DOE O 1323.4C, Weekly Report to the Secretary
Functional areas: Management
the order outlines procedures for submitting reports to the Secretary. Cancels DOE 1323.4B. Canceled by DOE 1321.139
Superseded By:
DOE N 1321.139, Cancellation of Directives on Mar 25, 1994
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE N 1321.139Cancellation of Directives (Mar 25, 1994)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
c
(
0
0
· U.S. Department of Energy ORDER
Washington, D.C. I DOE 1323.4C
4-24-87
SUBJECT: WEEKLY REPORT TO THE SECRETARY
1. PURPOSE. To outline the procedures for submitting reports to inform the
Secretary of major events occurring, or major actions taken, within the
Department of Energy (DOE).
2. CANCELLATION. DOE 1323.4B, WEEKLY REPORT TO THE SECRETARY, of 4-3-85.
3. REFERENCE. DOE 1325.1A, CORRESPONDENCE MANUAL, of 6-18-81, which outlines
the standard procedures for processing correspondence within the Department.
4. OBJECTIVE. A weekly report shall be used to inform the Secretary of major
events and developments within the Department. The Weekly Report to the
Secretary is dn excellent and timely vehicle for communicating matters of
importance to senior levels within the Department.
5. REPORT CONTENTS.
a. Contents. Reports shall be limited to major accomplishments and topics
of significant interest such as the following:
(1) Accomplishments:
(a) Scientific breakthroughs;
(b) Startup or completion of a major facility;
(c) Completion of an engineering or safety test;
(d) Completion of Environmental Impact Statements;
(e) Elimination of major regulations;
(f) International agreements; and
{g) Major management actions.
(2) Topics of Significant Interest:
(a) Program decisions;
(b) Studies;
DISTRIBUTION:
All Departmental Elements
INITIATED BY:
Office of the Executive
Secretariat
2
(c) Reports;
(d) Meetings; and
(e) Visits.
L ~E 13,23.4C
~24-87
b. General. The following general information, when applicable, shall be
included for each reported event and accomplishment:
(1) Date started;
(2) Date completed; and
(3) Location of event.
6. FORMAT AND COPY REQUIREMENTS.
a. General. The following format and copy requirements apply to the prepa
raflon of the weekly reports to the Secretary.
(1) Type the report on plain bond paper, block style typing, with
capitalized and underlined headings. Reports should utilize lead-in
headings. Forward reports using standard transmittal procedures.
telephone number of the person from whom additional information may . .
(2) After each item include in parentheses the name, routing symbol, and J
be obtained.
(3) Reports shall be prepared in the format shown in Attachment 1, and
written in a style that is concise, logical, and understandable to
those without specific technical background. Discussions should be
factual and reach a "bottom-line" conclusion.
(4) Headquarters organizations shall submit original reports with two
copies. Field organizations shall use telecommunications to transmit
reports. All transmittals are to be addressed to the Secretary and
are to be submitted to the Office of the Executive Secretariat.
b. Exception. The following format as shown in Attachment 2 is for electr0nic
mail system users as the software used for the electronic mail system dc•es
not permit underlining:
(1) Enter heading in solid caps.
(2) Fill the line directly below the heading with hyphens (-) for the length
of the heading.
(3) The next line remains blank.
(4) Text begins on third line below the heading.
I
J
I
\
I
l
'
' .1
~
'
.
1 .
i
·i
l
l
c
DOE 1323.4C
lt-?lt-B'(
7. PROCEDURES.
0 3 (and 4)
a. Weekly reports shall be submitted to the Office of the Executive
Secretariat, MA-292, Room 7E-054, no later than noon each Friday, or
noon the preceding Thursday in the event Friday is a holiday.
Section 2
b. In those instances where classified information is involved, two separate
versions of the Weekly Report to the Secretary shall be prepared. This
will assure that careful control is maintained over classified informa
tion while providing wide dissemination of those information items which
are unclassified.
c. Weekly reports shall be signed by Heads of Departmental Elements,
including titles.
d. Organizations responsible for field elements shall consolidate such
information rather than submit separate reports.
e. Negative reports are required.
8. EARLY WARNING ITEMS. As outlined in Chapter IV, DOE 1325.1A, CORRESPONDENCE
MANUAL, of 6-18-81, the Alert Bulletin (see Attachment 3) shall be used to
report any information which may be needed by top levels of management
before a more formal report can be made. The use of an Alert Bulletin does
not obviate any other requirements for a report.
BY ORDER OF THE SECRETARY OF ENERGY:
® HARRY L. PEEBLES
Director of Administration
I
.J
J
..
DOE 1323. ';C
4-z4-87
0
WEEKLY REPORT EXAMPLE
(plain bond)
Attachment 1
Page 1 (anrl 2)
(Date)
Weekly Report for .••••... (appropriate program area) ..•.•.....
CURRENT
0
0
···································································· •.•.•••••..••••••.• Short paragraph summaries of ...•.••...........•
....•••.•••.•.•••••• major events and developments ......•••••••....
.•...••.•••••.•••••.•.•...•..••.... (A. B. Green, DP-1, 586-1234)
....................................................................
........ ································· ··················· ....... . ........................................ ........................... . .......................................... ......................... .
•••.••••••.•••••••••••.•••.•••••••. (E. F. White, DP-24, 586-2345)
FUTURE (If appropriate)
0
0
······················································ ............. . ............................................ ....................... .
···································································· ....................................................................
.•.••.••••..••••••••.•...••.•••..•• (G. H. Black, DP-20, 586-4567)
....................................................................
................................. ...... .. . ............. ........ .... .
............................................. .. ....... ............. .
................. ..................... .. ........ ...... .. ........... .
..... ............... ....................... ........ ............. ... .
................................... (!. J. Grey, DP-2, 586-5678)
C. J. Cooper
Assistant Secretary for
Defense Programs
OOE 1323.4C
11-24-87
WEEKLY REPORT EXAMPLE
(plain bond)
Attachment 2
Page l (and 2)
(Date)
Weekly Report for •••••... (appropriate field element) ........••
CURRENT
0
0
....................................................................
. . . • • • • • . . . . . . • • • • . Short paragraph sumaries of ••••.•.•••••.••••••
.•..•.•.....•...•••• major events and developments •••....•••••••.••
• • • . • . • • • • • . . • • .• • • • • • • ••••••••.••• (A. B. Green, AMAA, FTS 972-1234)
...•..•.•.•••••••••••••••••.•.•..•• (E. F. White, DMED, FTS 972-2345)
FUTURE (If appropriate)
0
0
...•.•..•••••••••.•••.••••••••••••• (G. H. Black, BAO, FTS 972-4567)
............................•...... (I. J. Grey, AA., FTS 972-5678)
C. J. Cooper, Manager
Chicago Operations Office
[C
I
0
UOE 1323.4C
4-24-87
0 0
ALERT BULLETIN
DEPARTMENT OF ENERGY
ALERT BULLETIN
Opposition to Nuclear Power. Citizens for Peace will
demonstrate in front of Savannah Area Office on 4-20-83.
Expected group - 100 to 300 citizens from Pohunk, SC area.
(DP-lOO.l:ABDekay:586-5075:4-19-83).
EXPEDITE HAND-CARRY