4 occurrences
would likely need only a short paragraph under Occurrence
Description. However, all reports should present enough
information so that the general reader understands why the event
needs to be reported and what the effect is.
d. Avoid jargon and uncommon or site/facility-specific
abbreviations and acronyms. If used, acronyms should be
initially spelled out.
e. Unless necessary to record and explain the event (e.g.,
suspect/counterfeit items or material), use general descriptions
of equipment, procedures, etc., rather than presenting lengthy
detailed titles and the numbers and letters assigned to those
items.
f. Quantify the level of contamination, dose, release, and damage
(e.g., estimate the acres of wild land burned) when possible,
Attachment 1 DOE G 231.1-1
Page 6 08-20-03
Field Name Instructions
instead of merely stating a reportable limit was exceeded.
g. Use active rather than passive voice whenever possible. For
example, write, “the electrician severed the conduit” rather than
“the conduit was severed.”
The type of information to be provided in the description includes,
but is not limited to, the following:
• The method of discovery;
• Any component failures and the failure mode;
• Any personnel errors involved, including the type and
result of the error;
• Any procedural problem encountered;
• The response of any automatic or manual safety systems
and the signals which initiated and terminated their
operation;
• The duration of any failures;
• Operator actions that affected the course of events; and
• The loss of any safety equipment.
When appropriate for clarification, photos, sketches, and drawings
should be maintained with the occurrence report record. In addition,
sites are encouraged but not required to make photos, sketches, and
drawings available via a Web page, with the Web page address
included as a hyperlink in the ORPS report.
For recurring events, include all pertinent information to describe
how the event was determined to be recurring.
This field is required for all reports.
Notifications Made
#26. DOE HQ OC Notifications Enter the date and time when the DOE HQ Operations Center was
notified and the name and organization of the person notified. Date
format is MM/DD/YYYY.
Example: June 3, 1996 --> 06/03/1996
The time format is military time: hhmm, with midnight represented
as 0000 on the second day.
Examples:
6:30 AM - 0630
6:30 PM - 1830
These fields are required for all reports that are categorized as
Operational Emergencies and Significance Category 1 occurrences.
The field is also required for Significance Category 2 occurrences as
directed by the Field Office. In addition, the field is required for
specific Significance Category 2, 3, and 4 occurrences identified
Section 8
DOE G 231.1-1 Attachment 1
08-20-03 Page 7
Field Name Instructions
with an asterisk next to the reporting criterion.
#27. Other Notifications Enter the dates(s) and time(s) of notification of state and local
officials or other agencies and the name(s) and organization(s) of the
individual(s) notified. Additional information can be provided in the
Immediate Actions Taken field. Date format is MM/DD/YYYY.
Example: June 3, 1996 --> 06/03/1996
The time format is military time: hhmm, with midnight represented
as 0000 on the second day.
Examples:
6:30 AM - 0630
6:30 PM - 1830
Facility Information at Time of Occurrence
*28. Operating Conditions Describe the operational status of the facility or equipment at the
time of the occurrence including, for example, pertinent
temperatures, pressures, or other parameters necessary for evaluation
of the occurrence and its consequences. If said information is not
applicable, enter "Does not apply". This field is required for all
reports.
*29. Activity Category Select the activity that best describes the ongoing activity at the time
of the occurrence. This field is required for all reports.
01 - Construction
02 - Maintenance
03 - Normal Operations (other than Activities specifically listed in
this Category)
04 - Start-up
05 - Shutdown
06 - Facility/System/Equipment Testing
07 - Training
08 - Transportation (For search only)
08A - Transportation Onsite
08B - Transportation Offsite
09 - Emergency Response
10 - Inspection/Monitoring
11 - Facility Decontamination/Decommissioning
12 - Research
*30. Immediate Actions Taken Describe the immediate or remedial actions taken to return the
facility, system, or equipment item to service; to correct or alleviate
the anomalous condition; and to record the results of those actions.
These may include temporary measures to keep the facility in a safe
standby condition or to permit continued operation of the facility
without compromising safety until a more thorough investigation or
permanent solution can be affected. This field is required for all
reports.
Cause Information
#31. Causes Select all of the codes from the Causal Analysis Tree that best
represent the causes of the occurrence. If you select A3 (Human
Factors) as the Cause Code, select any associated causes (couplets)
from the couplet selection list or choose a better couplet for the
associated occurrence. This field is required for Final reports and
optional for Short Form Reports.
#32. Description of Cause Discuss the causes of the occurrence to include all causes and the
Attachment 1 DOE G 231.1-1
Page 8 08-20-03
Field Name Instructions
corrective actions identified, including causal analysis contributing
to a recurring event. Do not repeat a description of the occurrence,
but discuss the results of the causal analysis. The root cause analysis
methodology used should be identified. A detailed description of the
corrective actions is required to demonstrate that the identified
actions will adequately address the cause(s) of the problem. This
field is required for all Final reports, except Short Form Reports.
Evaluations
#33. Evaluation by Facility
Manager
With the information available, the Facility Manager should provide
his or her evaluation of the occurrence and its effect or possible
effect on the plant, system, program, etc. The Facility Manager may
later supplement this evaluation with additional entries in Update
reports or in the Update/Final report. This field is required for all
Notification reports where "Further Evaluation Required" is "Yes"
and "Before Further Operation" is "Yes". It is also required for all
Update and Final reports, but it is optional for Short Form Reports.
Section 9
*34. Further Evaluation
Required
If this occurrence will require further evaluation, choose “Yes”.
Otherwise choose “No”. For Cancelled and Update/Final Reports,
"Further Evaluation Required" should be "No". This field is
required for Notification, Update, Final, and Short Form Reports.
If further evaluation is required, specify if this occurrence will
require further evaluation before further operation. For Cancelled
and Update/Final Reports, "Before Further Operation?" should be
"No". This field is required for all reports where "Further Evaluation
Required" is "Yes".
If further evaluation is required before further operation, enter the
name of the person who will perform further evaluation on this
occurrence and the date when the further evaluation will be
completed. Date format is MM/DD/YYYY.
Example: June 3, 1996 --> 06/03/1996
These fields are required for all reports where "Further Evaluation
Required" is "Yes" and "Before Further Operation" is "Yes".
Deficiencies, Lessons Learned, and Corrective Actions
#35. Integrated Safety
Management (ISM)
Enter one or more ISM codes from the following list to identify an
observed weakness(es) in the facility's implementation of the ISM
program (e.g., failure to properly define the work scope, or failure to
perform an adequate activity level hazards analysis).
Available ISM codes are:
1 – Define Scope of Work - Missions are translated into work,
expectations are set, tasks are identified and prioritized, and
resources are allocated.
2 – Analyze the Hazards - Hazards are associated with the work
identified, analyzed, and categorized.
3 – Develop and Implement Hazard Controls - Applicable standards
and requirements are identified and agreed-upon, controls to
prevent/mitigate hazards are identified, the safety envelope is
established, and controls are implemented.
4 – Perform Work Within Controls - Readiness is confirmed and
work is performed safely.
5 – Provide Feedback and Continuous Improvement - Feedback
DOE G 231.1-1 Attachment 1
08-20-03 Page 9
Field Name Instructions
information on the adequacy of controls is gathered,
opportunities for improving the definition and planning of work
are identified and implemented, line and independent oversight
is conducted, and, if necessary, regulatory enforcement actions
occur.
6 – N/A (Not applicable to ISM Core Functions as determined by
management review) - Items that do not fall into the realm of
ISM Core Functions; e.g., Natural Phenomena, Wild Fires,
Counterfeit/Suspect Parts, Notifications of non-compliance
(Federal, State, Local), Legacy Issues that could not have been
anticipated, End of Life equipment failures where maintenance
is not an issue, etc.
This field is required for all Final reports, including Short Form
Reports.
#36. Lessons Learned Describe what lessons can be learned from this occurrence, in order
to help prevent similar events from happening.
This field is required for Final reports and optional for Short Form
Reports.
#37. Similar Occurrence Reports Indicate by their report numbers any similar occurrence(s) of which
you are aware for this facility or other facilities, including similar
occurrences contributing to a recurring event. A discussion
describing the analysis of similar occurrence reports should be
included in Field 30 or Field 31, as appropriate. Also, identify any
known commercial reactor Licensee Event Reports (LER) or other
related documents that describe similar occurrences. The purpose of
this item is to identify, if recognized, occurrences that might suggest
a generic problem. It also serves to identify generic problems that
may result in single or common lessons learned.
This field is required for Final reports and optional for Short Form
Reports.
Section 10
#38. User Defined Fields (two of
them)
These optional fields can be used to store facility-specific
information (e.g., a cross-reference to performance indicator data or
a site-specific number or name). They cannot exceed 124 characters
in length for each field.
#39. Corrective Actions A facility may choose to use ORPS or its own local corrective action
system to track and close out corrective actions (CA). However, in
either case, enter a complete description of the CA and the target
date when completion of the CA is anticipated. A complete list of
corrective actions should be included in the report to ensure it can
stand on its own (i.e., reviewers do not have to search for other
reports, etc). For facilities using ORPS to track and closeout the
corrective actions, the Actual Completion date is entered when the
CA is completed and closed. For facilities that choose to use their
local CA tracking systems, the Actual Completion Date is not
required. However, the reference number of the CA stored in the
local corrective action tracking system needs to be entered. All CA
items entered in ORPS with local CA reference numbers are
considered closed.
Corrective Actions are required for Final reports and optional for
Short Form Reports.
Line Management Comments
#40. Facility Representative The Facility Representative or designee can provide his or her
Attachment 1 DOE G 231.1-1
Page 10 08-20-03
Field Name Instructions
Comments evaluation of the occurrence, including an evaluation of the initial
and proposed corrective actions and any follow-up by the facility
personnel, and can describe any other actions that DOE has taken
since the occurrence. The Facility Representative may supplement
such information with subsequent additional entries, as appropriate.
After completing the input, the Facility Representative’s name and
date will be automatically entered by ORPS. If a Final Report is
being rejected, the Facility Representative should use this space to
indicate why.
This field is optional on all occurrence report types except for
reports that are already Final, including Short Form Reports. This
field is required only on Final Reports rejected by the Facility
Representative.
#41. Program Manager
Comments
The Program Manager or designee can provide his or her evaluation
of the occurrence, including an evaluation of the initial and proposed
corrective actions and any follow-up, and can describe any other
actions that DOE has taken since the occurrence. The Program
Manager may include additional information, as appropriate. After
completing the input, the Program Manager’s name and date will be
automatically entered by ORPS. If a Final Report is being rejected,
the Program Manager should use this space to indicate why.
This field is optional on all occurrence report types except for
reports that are already Final, including Short Form Reports. This
field is required only on Final Reports rejected by the Program
Manager.
DOE G 231.1-1 Attachment 2
08-20-03 Page 1
Attachment 2
ORPS Performance Analysis Model
Re
ORPS
Database
Site-Specific
Non-ORPS
portable
Event Data
Analyze for
Recurring
Problems (Att 5&6)
Is there a
recurring
problem?
Document
Performance
Analysis
Activity
Yes
No
End
Identify Potential
Areas of Recurring
Problems using
Criteria in
Attachments 5 & 6
Review Occurrence
Elements vs.
Defined
Groupings
(See Attachment 4)
Initiate Separate
New Recurring
Sig. Cat. R
ORPS Report
Section 11
DOE G 231.1-1 Attachment 3
08-20-03 Page 1
Attachment 3
ORPS Performance Analysis Key Terms and Definitions
The definitions and terms listed below are commonly used when performing an ORPS Performance
Analysis and are used throughout this Guide.
Couplet – The result of an analysis of a “human performance problem” (A3 node on the Causal
Analysis Tree) and the appropriate apparent causes from other nodes in the Causal Analysis Tree
that may have led to the human performance problem. Each applicable cause code from the other
nodes is combined with the A3 node to form a couplet. A list of predetermined potential associated
couplets is shown in the Causal Analysis Guide.
Elements – Data fields included in ORPS reports that provide fundamental specific pieces of
information related to each individual occurrence. Some specific elements are shown in Attachment
4.
Groupings – Selected elements on which data searches and sorts are performed. Groupings can be
made up of one or more elements.
DOE G 231.1-1 Attachment 4
08-20-03 Page 1
Attachment 4
ORPS Occurrence Report Element Grouping Guidance
1.0 Element Groupings
Elements can be grouped in any way to suit the Performance Analysis process. The ORPS data
elements can be grouped in certain ways to determine typical parameters useful in the analysis.
These are:
¾ WHO’s involved
¾ WHAT happened
¾ WHERE did it happen
¾ WHEN did it happen
¾ HOW did it happen
The following list provides guidance on how to determine important combination of elements for
analysis.
¾ WHO was involved?
1. Facility
2. Site
3. PSO
4. Contractor
5. Keywords to describe work groups, etc.
¾ WHAT happened?
1. Reporting Criterion/Criteria
2. Significance Category
3. Keywords to describe additional detail
¾ WHERE/WHEN did it happen?
1. Date/Time of Discovery/Categorization
2. Facility
3. Facility Function
4. Keywords to describe systems, components, etc.
¾ HOW did it happen?
1. Cause Code
2. If Human Performance is involved, then include the associated cause code couplet
3. Keywords to describe additional details
4. ISM function(s)
Attachment 4 DOE G 231.1-1
Page 2 08-20-03
2.0 Guidance on How to Determine Major Contributors
The number of combinations of all the ORPS data elements (including keywords) is several
thousand. Doing a Pareto analysis of the data can provide a useful tool to determine what
combination of the above data elements needs to be considered for further analysis. While the
details on how to perform a Pareto Analysis will differ depending on the specific application, there
are some general industry concepts that can be followed for analyzing this type of data.
Since the main goal of the ORPS Performance Analysis is to define recurring events, the following
sequence below is suggested for completing the analysis:
A. Define the grouping of data elements to be used for further analysis, for example:
Personnel Injuries (Reporting Criterion/Criteria xx) – due to (Cause Code yy) – in (Facility
zz)
•
•
•
•
Contamination cases (Reporting Criterion/Criteria xx)
Procedure errors (Cause Code nn) resulting in Lockout/Tagout issue (Reporting
Criterion/Criteria xx)
Diesel failures (Keyword nn) due to improper maintenance (Cause Code yy)
B. Search, sort, and analyze the grouping of data elements as follows:
1. Review the elements associated with WHAT happened individually.
♦ The Reporting Criterion/Criteria can be reviewed at either the ORPS Category Groups (1-
Section 12
10) level or the specific criterion level within each group and subgroup, depending on the
number of reports in the specific time period.
2. Take the major contributors from the above and do a cross cutting or drill down against the
other types of data. For example, if the majority of events were reported using the Reporting
Criterion/Criteria of Group 2, then look at all the Group 2 data combined with various Who’s
involved (facility), etc.
♦ This type of review can yield typically three types of results:
a) Results for which there is a significant contributor that can be explained or that
cannot be explained. For instance, having a large percentage Lockout/Tagout events
associated with the ISM code for “Perform Work” is to be expected, whereas a large
percentage of Lockout/Tagout events associated with a cause dealing with inadequate
supervision would be of interest.
b) Results for which there is no significant contributor but the results indicate that the
events have a potential cross cutting issue. For example, Transportation issues are
being evaluated and reviewed against WHERE/WHEN they occurred. While no
particular facility, time, or date may be dominant (WHERE/WHEN), it was noted,
however, that the majority of the facilities had a large concentration of a certain type
of issues (or HOWs), indicating a potential cross cutting pattern.
c) Results for which no patterns are revealed.
DOE G 231.1-1 Attachment 4
08-20-03 Page 3
3. It is recommended that the analyst repeat step 2 comparing the top contributor against yet
another data element.
♦ This provides additional review of the data. Typically this would answer the
question of Transportation Events – Involving Facility xyz – having a Cause
Code of YYY.
4. If the data warrants, repeat step 3 for another level of review.
5. Repeat steps 1-4 but start with a different group of the data elements to the extent that the
data sample can support the analysis. The key to this part of the review is to start with the
Cause Code and then review that against other data elements.
Notes: - Any common spreadsheet software and/or database software makes this analysis
straightforward.
- The reliability of the review results is dependent on the number of events being
considered.
DOE G 231.1-1 Attachment 5
08-20-03 Page 1
Attachment 5
Criteria to be Used in the Determination of an ORPS Recurring Problem
There will be few cases where it will be obvious that a series of events are recurring. Typically each
event is a little bit different; therefore, this guidance is provided to apply judgment that is uniform
across the complex.
There is one group of events that is straightforward. That is events similar to previous significant
category 1 or 2 events where the completed actions to prevent recurrence have failed. An example
would be: one year ago a category 2 contamination (personnel uptake) occurred. One of the
corrective actions to prevent recurrence was an upgraded procedure and associated training to limit
access to a specific area of a facility. This corrective action was completed and verified four months
earlier. During this ORPS Performance Analysis review period, another personnel uptake occurred
that was caused by the employee/supervision not using the updated procedure. This would be a
recurring event.
Section 13
A second group is much less straightforward. This consists of a series of Significance Category 3 or
4 events. The action is to take the results from the analysis and make a determination if this series of
events constitutes a recurring problem. If so, then it would be reported as a separate occurrence (R)
in ORPS.
The following are questions that should be considered as indicators or contributing attributes
to a recurring event.
• Did the trending data for the series/group of events indicate a significant negative trend?
• Were there a significant number or percentage of implementation failures discovered to
indicate that one or more components of the program were not effective in ensuring
successful completion of the task or activity?
• Have multiple control failures within the boundaries of a single occurrence taken place
indicating a common breakdown in a program or area of a program?
• Have small and apparently isolated series/groups of events been seen within various aspects
of an overall program that collectively indicate a program weakness when viewed from a site
perspective?
• Have failures been discovered that indicate during implementation of a particular program, or
portion of a program, that one or more components of the program were not effective in
ensuring successful completion of the task or activity?
• Was there a common underlying cause or weakness in controls that necessitated corrective
actions?
• Did the group of related events indicate a series of common work process breakdowns or a
series of common quality criteria issues?
Attachment 5 DOE G 231.1-1
Page 2 08-20-03
• Did related series/groups of events breach multiple, but not necessarily all, barriers protecting
workers, the public, or the environment from potential or actual adverse impacts of an event?
• Did related series/groups of events, having the same underlying cause or having contributed
to or were the unavoidable consequence of the underlying problem, occur within a single
facility or operation?
• Did a causal factor of the series/group of events indicate a lack of management involvement,
or breakdown in management controls, or errors in decisions/directions by managers that
resulted in systemic problems or violation of safety rules?
DOE G 231.1-1 Attachment 6
08-20-03 Page 1
Attachment 6
ORPS Performance Analysis Analytical Techniques
The goal of the Performance Analysis is to determine if there are recurring events that need to be
addressed collectively in order to preclude more serious events from occurring. The techniques
shown below provide a framework to assist in making this determination. While there are many
ways that the data can be analyzed, the techniques below coupled with other site-specific processes
can be used to support the analysis activity. The techniques include:
1. Statistical Analysis.
Statistical analysis is a powerful tool for analyzing the data to determine statistically significant
trends (SST) both positive and negative. The use of control charts can show if the process is
‘controlled’ so that overreaction to single events can be avoided.
The use of control charts and their generation are described in many references and are outside
the scope of this attachment. Likewise, the criteria for a statistically significant trend are well
documented (for examples, refer to the work of either Lloyd Nelson or W. Edward Deming).
Section 14
The use of a statistical analysis is best suited for those processes where there is an adequate
number of events for each time period being considered and data is available for the last 12
months. If the mean of the number of events per time period is 5 or greater, the tests for
statistical significance are meaningful. If the mean is between 2 and 5 events per time period,
the statistical tests should be viewed as only a potential indicator. If the mean is below 2
events, control charts have little value in determining trends. Since control charts are being
used to define statistical trends, there needs to be adequate data collected. Also, since many
trends take several time periods to be revealed, the data should represent an extended period of
time
2. Distribution / Cross Cutting Issues / Drill Down
These terms all relate to looking at various combinations of the source data to determine if
patterns emerge. Typically, the use of Pareto analysis can determine the major contributions
and the distribution of the contributors.
A limitation of this technique is that it needs to have a large enough data sample to allow for a
meaningful analysis.
In cases where the cause of a problem involves human performance, it is necessary to examine
additional data (couplets) to determine what caused the human performance problem.
3. Causal Analysis
The same techniques that are used to define the “Cause” for a single event can be used similarly for
groupings of events, such as when several dissimilar events have the same “Cause.” This “Cause”
Attachment 6 DOE G 231.1-1
Page 2 08-20-03
recurrence then becomes the problem being considered and the analysis is directed as to why the
identified set of cause codes continued to appear.
DOE G 231.1-1 Attachment 7
08-20-03 Page 1
Attachment 7
Typical ORPS Performance Analysis Review Report Structure
The Performance Analysis Report should contain the following information:
1. Executive Summary of Analysis Results
2. Background
Time period of data used in the analysis •
•
•
•
•
•
•
•
Quantification of Events included in the analysis
3. Analysis
Identification of Repetitive Groupings/Elements used to determine potential recurring
problems
Elements with a large concentration when compared to all others (list these elements, if
any)
Elements with a large concentration when compared to all others that were analyzed for
recurring problems (list these elements, if any)
4. Conclusion
Identify New ORPS reports generated as a result of the review
Identify any referenced ORPS reports used in determining your conclusions
Include a conclusion statement that no recurring problems were noted, if appropriate
DOE G 231.1-1
CONTENTS
ATTACHMENTS
INTRODUCTION
Attachment 1
Occurrence Reporting Fields
Facility/Personnel Information
Important Date and Time Information
Occurrence Description
Notifications Made
Facility Information at Time of Occurrence
Cause Information
Evaluations
Deficiencies, Lessons Learned, and Corrective Actions
Line Management Comments
ORPS Performance Analysis Model
Attachment 3
ORPS Performance Analysis Key Terms and Definitions
Attachment 4
ORPS Occurrence Report Element Grouping Guidance
Attachment 5
Criteria to be Used in the Determination of an ORPS Recurring Problem
Attachment 6
ORPS Performance Analysis Analytical Techniques
Attachment 7
Typical ORPS Performance Analysis Review Report Structure